ID Date Author Statusdown Type Category Important Subject Icon
  936   Mon Oct 7 09:31:13 2024 Entered by Super Team from 134.158.195.141 on Mon Oct 7 09:30:50 2024FixedInfoLinac Commissionning   

pression SF6: 2.3 bar

(nb: redémarrage pc modulateur demain mardi 8/10 à 9h00)

  953   Tue Nov 5 17:30:10 2024 Entered by Viktor Soskov from 134.158.195.153 on Tue Nov 5 17:29:48 2024FixedInfoLaser Laser-cathode 

Bonjour, le laser (miroirs du parcours optique) a ete realigne.

L'etat actuel: l'enrgie sur la cathode ~ 80µJ ( Iris 1.3mm, Att 420)

Viktor.

  958   Tue Nov 12 10:36:39 2024 Entered by Viktor Soskov from 134.158.195.153 on Tue Nov 12 10:36:24 2024FixedInfoLaser Salle laser ThomX 

Bonjour , l'intervention du Dalkia sur le CTA de la salle laser est terminee.

Viktor.

  961   Thu Nov 14 09:21:51 2024 Entered by Viktor Soskov from 134.158.195.153 on Thu Nov 14 09:21:36 2024FixedInfoLaser Etat laser 

Bonjour, rien n'a change au faisceau laser (distribution reste le meme,l'energie sur la cathode =60mkJ, Iris = 1.3mm, Att =420).

J'ai termine les mesures. On peut demarrer.

Viktor.

  973   Wed Dec 4 10:54:28 2024 VCFixedFixSY Frequence anneau et systeme de synchro 

Rappel:

la fréquence de l'anneau doit etre modifiée avec l'insterface RING RF cavity :

Ring RF doit etre divisible par 15 à 5 chiffres après la virgule (cela fait des pas de 150Hz sur le 500MHz)    c'est la limite du matériel qui sert pour la synchro (toutes les solutions de fréquence ne répodant pas à cette limite  ne sont pas des solutions viables pour la machine)

en cas de changement de fréquence il faut vérifier que le timing (répétion de la marchine 25 10 ou 1Hz )soit stable sur l'oscilloscope .

si ce n'est pas le cas il faut changer la phase du générateur Rigol 33MHz avec le script (commande)   ./phase_shifter_rigol.py --phase "value"  (value = nombre)  (dans panneaux/synchro)

si cela ne fonctionne pas (pas de solution timing stable ) prévenir l'équipe synchro

 

Fréquence Ring actuelle 500.09595 MHz  =>  /15=  33.33973MHz

 

 

 

 

 

 

 

  976   Fri Dec 6 11:11:31 2024 VC MJFixedShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Installation du PM dans la X-hucth 

Le PM est installe dans la X-hutch (PM + gene + ocsillo), on a  test que ca fonctionne -

Il manque juste un cable HT plus long pour positionner l'ampli de facon secure (Vincent lundi)

  982   Tue Dec 17 23:26:45 2024 Entered by Marie Jacquet from 134.158.205.16 on Tue Dec 17 23:26:26 2024FixedShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning shift 17/12 - scan vert FPC - 50 MeV 

8h10 : mise en chauffe de la machine (modulateur, laser, frigo et chiller)

9h30: faisceau dans anneau avec 100pC injecté

Problème modulateur (interlock tension) ==> attendre que la perverance déscende en trig à faible tension pendant 1h (Maher a augmenté la valeur du threshold, le problème ne devrait pas revenir)

9h35 HV is 1214 V, RF Gun phase is 176 dg. Sect. Att. 2.578 dB, Phase is 216 dg. Charges -84 pC, -72 pC, -76 pC

10h40 HV 1215 V

13h24 Linac steerers H [2.65 -4.29], V [-1.8  2.07] RF Gun Phase 175 dg. Sect. Att. 2.564, Phase 217 dg. Charges: -117 pC, -117 pC, -127 pC

synchronisation laser/electron autour de 4ns (trigger, 33MHz CFP).

** Scan FPC table vertical 50 MeV 10 Hz
     aller : 10-57-18.csv ==> sigma_scan = 140 um ==> sigma_e ~ 124 um
     retour : 11-09-47.csv ==> sigma_scan = 144 um ==> sigma_e ~ 128 um

** Scan one trig aller 11-19-31.csv ==> sigma_scan = 80 um ==> sigma_e ~ 47 um

** Mesure perte de charge avec BPM en mode one Trig
      T_end-T0 ~ 11 minutes
      charge T0 ~ 3.8 e^7
      charge T_end ~ 4.0 e^6
      Baseline ~ 2.8 e^6
         --> Q(T0)/Q(T_end) ~ 30

** Viktor optimise l'injection - scan  : scan 16-05-16.csv ==> sigma_scan = 133 um ==> sigma_e ~ 116 um

==> gain  en flux (facteur 2-3, ~ 15-20 10³ pA à 40 -50 10³ pA)

** Beaucoup de steerers dans la ligne de transfert (~ 10A pour l'horizontal 2 et 3)

** 17h: Scan à "haute" charge (120pC --> 150pC) : scan 17-02-55 ==> sigma_scan = 165 um ==> sigma_e ~ 152 um

** 17h05 : Scan avec iris à 1.3mm --> 1mm (110pC) :
      scan 17-13-04 ==> sigma_scan = 152 um ==> sigma_e ~ 137 um

** 17h15 : test single trigger

 

PS : les flux des 6 scan desynchro en pj sont encore a traiter/comprendre (selon taille e-, charge, iris, optim injection)

Attachment 1: fit-10h57.png
fit-10h57.png
Attachment 2: fit-11h09.png
fit-11h09.png
Attachment 3: fit-11h19.png
fit-11h19.png
Attachment 4: fit-16h05.png
fit-16h05.png
Attachment 5: fit-17h02.png
fit-17h02.png
Attachment 6: fit-17h13.png
fit-17h13.png
  984   Wed Dec 18 11:59:49 2024 Entered by Viktor Soskov from 134.158.195.153 on Wed Dec 18 11:59:34 2024FixedInfoLaser Laser-cathode 

Bonjour, le laser-cathode a ete realigne (miroir M5, miroir dans la salle laser). L'energie UV sur la cathode 55 µJ, Iris =1.3mm; Att=440

  998   Thu Jan 16 11:57:51 2025 Entered by Marie Jacquet from 134.158.89.45 on Thu Jan 16 11:57:39 2025FixedShift summaryLI | TL | Ring | Aimants Resultats Tour de cle Q1-Q3 - Shift 15/01 

Prise de donnees axe Q1Q3 du 14/01

Steerers  Axe q1q3     : str1[H V] = [2.45 -1.83]  
                                     
str2 [H V]=[-4.43 2.22]
               Axe section : str1[H V] = [1.50 -3.30]
                                      str2 [H V]=[-3.83 4.16]

                                     (section pas bien alignee du tout ... valeurs des steerers = melanges de align_standard et de xopt  elog_917 19/09/2024)

Prise de donnees axe Q1Q3 du 15/01 apres tout de cle q1q3 par Alex G. : le but etait de "pousser Q3 vers le MUR"

Steerers Axe q1q3     : str1[H V] = [2.62 -2.06]
                                     str2 [H V]=[-4.52 2.43]

              Axe section : idem que 14/01

CONCLUSION :
     Axes reconstruits en pj --> Le tour de cle a ete fait dans le mauvais sens
(Q3 a ete pousse vers l'anneau ...)
     Confirme apres discussion Alex
     Et confirme aussi en faisceau : les quads de la TL semblaient apres le tour de cle encore plus desalignes qu'avant par rapport a q1q3 ...

A refaire sem pro dans le bon sens

Attachment 1: Tour_de_cle_Q1Q3.png
Tour_de_cle_Q1Q3.png
  1001   Tue Jan 21 14:24:22 2025 MJ KDFixedShift summaryTL | Ring | Linac Commissionning | Ring Commissioning align Q1Q3 et pt fonctionnement 61.5 MeV 

*** Alignement meca Q1Q3

9h30 : 1 tour de cle Q3 vers le mur ( = retour a la position initiale)
Mesure en faiseau Q1Q3 versus Q4Q7 + Mesures confrontees a simu dipole  ==>  14h : 1 Tour de cle Q3 vers le mur (+ 1/2 tour Q1 vers le mur, pour voir)
Mesure ==> 15h24 : 1/2 tour Q1 vers anneau
Un peu mieux Q1Q3 versus Q4Q7. On s'arrete la pour align meca

Nouvel alignement axe Q1Q3:
   H1 0.76
   V1 -3.42
   V2 3.45
   H2 -2.93

Stockage dans l'anneau (nouvelle align QUAD + derniere recette + rcds)

REMARQUE IL FAUT ARRETER de mettre le SEPTUM et KICKERS a des courant trop bas : il faut mettre SEPTUM a 6A et KICKER a 40 mA

 

*** TL a 61.5 MeV

Passage jusqu'a SST03 (cf screenshot)
Mesure d'energie avec steerer TL1H : 61.3 a 61.8 selon les mesures
Recette sauvegardee sous TL LE : good_20250121_17_00_31

 

** Injection 61.5 MeV

Scaling de la recette anneau *1.23 (61.5/50 MeV) + RCDS
Essai d'injection avec ajustement quad anneau "a la main" - cf screenshot
Recette sauvee (injection 61.5 MeV)

 

** Kicks faiscau

Il nous a semble voir que les kicks sont correles a des pics jauges vides - Prise de donnees sur 15-30 minutes a faire (pas eu le temps aujourd hui)

 

** Donnees nouvel axe q1q3 prises

 

fin de shift

 

 

Attachment 1: sst03_61_5MeV_2025-01-21_16-50-30.png
sst03_61_5MeV_2025-01-21_16-50-30.png
Attachment 2: tbtsum_sansRF_61_5MeV.png
tbtsum_sansRF_61_5MeV.png
  1002   Wed Jan 22 13:32:43 2025 MJ HGFixedShift summaryTL | LE | Ring | Linac Commissionning   

** Alignement Q1Q3 du jour

str1H 0.69
str1V -3.03
str2H -2.94
str2V 3.39

Passage TL min dispersion (phase sec 214 - att 2.56)

*** Alignement SECTION

str1H 1.64
str1V -1.94
str2H -3.77
str2V 2.87

Avec cet alignement, pour une excursion de phase de 180 a 250, le faisceau bouge seulement de 1 mm sur YagTL1
==> La section est alignee avec ce jeu de steerers
(aux kicks faisceau pres ...)

- Charge transmise vs soleno : ok de 190A a 240 A - cf screenshot
- Mesures d'emittance Q3 section alignee MAIS attention : PAS a la bonne phase section ! (254 au mieu de 214 .....)

** Mesures yagTL1 et bpmTL1 prises pour Alignement section et pour Alignement Q1Q3

*** Kicks faisceau bpmTL1 : Correles a Li/Vac 02 et Li/Vac 03 (screenshot dans data/shared)

20h20 fin de shift

 

Attachment 1: Q_vs_SolenoScan_at_17-21-28.png
Q_vs_SolenoScan_at_17-21-28.png
  1036   Thu Mar 13 11:25:29 2025 Entered by Viktor Soskov from 134.158.195.153 on Thu Mar 13 11:25:13 2025FixedLinacLaser Etat laser 

Bonjour, le parcours optique a ete realigne.

L'enegie UV sur la cathode = 48uJ , Iris = 1.3mm, Att = 410

  1037   Thu Mar 13 11:57:19 2025 Entered by Viktor Soskov from 134.158.195.153 on Thu Mar 13 11:57:03 2025FixedInfoLaser Etat laser 

Voici les distibutions UV laser sur lacathode avant et apres l'alignement

Attachment 1: Avant.png
Avant.png
Attachment 2: Apres.png
Apres.png
  1059   Fri Apr 18 08:23:13 2025 VM, IC, NDFixedProblemLI Measurements 18/4 

08h21 Thomx Started: modulator, frig, laser

08h27 Chillers started, cycling all magnets

09h32 HV is 'ON'

09h34 Cannot control the section attenuator

09h50 The issue with the section attenuator was fixed: its server was shut down and restarted, but it was set to 0 dB!!

11h17 RF Gun phase 171 dg., Sect phase is 211 dg. Att. 2.62 dB, TL/BPM2 X=2mm, Charges (from BPMs at Att. 31 dB): -77pC, -77pC, -86pC . Linac steerere: H [1.03 -3.47], V [-1.88 2.63]

Contradictions with ICTs:  -87 pC, -73 pC, -80 pC

Beam in the ring

11h40 RCDS on injection receipt all_20250418_11_39_40, RF cav. at 100 kV, phase 16.5 dg., screanshots

12h03 Linac was reajusted. RF Gun phase is 166 dg., sect. phase is 210 dg. Att. 2.58 dB, TL/BPM2 X=3 mm RF cav. 100 kV, phase 13.5 dg. screenshots

12h10 Ring dipoles were changed from 160.4 A to 159.3 A, ring quads were adjusted and tune as well was set back to 0.17. TL/BPM2 X = 0. Screenshots 

12h25 RF Gun phase was adjusted to 161 dg.

15:24 Initial Synchro delay for streak camera: -6.60us. Injection at delay of +99.3e3us

Measurements incuding single shots

Study of the injection and of long decays with the streak camera, cf images. Horizontal scale is 2ms, vertical scale is 600ps.

Operating the streak camera create instabilities on the ring 500MHz that may cause phase problems.

16h47 RF Gun phase is 149 dg. RF cav. was at  200 kV, phase 10.5 dg.

17h26 Stop thomx

Attachment 1: Screenshot_from_2025-04-18_09-42-24.png
Screenshot_from_2025-04-18_09-42-24.png
Attachment 2: injection_sequence_blank2ms_009.png
injection_sequence_blank2ms_009.png
Attachment 3: injection_sequence_blank2ms_003.png
injection_sequence_blank2ms_003.png
Attachment 4: injection_sequence_blank2ms_002.png
injection_sequence_blank2ms_002.png
Attachment 5: injection_sequence_blank2ms_036.png
injection_sequence_blank2ms_036.png
  1116   Tue Sep 9 15:19:47 2025 Entered by Marie Jacquet from 134.158.205.21 on Tue Sep 9 15:19:28 2025FixedShift summaryLI | TL | LE | Ring X-rays - Recherche on-axis avec script fwhm - Prise de qq spectres - Mesure taille source 

** spectre CdTe avec feuille Au (pour calib)

** Utilisation du script FWHM des spectres, mapping 2D - Enregistrment spectres dans /data/shared (5x5 positions a chaque lancement du script).

** Prise de qq spectres autour de la position on-axis (position estimee juste avant avec le script)

** Mesure taille source "methode fentes 1" (images photonic science)

  1124   Wed Sep 17 16:56:59 2025 HG, MJFixedShift summaryLI | TL | LE | Ring Quads scans Q3 et Q7 + Courbe energie vs Phase section 

Modulateur HT @600 V indecision

Question : Quand on switch off le Dipole de la TL (Linac) le faisceau prend un kick ( - 0.1 mm sur le BPMx,  et 0.2 mm BPMy) --> déjà observé ?

Vers 13h30

Min de dispersion pour phi_Section 246° et Att : 0.15

** Energie vs Ph_sec

Phi246 : Ekin :68.05 (Dispersion min Yag TL2)
Phi248 : Ekin :68.49
Phi250 : Ekin :68.27
Phi252 : Ekin :67.88
Phi254 : Ekin :67.65
Phi256 : Ekin :68.17
Phi258 : Ekin :66.8
Phi260 : Ekin :66.9
Phi264 : Ekin :65.5

244° (avec backlash) pour avoir disp min TL2  -  250.8 dipole pour BPMTL2X = 0

** Quad Scans

Conditions : q1 q2 q3 q4 q5 q6 : -0.25  / 4.9 / -4.77 / 2.94 / 2.94 / -5.6

Scan Q7 a Phi_sec=248
       emitX=3.1  (14h04)
       emitY=2.2  (13h59)

Dipole OFF  -  Scan Q3 a Phi_sec=248  (14h56 seulement car probleme de code qui beuguait)
       emitX=1.6
       emitY=3.9

Dipole ON  -  Scan Q7 a Phi_sec=248 (bis)   15h08
       emitX=2.8
       emitY=2.6

Dipole ON  -  Scan Q7 a Phi_sec=248 (ter)   15h14
       emitX=2.8
       emitY=2.5

Dipole ON  -  Scan Q7 a Phi_sec=246   15h17
       emitX=2.3
       emitY=2.5

Dipole ON  -  Scan Q7 a Phi_sec=244   15h23
       emitX=3.1
       emitY=2.4

Dipole ON  -  Scan Q7 a Phi_sec=246 (bis)   15h35
       emitX=2.5
       emitY=2.8

Dipole OFF  -  Scan Q3 a Phi_sec=246  15h39
       emitX=1.7
       emitY=3.6

** Check min espread ecran TL2 : min espread ph_sec 245-246   (15h43)

** De nouveau Energie vs Ph_sec (q1 q2 q3 = 0) (pour voir precision, effet aller-retour, backlash)   (16h)

Data ci-dessous ==> data traitees : cf. pj

Phi245 : Ekin :68.7
Phi246 : Ekin :69.0
Phi247 : Ekin :69.0
Phi248 : Ekin :69.9
Phi249 : Ekin :68.5
Phi250 : Ekin :68.4
Phi252 : Ekin :67.7
Phi254 : Ekin :67.1
Phi256 : Ekin :67.3
Phi260 : Ekin :67.0
Phi264 : Ekin :64.3
Phi267 : Ekin :62.9

Je repars de plus bas et je monte
Phi225 : Ekin :67.4
Phi215 : Ekin :64.5
Phi225 : Ekin :65.2
Phi230 : Ekin :67.5
Phi235 : Ekin :68.2
Phi235bis : Ekin :68.7
Phi235ter : Ekin :68.1
Phi237 : Ekin :67.8
Phi239 : Ekin :68.3
Phi240 : Ekin :69.0
Phi241 : Ekin :68.9
Phi242 : Ekin :69.3
Phi243 : Ekin :68.7
Phi244 : Ekin :69.9
Phi245 : Ekin :69.8
Phi246 : Ekin :69.5
Phi247 : Ekin :69.4
Phi248 : Ekin :68.7
Phi249 : Ekin :68.4
Phi251 : Ekin :68.2
Phi254 : Ekin :64.3
Phi254bis : Ekin :68.3
Phi257 : Ekin :67.9
Phi262 : Ekin :66.7

Je redescends
Phi257 : Ekin :66.0
Phi257bis : Ekin :68.4
Phi257ter : Ekin :66.0
Phi257quatro : Ekin :67.2
Phi254 : Ekin :67.0
Phi251 : Ekin :67.6
Phi248 : Ekin :67.7
Phi248bis : Ekin :67.8
Phi247 : Ekin :69.5
Phi246 : Ekin :69.2
Phi246bis : Ekin :68.3
Phi246ter : Ekin :68.3
Phi246quatro : Ekin :69.9
Phi245 : Ekin :69.3
Phi244 : Ekin :69.8
Phi244bis : Ekin :67.7
Phi244ter : Ekin :67.3
Phi244quatro : Ekin :69.2
Phi243 : Ekin :67.2
Phi242 : Ekin :68.3
Phi241 : Ekin :69.0
Phi240 : Ekin :67.0
Phi237 : Ekin :69.7
Phi235 : Ekin :67.0
Phi232 : Ekin :68.6
Phi232bis : Ekin :68.5
Phi228 : Ekin :66.1
Phi225 : Ekin :66.4
Phi225bis : Ekin :67.2
Phi225ter : Ekin :66.9
Phi225quatro : Ekin :65.5

 

 

 

 

Attachment 1: 2025-09-17-Energie_vs_PhaseSection.pdf
  1148   Mon Nov 10 16:15:53 2025 KD, M2 GIFixedShift summaryLI | TL | Linac Commissionning shift du 10 novembre 2025 

8h: mise en chauffe en remote (modulateur, laser, frigo/chiller)

10h: Démarrage machine

 

*** Programme TP ***

- mesure charge/phase et Energie/phase du canon

- Mesure beam parameters sortie section + energy et energy spread

 

  Draft   Thu Nov 13 08:00:59 2025 KD MJ VM HGFixedShift summaryLI | TL | LE | Ring | Opt | Linac Commissionning | Ring Commissioning shift du 13 novembre 2025 - spectres a differentes valeurs de bpmTL2_X 

Apres que Kevin a regle tous les problemes synchro signal bpm etc etc etc

L'interface SST ne fonctionne pas - URGENT  ==> probleme resolu 

Libera 2 et 4 reboote une 2eme fois ...

Faisceau dans l'anneau

15h15 toujours impossible de locker la cavite FP, pour une raison inconnue ==>  Shift reporte

Several manual BBA steps were performed in the Hor. plane for Ri-C1/QP01 to find the offset change in Ri-C1/BPM01.

16h46 Stop ThomX

 

  1188   Thu Feb 5 13:18:03 2026 KD, HG, VMFixedInfoLI | TL | LE | Ring | CC | Laser | Opt | MECA | SY | Vide | Electronique Laser PC status 

** l'iris a été changée et est opérationnelle

/!\ problème dans l'offset il faut ajouter 0.5mm à la valeur relu par Tango (pour 1.3mm il faut mettre 0.8 mm dans l'ATK panel)

** Laser PC ***

- Sortie Laser: 85 - 90 uJ (avant 250 uJ)

- Injectée ligne transport: 80 uJ (235 uJ)

- Sortie ligne transport: faisceau trop gros pour une mesure correct (188 uJ)

- Sortie Iris (ouverture max): 65 uJ (175 uJ)

- Sortie iris (1.3mm): 28uJ (51 uJ)

- injectée canon (iris 1.3 mm, 420 pas) : 22 uJ (43 uJ)

On a environ 2 fois moins de puissance laser disponible pour les e-, les 100pC devrait etre atteignable

/!\ refaire un alignement cathode ! le point à bougé (ouverture canon, réalignement laser).

*** Synchro ***

non testée pour le feedback de phase. 

16h00 HV is on

Section and RF gun processing

17h05 HV 990  V, RF gun att. 0 dB, interlocks

It seems that the brakdowns are in the waveguides, not in the RF gun.

17h31 HV 1010 V, Sect Att. 22 dB, RF gun Att. 10 dB

17h34 HV 1030 V, Sect Att. 22 dB, RF gun Att. 10 dB, interlocks

17h45 Stop ThomX

Attachment 1: Screenshot_from_2026-02-05_17-11-35.png
Screenshot_from_2026-02-05_17-11-35.png
  1202   Wed Mar 4 08:35:23 2026 VM, MJ, DN, RCFixedShift summaryLinac Commissionning | Ring Commissioning Check point du fonctionnement anneau du 24/02 suite a l'ajout de resistances dipole le 24/02 au soir 

08h35 Warm-up ThomX: Modulator, Laser, Fridge

Programme shift : verifier que la recette orbite plate utilisee lors du shift du 24/02/2026 (= orbite PLATE, vers 15h) est toujours ok apres l'ajout de resistance sur dipole anneau (resistance installee apres le shift, = le 24/02 au soir)

08h40 Chillers were started, cycling all magnets.
09h47 HV is on but there are no triggers. Failed to connect to device li/op/opt.02-las.01-asp.01. The photocathode laser control mashine is off.
10h10 The photocathode laser control mashine is on. The laser amplifier was started.
10h29 Misstriggering caused modulator interlocks
10h44 It is OK with triggering, exept the photocathode laser.
11h15 Laser is ok, phase 133 dg.

11h48 The laser spot moves out of the screen, Hayg fixed it

12h35 Transfocator_20260225_17_33_57.txt loaded. Linac steeres were adjusted. Laser phase 127 dg., Sect. att. 2.532 dB, sect. phase 225 dg. linac steerers: H [-0.21 -2.66], V [-2.47 3.32], RF 100 kV, phase -39 dg., charges around -100 pC

On ne voit pas le centre du faisceau X sur DECTRIS - Trop allonge verticalement
Viktor "ajuste" la recette ==> on voit un tout petit petit petit peu mieux le centre ...
Flux < 5000  .....
Scan FPC ==> faisceau enorme cf screenshot 1_scanFPC_recipe_ou_on_voit_le_centre.png

Retour recette du depart orbites a peu pres plates plates
Flux minuscule
Scan FPC ==> faisceau enorme cf screenshot 2_scanFPC_receipe_FLAT_centre_pas_visible.png

Optimisation phases etc par Viktor
Flux minuscule
Scan FPC ==> faisceau enorme cf screenshot 3_scanFPC_receipe_FLAT_OPTIM_centre_pas_visible.png 

16h58 Standby, removing the additional shunt resistor from the bend #3

17h42 HV is on

18h00 recipe_recipe_LI_TL_RI_all_20260224_14_54_20.txt loaded
Faisceau a peu pres au centre du tube
Flux ~ 20.000
Comparaison avec shift du 24/02 (spectre onaxis et V+40) ==>
cf screenshot compar_20260224_20260304_after_cut_resistance.png 
==> c'est OK, spectres tres similairees

18h26 ThomX stopped

CONCLUSION : impossible d'obtenir un faisceau electrons correct avec la nouvelle resistance. Retirer la resistance a permis de retrouver les resultats du 24/02

DEMAIN : demarrage des etudes matching a ce point de fonctionnemenet
A 100 pC
  - Sol 230
  - Sol 242
  - Sol 250 100 pC,
puis SOL 230 a 200 pC 

Attachment 1: Screenshot_from_2026-03-04_14-29-12.png
Screenshot_from_2026-03-04_14-29-12.png
Attachment 2: Screenshot_from_2026-03-04_14-00-48.png
Screenshot_from_2026-03-04_14-00-48.png
Attachment 3: Screenshot_from_2026-03-04_18-19-20.png
Screenshot_from_2026-03-04_18-19-20.png
Attachment 4: 1_scanFPC_recipe_ou_on_voit_le_centre.png
1_scanFPC_recipe_ou_on_voit_le_centre.png
Attachment 5: 2_scanFPC_receipe_FLAT_centre_pas_visible.png
2_scanFPC_receipe_FLAT_centre_pas_visible.png
Attachment 6: 3_scanFPC_receipe_FLAT_OPTIM_centre_pas_visible.png
3_scanFPC_receipe_FLAT_OPTIM_centre_pas_visible.png
Attachment 7: compar_20260224_20260304_after_cut_resistance.png
compar_20260224_20260304_after_cut_resistance.png
ELOG V3.1.4-395e101