HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 41 of 63  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Status Type Category Important Subjectdown Icon Text Attachments
  703   Fri Mar 3 19:19:18 2023 KD, SC, VCNot FixedProblemLI | TL | Ring | Diag | SY | Electronique | Linac Commissionning | Ring Commissioning Jitter énergie icon4.gif Aujourd'hui lors du shift un phénomène
étrange a été observé
:
  
  235   Wed Jan 5 17:35:11 2022 Entered by Super Team from 134.158.195.141 on Wed Jan 5 17:34:46 2022Reference SolutionInfoLaser | Linac Commissionning Iris Motorisé [KD et HG]

-  Mise en place de l'iris
motorisé à peu près
  
  234   Wed Jan 5 15:25:30 2022 Entered by Super Team from 134.158.195.141 on Wed Jan 5 15:25:13 2022Under ProcessProblemRF D1 | Linac Commissionning Interventon Modulateur  Soucis modulateur qui ne passe pas en HV.

--> [MO, JN]  : Intervention
sur le modulateur.
  
  877   Fri Jun 7 09:24:59 2024 Entered by Super Team from 134.158.195.141 on Fri Jun 7 09:24:42 2024New SolutionShift summaryInfra | Linac Commissionning Interventions du matin 9h Intervention sur les filtres de la CTA
(Dalkia, Stéphane)

9h Intervention dans les sous-sols
  
  641   Tue Dec 6 09:54:56 2022 ND, VCUnder ProcessInfoRing Intervention synchro 9:55 Intervention synchro en cours pour
regler l'ajustement de la phase et la
puissandce de la cavite RF.
  
  816   Tue Nov 14 11:09:41 2023 Entered by Nicolas Delerue from 157.136.192.228 on Tue Nov 14 11:09:26 2023 InfoDiag Intervention WAC 10:50 Appel salle de contrôle. Pas
de réponse.

Connexion à distance pour
  
  78   Thu Sep 30 15:59:32 2021 Entered by Super Team from 134.158.195.144 on Thu Sep 30 15:59:16 2021FixedShift summaryLinac Commissionning Interlock vide et modulateur Interlock vide sur pompe très fréquent,
modification en local pour améliorer
la situation
  
  138   Thu Oct 28 17:07:46 2021 Entered by sophie chance from 134.158.195.141 on Thu Oct 28 17:07:32 2021Under ProcessLinacLinac Commissionning Interlock sur PP1 en augmentant l'intensité de COL02 à 10 Hz Malgré attenuation 3 dB, à
10 Hz, interlock régulier en montant
la valeur d'Ampérage de la bobine
  
  91   Tue Oct 5 10:55:40 2021 Entered by Hayg Guler from 134.158.195.141 on Tue Oct 5 10:55:25 2021Not FixedProblemAimants | Vide | Linac Commissionning Interlock RF + Solenoides  
Gradient accélérateur
: 80 MV/m (atténuateur Canon à
1.5 dB)
Solénoides :

COL1(CC)
 Screenshot_from_2021-10-05_10-55-29.pngScreenshot_from_2021-10-05_13-25-45.pngScreenshot_from_2021-10-05_16-32-19.png 
  1083   Thu Jun 5 08:26:31 2025 VM, IC, DN, RCUnder ProcessShift summaryRing Commissioning Interaction region studies Goals: Optimization
of the IP. Verification of the llaser waist
 6x 
  976   Fri Dec 6 11:11:31 2024 VC MJFixedShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Installation du PM dans la X-hucth Le PM est installe dans la X-hutch (PM
+ gene + ocsillo), on a  test que ca
fonctionne -
  
  1111   Tue Sep 2 07:54:11 2025 MJ, KD,VM,IC, RC, DNUnder ProcessShift summaryLinac Commissionning | Ring Commissioning Injector at 70 MeV 7h50: mise en chauffe remote (modulateur,
frigo/chiller, laser, cyclage)

9h start of the beam
  
  1094   Thu Jun 26 08:55:15 2025 IC, DN, RC, HG, MEUnder ProcessShift summaryRing Commissioning Improve ring for X-rays  Goal: Vertical orbit and angle
at the IP with I3 and I4 X-ray signals

8h55 Switch ON the modulator and
 7x 
  369   Wed Feb 23 12:45:44 2022 Entered by Christelle Bruni from 134.158.195.142 on Wed Feb 23 12:45:28 2022 ProblemCC Impossible de redémarrer srv3 , intervention du contr^ole commande necessaire Laser passé en gate_in false en
attendant

Olivier est venu nous dépanner,
  
  106   Mon Oct 11 13:40:31 2021 Entered by SC from 134.158.195.142 on Mon Oct 11 13:40:14 2021Under ProcessLinacLinac Commissionning Image vide sur IHM sans laser sans RF Capture du vide sur l'IHM RF shutter
photocathode fermé sur MPS et pas
d'autorisation de RF
 vide_sans_laser_sans_rf.png 
  121   Tue Oct 26 15:19:17 2021 Entered by Moutardier Alexandre from 134.158.195.144 on Tue Oct 26 15:18:59 2021 InfoRF D1 Image PIC PBC photodiode a l'oscilloscope en salle de controle Attenuateur RF canon : 0.25 dB

Orange : Photodiode
Vert : PBC
 image_PIC_PBC_photodiode.png 
  711   Mon Mar 13 12:18:02 2023 MJNot FixedUrgentLinac Commissionning IHM SST HS - URGENT IHM sst HS en debut de shift cf image :
toutes les cases show camera sont blanches
yag 2 3 4 !! RIEN ne marche
 IHM_HS_2023-03-13_12-42-01.pngScreenshot_from_2023-03-13_12-55-32.png 
  652   Mon Dec 12 15:49:21 2022 Entered by Marie Jacquet from 134.158.89.45 on Mon Dec 12 15:49:05 2022Not FixedShift summaryLinac Commissionning IHM BPM, "mean" HS ? Les "mean" ne semblent plus fonctionner
dans l'IHM bpm. Les cases "mean"
etaient tout le temps a zero ce matin pour
  
  162   Mon Nov 15 09:20:24 2021 Entered by Maher OMEICH from 134.158.91.212 on Mon Nov 15 09:20:04 2021Not FixedProblemLinac Commissionning IHM  Bonjour,

la consigne dans l'IHM RF ne
fonctionne pas
  
  375   Mon Feb 28 17:13:12 2022 Entered by Super Team from 134.158.195.141 on Mon Feb 28 17:12:48 2022 InfoLinac Commissionning IHM apres un balayage de l ecran nous avons
trouve l IHM

desoler pour l alerte
  
ELOG V3.1.4-395e101