294
|
Tue Feb 1 17:35:23 2022 |
Entered by Super Team from 134.158.195.141 on Tue Feb 1 17:35:08 2022 | Not Fixed | Problem | Linac Commissionning |
|
Modulateur | |
Modulateur se met en standby toutes les qq minutes. Vivement l'intervention ! |
|
295
|
Tue Feb 1 18:46:27 2022 |
Entered by Super Team from 134.158.195.141 on Tue Feb 1 17:35:08 2022 | Not Fixed | Problem | Linac Commissionning |
|
RE: Modulateur | |
Modulateur tombé 18h45 ! 
on arrete du coup
| Entered by Super Team from 134.158.195.141 on Tue Feb 1 17:35:08 2022 wrote: |
|
Modulateur se met en standby toutes les qq minutes. Vivement l'intervention !
|
|
|
293
|
Tue Feb 1 11:45:05 2022 |
Entered by Super Team from 134.158.195.141 on Tue Feb 1 11:44:50 2022 | Not Fixed | Problem | Linac Commissionning |
|
PSS : Pas de clef ThomX | |
Impossible de démarrer sans cette clef. |
|
289
|
Tue Feb 1 10:15:44 2022 |
Entered by Super Team from 134.158.195.141 on Tue Feb 1 10:15:28 2022 | Under Process | Problem | Linac Commissionning |
|
PSS en alarme | |
Le PSS est en statut spécial avec écran clignottant avec statut LB9000 + message Alarme Anoxie.
Harold est prévenu et va intervenir |
|
290
|
Tue Feb 1 10:28:38 2022 |
Entered by Super Team from 134.158.195.141 on Tue Feb 1 10:15:28 2022 | Under Process | Problem | Linac Commissionning |
|
RE: PSS en alarme | |
A priori rien de grave, la langue du PSS était passé à l'anglais ce qui donnait des messages bizarres ... à vérifier que la langue est bien le français.
| Entered by Super Team from 134.158.195.141 on Tue Feb 1 10:15:28 2022 wrote: |
|
Le PSS est en statut spécial avec écran clignottant avec statut LB9000 + message Alarme Anoxie.
Harold est prévenu et va intervenir
|
|
|
1061
|
Tue Apr 29 11:03:14 2025 |
Entered by Super Team from 134.158.195.141 on Tue Apr 29 11:02:38 2025 | Under Process | Info | LI | TL |
|
Data taking for ML | |
Demarrage ACQ pour ML
Random : Phi_GUN, Phi_Section, ST1, ST2, Solenoid, QP1, QP2, QP3
Mesures : BPM1, BPM2, Charge, Laser, YagTL, Intensité Ecran
data --> /data/shared/commissioning_scripts/Data/data/data_linac_29_04_2025/
Section best phase : 207
Stop ThomX : 19:10 |
|
732
|
Tue Apr 11 15:38:34 2023 |
Entered by Super Team from 134.158.195.141 on Tue Apr 11 15:38:15 2023 | | Urgent | Diag |
|
probleme camera TL1 | |
camera TL1 senble de pas trigger correctement
Nicolas peux tu appeler la sdc stp
Plus besoin desole pb resolu |
|
731
|
Tue Apr 11 12:59:18 2023 |
Entered by Super Team from 134.158.195.141 on Tue Apr 11 12:59:03 2023 | | Linac | Linac Commissionning |
|
Faisceau Linac | |
13h : Mise en chauffe modulateur et refroidissement
14h34 Faisceau, HT = 1090V, HoPoslaser = 5.039, vertposlaser = 2.291, attenuation canon = 0.0 dB et attenuation section = 1.77 dB
Phaes charge max = 53 degres, Qmax = 74 pC
|
|
540
|
Thu Sep 8 13:20:04 2022 |
Entered by Super Team from 134.158.195.141 on Thu Sep 8 13:19:52 2022 | Under Process | Shift summary | Linac Commissionning |
|
Shift Linac + TL + Injection | |
Alignement laser :
position iris :
- X: 5.985 mm
- Y : 3.552 mm
Phase Qmax : 362°
Charge phase avec iris @3mm

|
|
1134
|
Thu Oct 9 08:37:45 2025 |
Entered by Super Team from 134.158.195.141 on Thu Oct 9 08:37:29 2025 | Under Process | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning |
|
Shift "du Jeudi" : VM/HG/KD/DN/RC | |
09h35 Warmup ThomX
09h40 Cycling all magnets
09h50 Start Chillers
09h48 HV is ON
The reflected wave from the RF gun seems too high. Trying to set it to 27°C, but the clarinet temperature rises to 30.4°C and does not change.
10h15 HV is OFF
10h27 Stop the Gun chiller.
10h50 Start the RF Gun chiller. The temperature is constantly rising.
11h25 Kevin reloaded the RF gun chiller. All is OK
17h00 Beam is in the ring. Receipt was loaded from 10/04/2025 17:32, RCDS, Good storage, Orbit adjustment to measure bunch length with MRSV. There is the light on the camera. Receipt saved 09102025 17:07
Emittance measurements during the shift as well, at QP1, QP2 QP3 with low charge 70pC(0.8 mm) normal charge 100pC(1.3mm) and (300pC)3mm : here we wanted to see the affect of asymetric laser beam as well.
QP4-Scan also but scan is strange (and long ... 1s expo to see something)
|
| Attachment 1: Screenshot_from_2025-10-09_16-57-23.png
|
 |
| Attachment 2: Screenshot_from_2025-10-09_16-50-25.png
|
 |
| Attachment 3: Screenshot_from_2025-10-09_16-50-12.png
|
 |
| Attachment 4: Screenshot_from_2025-10-09_17-17-57.png
|
 |
|
800
|
Thu Oct 5 08:39:05 2023 |
Entered by Super Team from 134.158.195.141 on Thu Oct 5 08:38:51 2023 | Reference Solution | Shift summary | Laser | Opt | Linac Commissionning | Ring Commissioning |
|
run du 5 octobre 2023 | |
8h30 : mise en chauffe de la machine
*** Comment aires ***
- test programme CPLD avec reste sur 2e fronts 41 MHz (oscilloscope nécessaire pour vérifier les signaux)
*** Programme ***
- Stocker de la puissance dans la cavité
- stocker le faisceau d'électron dans l'anneau (à 500.25 MHz est le mieux)
- chercher les rayons X en mode désynchronisé
- Chercher la synchro des rayons X avec l'anneau |
|
1132
|
Thu Oct 2 08:32:08 2025 |
Entered by Super Team from 134.158.195.141 on Thu Oct 2 08:31:43 2025 | Under Process | Shift summary | LI |
|
| |
08h30 ThomX warm-up
08h37 Cycling all magnets
10h20 HV is ON
10h30 Beam is in the ring |
|
170
|
Thu Nov 18 11:50:09 2021 |
Entered by Super Team from 134.158.195.141 on Thu Nov 18 11:49:51 2021 | Under Process | Linac | Laser | Linac Commissionning |
|
Charge avec ou sans l'Iris sur le laser |
|
Nous avons testé de retirer l'iris pour mesurer la charge.
la charge max passe de 100 pC max à 150 pC. Le bruit semble aussi plus important (plus de dispersion sur la charge).
|
| Attachment 1: Laser_noIris.png
|
 |
| Attachment 2: charge_pahse.jpg
|
 |
| Attachment 3: charge_pahse_noiris.jpg
|
 |
|
960
|
Thu Nov 14 08:33:34 2024 |
Entered by Super Team from 134.158.195.141 on Thu Nov 14 08:33:03 2024 | Under Process | Info | Linac Commissionning |
|
| |
08h30 Start ThomX
10h00 HV is 'ON'
11h03 RF Gun phase 230 dg. Att. 0.0 dB, Laser Att. 360.00, Charge -145 pC, Section Att. 2.59 dB, Phase 207 dg.
Linac steerers: H [2.69 -4.45]; V [-2.14 2.32],
11h20 Ring injection, Orbit studies
11h25 RF gun breakdowns, HV is 'OFF'
11h28 Restart HV, Problems with the Shutter,
11h36 Fixed
Frequent interlocks on V1
Set RF Gun temperature to 31.7 dg. (Clarinette temperature 31.5 -31.6)
11h40 Ring RF is 'ON'
15h43 Freaq. RF=500.1003
16h20 RF GUN Phase 229 dg., Charge -88 pC, Sect. Phase 213 dg. TL/BPM2 X=-2, Att. 2.703
17h00 Trying BBA
QP02 Ri-C2 BPM.01-Lib.04, 0.4 mm on X
QP02 Ri-C1 BPM.01-Lib.03, 1.8 mm on X
QP03 Ri-C1 BPM.02-Lib.03, 0.4 mm on X
QP03 Ri-C2 BPM.02-Lib.04, 0.2 mm on X
17h50 Stop ThomX |
| Attachment 1: TL_SST3Screenshot_from_2024-11-14_16-10-34.png
|
 |
| Attachment 2: 2024-11-14_16_10_01_tl_dg_sst_03-ccd_01_RAW_16bits.tiff
|
| Attachment 3: 2024-11-14_16_10_01_tl_dg_sst_03-ccd_01_RAW.png
|
 |
| Attachment 4: 2024-11-14_16_10_01_tl_dg_sst_03-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
|
 |
| Attachment 5: TL_SST2Screenshot_from_2024-11-14_16-06-27.png
|
 |
| Attachment 6: 2024-11-14_16_05_27_tl_dg_sst_02-ccd_01_RAW.png
|
 |
| Attachment 7: 2024-11-14_16_05_27_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
|
 |
| Attachment 8: 2024-11-14_16_05_27_tl_dg_sst_02-ccd_01_RAW_16bits.tiff
|
| Attachment 9: Screenshot_from_2024-11-14_15-35-17.png
|
 |
| Attachment 10: Screenshot_from_2024-11-14_15-31-58.png
|
 |
| Attachment 11: Screenshot_from_2024-11-14_15-30-14.png
|
 |
| Attachment 12: Screenshot_from_2024-11-14_15-29-27.png
|
 |
| Attachment 13: Screenshot_from_2024-11-14_15-29-15.png
|
 |
| Attachment 14: Screenshot_from_2024-11-14_15-29-02.png
|
 |
| Attachment 15: Screenshot_from_2024-11-14_12-33-27.png
|
 |
|
Draft
|
Thu Nov 6 08:30:52 2025 |
Entered by Super Team from 134.158.195.141 on Thu Nov 6 08:30:37 2025 | Under Process | Urgent | TL | LE |
|
| |
08h30 Warm-up ThomX: Modulator, Laser, Fridge
08h36 Chillers were started, cycling all magnets
09h33 HV is ON
09h34 HV set to 1215 V RF Gun phase is 188 dg.
11h09 Help needed! Something is wrong with the TL bends.
11h44 Something is wrong with the section attenuator. Reducing the attenuation results in a decrease in the section's output power.
12h15 OK, finally we got it. RF Gun phase 182 dg. Sect. phase 298 dg. Sect. Att. 0.59 dB, 50 MeV, Li/HFI/ATT.01-MOT.01 ==> 311 steps Sect. Output -0.123 V
Sect. Output -0.123 V Mot. pos. 1699 steps but Sect phase = 211 dg. Calc/Li/HFI/ATT.01-MOT.01 is not working properly.
12h31 Beam is in the ring W/O RF
12h35 RF 100 kV
BBA Hor.
BPM Ind. Offset
[1 1] ==>-0.129
[1 2] ==>0.017
[1 3] ==>-0.722
[1 4] ==>0.425
[1 5] ==>-0.022
[1 6] ==>-0.139
[1 7] ==>0.091
[1 8] ==>0.272
[1 9] ==>0.375
[1 10] ==>-0.022
[1 11] ==> -0.272
[1 12] ==> -0.400 |
| Attachment 1: SectOutput20251030.png
|
 |
| Attachment 2: SectOutput20251106.png
|
 |
|
813
|
Thu Nov 2 16:52:14 2023 |
Entered by Super Team from 134.158.195.141 on Thu Nov 2 16:51:56 2023 | | Info | LI |
|
Restauration Base de donnée TANGO | |
Restauration de la base de donnée TANGO faite aujourd'hui.
Tests des DSs prévus demain matin. Redémarrage des DSs nécessaires avant via astor.
|
|
458
|
Thu May 12 15:30:07 2022 |
Entered by Super Team from 134.158.195.141 on Thu May 12 15:29:50 2022 | Under Process | Linac | Laser |
|
mesure impultion laser sur table optique | |
un filtre 5MHz a été installé en sortie de la photodiode de la table laser dans la casemate
je n'ai pas pu vérifier le bon fonctionnement du systeme, je n'arrive pas à lire les redpitaya
|
|
413
|
Thu Mar 24 09:26:22 2022 |
Entered by Super Team from 134.158.195.141 on Thu Mar 24 09:25:25 2022 | Under Process | Linac | Diag |
|
ThomX -commitionning diag | |
Demarrage modulateur 9H
demarrage chiller 9h15 |
|
396
|
Thu Mar 10 09:15:36 2022 |
Entered by Super Team from 134.158.195.141 on Thu Mar 10 09:15:18 2022 | Under Process | Urgent | Infra | Linac Commissionning |
|
intervention M Langlet en sous sol | |
9h : M Langlet a besoin de façon urgente d'acceder au sous-sol.
Deverouillage de la fosse Nord
HM |
|
382
|
Thu Mar 3 08:59:44 2022 |
Entered by Super Team from 134.158.195.141 on Thu Mar 3 08:57:42 2022 | | Linac | RF D1 |
|
| |
mise en route chillers et frigo, modulateur sur stby ( pas de coupure pendant la nuit ) |