  Toutes les notes concernant les Commissionning de ThomX, Page 42 of 62  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Status Type Category Important Subject Icon Text Attachments
  405   Thu Mar 17 17:54:29 2022 Entered by JNC/HG/AM/SC from 134.158.195.143 on Thu Mar 17 17:54:14 2022Under ProcessLinacLinac Commissionning Faisceau MeanStd fonctionne

Cyclage des dipoles Q01 Q02 et
Q03 fait
  
  404   Thu Mar 17 16:04:24 2022 Entered by HG/JNC/SC from 134.158.195.143 on Thu Mar 17 16:04:06 2022Under ProcessLinacLinac Commissionning Shutter laser photocathode Le problème sur le shutter qui reste
en orange à l'ouverture du laser
perdure.
  
  403   Thu Mar 17 15:27:35 2022 Entered by HG/JNC/SC from 134.158.195.142 on Thu Mar 17 15:27:21 2022Under ProcessLinacLinac Commissionning Transport faisceau Modulateur en marche

Transport faisceau jusqu'à
TL/DG/SST.01 
 2022-03-17_15_26_47_tl_dg_sst_01-ccd_01_RAW.png2022-03-17_15_30_48_li_op_las_02_log_scale_False_despeckle_False_min_scale_0_max_scale_20_18.png 
  402   Wed Mar 16 15:25:48 2022 CB/HG/JNC Shift summaryLinac Commissionning run du 16 mars 2022 plusieurs passage en standby modulateur,
pas très productif pour les mesures
aujourd'hui.
  
  401   Tue Mar 15 10:45:28 2022 CB/HG/JNC Shift summaryLinac Commissionning run du 15 mars 2022 Pompage du chemin optique laser

Position laser 818, 573 pixels,
dimension 0.5mm,  0.38mm, energie 48
 7x 
  400   Tue Mar 15 08:55:41 2022 Entered by Maher OMEICH from 134.158.91.212 on Tue Mar 15 08:55:25 2022 Shift summaryRF D1   Démarrage Modulateur et chillers   
  399   Mon Mar 14 16:40:24 2022 MO/JNC Shift summaryLinac Commissionning démarrage du 14 mars Modulateur 1090, 0 dB voie canon, 
1.5dB sur la section

Image laser enregistrée,
 trend_charge_pertelaser.png 
  398   Mon Mar 14 13:57:12 2022 Entered by Maher OMEICH from 134.158.91.212 on Mon Mar 14 13:56:48 2022 InfoRF D1   Bonjour,

Je recommande de mettre une consigne
de tension modulateur de 1000 V au démarrage
  
  397   Fri Mar 11 14:10:11 2022 Entered by Viktor Soskov from 134.158.195.153 on Fri Mar 11 14:09:56 2022FixedInfoLaser Laser status Actuellement on a 50 µJ  sur
la cathode  après une rotation
du hublot.
  
  396   Thu Mar 10 09:15:36 2022 Entered by Super Team from 134.158.195.141 on Thu Mar 10 09:15:18 2022Under ProcessUrgentInfra | Linac Commissionning intervention M Langlet en sous sol 9h : M Langlet a besoin de façon
urgente d'acceder au sous-sol.

Deverouillage de la fosse Nord
  
  395   Wed Mar 9 11:37:29 2022 Entered by Super Team from 134.158.195.141 on Wed Mar 9 11:37:15 2022Under ProcessLinacDiag | Linac Commissionning Demarrage machine (JNC/HG) Laser :

- 25 µJ

- Images sauvées : /data/shared/Commissioning_tools/Mesure/20220309/Laser
 Screenshot_from_2022-03-09_18-51-23.png 
  394   Tue Mar 8 17:20:07 2022 Entered by SC/MO from 134.158.195.142 on Tue Mar 8 17:19:54 2022FixedShift summaryLinac Commissionning Fin journée tests radioprotection Fin de la journée, STOP_Ampli sur
LI/OP/OPT.02-LAS.01-ASP.01

Alimentations éteintes
  
  393   Tue Mar 8 17:12:10 2022 Entered by Maher OMEICH from 134.158.91.212 on Tue Mar 8 17:11:52 2022 Shift summaryRF D1   Mise en arrêt modulateur et chillers   
  392   Tue Mar 8 15:18:08 2022 Entered by Super Team from 134.158.195.142 on Tue Mar 8 15:17:51 2022 Shift summaryLinac Commissionning   mesures radiopro fini, on laisse le modulateur
en standby
  
  391   Tue Mar 8 13:22:01 2022 Entered by SC/MO/CB from 134.158.195.142 on Tue Mar 8 13:21:48 2022FixedLinacLinac Commissionning Paramètres faisceau du jour Attenuateur canon = 0dB

Energie mesurée  =
50 MeV
  
  390   Tue Mar 8 10:29:34 2022 Entered by SC/MO/VS from 134.158.195.142 on Tue Mar 8 10:28:41 2022Under ProcessLinacLaser | Linac Commissionning Démarrage linac pour tests radioprotection Aujourd'hui : Tests radioprotection
(MO, SC)

Modulateur en standby pret à
  
  388   Mon Mar 7 18:07:46 2022 JNC/HG/CBUnder ProcessLinacLaser | Linac Commissionning le 7/03/2022 transport section sans RF Laser :

d'après
l'image de la camera ccd, le laser a
peu d'énergie. Il faudra le mesurer,
 Screenshot_from_2022-03-07_18-09-36.pngcharge_phase__at_07-03-2022__18-03-11.jpgplus0.5QP1.png 
  387   Mon Mar 7 16:30:36 2022 Entered by Super Team from 134.158.195.141 on Mon Mar 7 16:30:22 2022FixedProblemRF D1 | Linac Commissionning PSS redemarre Intervention Maher : PSS ok

 
  
  386   Mon Mar 7 13:40:56 2022 Entered by HM from 134.158.195.141 on Mon Mar 7 13:40:36 2022Not FixedProblemRF D1 | Linac Commissionning PSS en sdc arreté Le PSS ne tourne plus en SdC (roue crantée
figées) depuis le 5 mars 7:40

HM
  
  385   Thu Mar 3 19:12:31 2022 Entered by Super Team from 134.158.195.142 on Thu Mar 3 19:12:16 2022Under ProcessInfoLinac Commissionning Mesure energie fin linac  Mesures d'énergie en fin de
linac en fonction de la phase section.

- A 60° de phase
 scan_energiedeg_GUN_0.dB_LIL_0.25dB_LIL_phase_60deg__at_03-03-2022__18-11-17.jpgscan_energiedeg_GUN_0.dB_LIL_0.25dB_LIL_phase_110deg__at_03-03-2022__18-28-55.jpgcharge_phase__at_03-03-2022__19-26-42.jpg 