  Toutes les notes concernant les Commissionning de ThomX, Page 42 of 62  Not logged in ThomX    logo
ID Date Author Statusdown Type Category Important Subject Icon
  397   Fri Mar 11 14:10:11 2022 Entered by Viktor Soskov from 134.158.195.153 on Fri Mar 11 14:09:56 2022FixedInfoLaser Laser status 

Actuellement on a 50 µJ  sur la cathode  après une rotation du hublot.

  406   Fri Mar 18 10:34:19 2022 Entered by Viktor Soskov from 134.158.195.153 on Fri Mar 18 10:34:03 2022FixedInfoLinac Commissionning Laser status 

L'energie UV sur la cathode = 30µJ

  414   Thu Mar 24 09:44:28 2022 Entered by Nicolas Delerue from 134.158.195.144 on Thu Mar 24 09:43:47 2022FixedShift summaryDiag | CC | RF D1 Mesures 24/3/2022 

Operateurs: ND, VC, SC

===

 

Modulateur demare 9h

** Test IHM prises connectées

*** Baie 17: Plus de prises electriques disponibles. Alim branchee sur une autre baie pour les tests.

10h15 Ronde terminee. Il n'y a plus de surchausses a l'entree sud => Ticket 13025

Le PSS indique "Default centrale SSI" => Ticket 13026

Apres avoir tourne quelques clef le PSS est OK => Voir entree 415 https://elog.lal.in2p3.fr/THOMX/Commissionning/415

10h28 Modulateur allume

10h54 Tir unique OK => optimisation de l'ergonomie de l'IHM

11h09 Interlock modulateur Klystron/RFOut InputMissing

=> standby pour 1h

11:18 Tentative de git pull dans /data/shared/Interfaces/panneaux mais les permissions ont ete changees

11:25 Acces recharge surchausses

12:00 Git Pull OK

11:30 Pb Modulateur

12:30 Tentative redemarrage => Pb Modulateur...

14:15 Interface switch RDP OK

14:30 Redemarrage

16h16 Transport OK

Etude de charge

16h51 Pb modulateur (voir fichier joint).

16h55 Redemarrage OK

17h19 Laser delocke

17h24 Arret machine

 

 

 

 

===

Voici le programme de la journee:

* Tâches sans faisceau (à faire quand on a un temps mort)
- Test IHM prises connectées (x2) FAIT


* Tâches demandant beaucoup d'accès
- impédance de la FC
- tests OTR

* Tâches depuis la salle de contrôle
- calibration des mesures de charges (+BPM) EN COURS
- test AcqAttrManager
- IHM transport charge
 

  415   Thu Mar 24 10:34:15 2022 Entered by Nicolas Delerue from 134.158.195.144 on Thu Mar 24 10:34:03 2022FixedFixInfra | Linac Commissionning config clefs PSS 

Operateurs: VC, SC, ND

Pour memoire, cf photo...

  416   Thu Mar 24 15:41:18 2022 Entered by ND/VC/HG/SC from 134.158.195.142 on Thu Mar 24 15:41:04 2022FixedLinacLinac Commissionning Alignement laser 

Position moteur M4 avant alignement laser :

x = 380 et y = 5373

Position moteur M4 après alignement laser :

x = 580 et y = 5373

Image laser avant (prise par Hayg) =

Image laser après =

 

  418   Thu Mar 24 17:26:38 2022 Entered by Super Team from 134.158.195.142 on Thu Mar 24 17:26:25 2022FixedLinacLinac Commissionning Arrêt faisceau 
  422   Mon Mar 28 16:54:30 2022 Entered by HM/SC/JNC from 134.158.195.142 on Mon Mar 28 16:54:16 2022FixedLinacLinac Commissionning Arret faisceau 

Transport du faisceau jusqu'au dump avec solénoides, steerers et quadrupoles on

  424   Mon Apr 4 10:50:19 2022 Entered by Super Team from 83.202.31.199 on Mon Apr 4 10:50:04 2022FixedInfoLinac Commissionning Planning cette semaine 

  426   Mon Apr 4 17:00:13 2022 Entered by Viktor Soskov from 134.158.195.153 on Mon Apr 4 16:59:57 2022FixedInfoLinac Commissionning Laser status 

Un hublot a ete change Si->CaF2. Energie UV sur la cathode 52µJ, Iris est dispo.

  429   Wed Apr 6 10:47:31 2022 Entered by Viktor Soskov from 134.158.195.153 on Wed Apr 6 10:47:13 2022FixedInfoLinac Commissionning Laser status 

L'image du laser a été aligné au centre de la camera. L'énergie sur la cathode=37µJ. Diamètre IRIS a été augmenté de 2.8  à 5mm. Signal  photodiode =75mV.

 

  430   Wed Apr 6 11:22:03 2022 JNC/HG/CBFixedInfoLinac Commissionning avant démarrage 

Test steerers avec le gaussemètre de PHIL

ajout de mumetal pour arreter le champ de la pompe au niveau de l'entrée

Visite

intervention Olivier et Maher pour le pilotage des aimants pulsés

intervention de Viktor, pour réaligner la camera sur la table photocathode

 

  433   Thu Apr 7 11:31:31 2022 Entered by Viktor Soskov from 134.158.195.153 on Thu Apr 7 11:31:17 2022FixedInfoLinac Commissionning Laser status 

Hublot_1 (dans la salle laser) a été enlevé, hublot_2 (casemate) - changé pour CaF2.

L'nergie sur la cathode = 62µJ (IRIS=3mm)

  434   Thu Apr 7 12:51:41 2022 Entered by Viktor Soskov from 134.158.195.153 on Thu Apr 7 11:31:17 2022FixedInfoLinac Commissionning RE: Laser status 

 

Entered by Viktor Soskov from 134.158.195.153 on Thu Apr 7 11:31:17 2022 wrote:

Hublot_1 (dans la salle laser) a été enlevé, hublot_2 (casemate) - changé pour CaF2.

L'nergie sur la cathode = 62µJ (IRIS=3mm)

Stabilité :

La stabilité reste bonne

mean x 5460.00 µm    +/- 10.14 µm
mean y 3173.65 µm    +/- 8.58 µm
FWHM x 928.64 µm    +/- 67.32 µm
FWHM y 918.32 µm    +/- 26.75 µm

Iris : on est passé de 3mm à 1.5 mm.

  438   Tue Apr 12 09:08:20 2022 Entered by Viktor Soskov from 134.158.195.153 on Tue Apr 12 09:08:05 2022FixedInfoLinac Commissionning Laser status 

Laser est allumé. Gate - False.

  441   Thu Apr 14 09:56:11 2022 Entered by VC/ND/SC from 134.158.195.141 on Thu Apr 14 09:55:56 2022FixedInfoLinac Commissionning Faisceau pour les diagnostics 

Le programme de la journée :

- Morning: Iryna, Slava + Viktor

- From 13h : Nicolas+Vincent+Sophie
Alexandre is only available remotely

Measures (by priority):

- Faraday Cup impedance (Vincent) [May require several access]
- Take 1000 shots (raw ICT+FC+BPM) with stable beam to the TL dump
for charge measurement calibration (Nicolas)
- Test quadrupoles (Iryna+Slava+Viktor)
- Record BPM reading versus screen reading while steering the beam
and repeat after cycling the quads (Nicolas)
- Take 100 YAG images and 100 OTR images (Nicolas)
- Switch to AcqAttrManager mode (Nicolas)
- Test GUIs (Nicolas):
- Beam recipe
- AcqAttrManager switching IHM
- Beam start
- Beam steering
- Charge transport GUI

  445   Mon May 2 10:30:35 2022 Entered by JNC/VC from 134.158.195.141 on Mon May 2 10:30:21 2022FixedLinacLinac Commissionning Fermeture machine 

Jean Noel a fermé la fosse nord, Elle est INONDEE, on va faire un ticket aux infras.

La casemate est fermée, le vide, l'eau etc....., tout est ok.

Le modulateur est en chauffe.

  452   Tue May 10 10:11:37 2022 Entered by Viktor Soskov from 134.158.195.153 on Tue May 10 10:11:18 2022FixedInfoLinac Commissionning Laser status 

Devices:

....DIA.01-CTL.01 et LAS.01-ASP.01 fonctionnet.

  468   Tue May 31 09:21:02 2022 MO/SC/HG, JNC/CBFixedLinacElectronique Demarrage et faisceau 

9h15 : Mise en chauffe modulateur et chiller (SC/MO/HG)

Aujourd'hui : Alignement faisceau (CB, HG, JNC, SC)

Valeur max photodiode : hier on avait 62 mV sur le scope (JNC) et aujourd'hui on a 0.58 de valeur de signal sur taurus (HG, SC)

A 10h21 on a entre 0.6 et 0.62 de signal photodiode

Phase de charge max = 161 (identique à hier)

Mesure stabilité laser :

Perte modulateur 11h04 *2 (de trig à Hv)

Perte modulateur 11h06

mesure puissance RF

PIC = 216.3mV

PIS = 127.53 mV

PHOTODIODE u=66 mV

Valeurs BPMs avant scan

LI/DG/BPM.01-LIB.01 SpX = environ 0.65 mm, Spy = environ 0.45 mm

Position Ecran LI/DG/SST.01 Position X = 15.9 mm  Position Y = -11 mm

TL/DG/BPM.01-LIB.02 SpX = environ 5 mm, SpY = environ -1.2 mm

Position Ecran TL/DG/SST.01 Position X = 17.4 mm Position Y = 7.7 mm

Scan phase section avec COL2 = 187 A
/LI_STR_1H-0.0_LI_STR_1V-0.0_LI_STR_2H-0.0__LI_STR_2V-0.0/Scan_pos_phase_LIL__at_31-05-2022__14-25-49.png

Augmentation du Sp Threshold de TL/DG/BPM.01-LIB.02 à 250 au lieu de 150, cela fait disparaitre les pics parasites observés.

Seuil modifié aussi pour LI/DG/BPM.01-LIB.01 qui passe à 250 au lieu de 150.

COL2 = 187 A Scan phase section :

LI_STR_1H-1.25_LI_STR_1V0.3_LI_STR_2H-0.0__LI_STR_2V-0.0/Scan_pos_phase_LIL__at_31-05-2022__15-04-39.png
LI_STR_1H-0.0_LI_STR_1V-0.0_LI_STR_2H-0.95__LI_STR_2V0.2/Scan_pos_phase_LIL__at_31-05-2022__15-15-40.png
LI_STR_1H0.4_LI_STR_1V-0.4_LI_STR_2H-1.34__LI_STR_2V0.35/Scan_pos_phase_LIL__at_31-05-2022__15-43-06.png- 

-quelques analyses de positionnement du faisceau entrée sortie section avec et sans puissance RF (notes à reporter), on retrouve des tilt de 10 mrad et des offsets de 10mm à mettre à l'entrée de la section pour que le faisceau soit transmis

- Quad scan pour plusieurs valeurs de courant du solénoides 175A, 220A, et 210A

- Energie en fin de section 50.28 MeV, charge 100 pC avant et après section

Arret machine 23h30 (CB, JNC)

quelques arrets modulateur :

- 20h35 standby 1 fois

- 20h37 Hv 3 fois

- 23h13 HV 2 fois

Prochaine manipes la semaine prochaine :

- mesure de dimensions en sortie canon en fonction du courant du solénoides (en s'arrurant charge phase, et energie /phase, et dimension laser)

- encore un peu d'émalioration de l'alignement soléno à faire (en adaptant le script avec la variation de la phase, énergie et courat soléno)

 

 

 

 

 

 

 

 

  490   Mon Jul 4 10:28:03 2022 Entered by SC/AG from 134.158.195.141 on Mon Jul 4 10:27:45 2022FixedLinacLinac Commissionning Changement vis des aimants 

Changement des vis solenoides en cours

  499   Thu Jul 7 11:13:26 2022 Entered by Viktor Soskov from 134.158.195.153 on Thu Jul 7 11:13:10 2022FixedInfoLinac Commissionning Phototube_Signal 