Entry   Entered by Super Team from 134.158.195.142 on Thu Mar 3 19:12:16 2022; Mesure energie fin linac  scan_energiedeg_GUN_0.dB_LIL_0.25dB_LIL_phase_60deg__at_03-03-2022__18-11-17.jpgscan_energiedeg_GUN_0.dB_LIL_0.25dB_LIL_phase_110deg__at_03-03-2022__18-28-55.jpgcharge_phase__at_03-03-2022__19-26-42.jpg

Mesures d'énergie en fin de linac en fonction de la phase section.

- A 60° de phase

A 110° de Phase : 

18h40 ; le laser s'est délocké. Ensuite difficile de le récupérer. 

Nouvelle phase : 238

en plus la charge est bien tombée ... 

Bon on arrete, on ne comprend pas cette chutte de charge qui est venue apres la perte de la phase.

 

Entry   CB/HG/JNC; vérification cablage steerer 

entre le DS et l'alim, OK

il faut vérifier entre l'alim et le steerer

Il y avait des différences, on a tout remis à plat pour la convention + vers le haut, et + vers le mur

Atention, il faudra vérifier les autres steeres de la TL qui doivent ^etre également inversés en vertical A FAIRE

 

Entry   CB/JNC/MO; shift du 3 mars phase_trend_osc_2022-03-03_11-33-17.pngcharge_phase__at_03-03-2022__11-45-12.jpgScreenshot_from_2022-03-03_12-44-13.png

NB : scandinova est présent en observateur

la mesure de la phase ne fonctionne pas, problème de connectique a priori, Viktor regarde A FAIRE il faut changer le cable, fait, ca marche

Image laser sauvée dans laser à 11h00, position H 931, V 589 pixels (conversion .32 um/pixels) --> Ok par rapport à hier

jupyter lancé avec les commandes de l'ID31 de l'elog CC, ca marche

Phase max charge : 238 deg, on reprend légèrement le miroir M4 (départ 390, 5370mm), fin 390, 5373

Phase moins stable qu'hier, cf. trend ci dessous non sensibilité changée 1°3GHz/mV

Charge phase (Att=400mm)

Laser s'est délocké pendant le charge phase, on recommence,

On a perdu le signal photodiode sur l'ihm Rf, Il faut redémarrer les redpitaya A FAIRE fiabiliser la visualisation des signaux

set de paramètres par défaut (trig ext 6, level 0.1, decimination 0) --> fonctionne à nouveau

Positions du laser journée d'hier:

Un battement régulier de 1h30 de période plus sensible en y (vert).

Inversion des cablages pour etre dans la convention

nouvelles config des steerers : LI/STR2H=+0A, LI/STR2V=0A, TL/STR1V=+0A, TL/STRH=+0A, image sauvée à 13h44, le faisceau est en bas de l'écran sans quad. On arrive aps centré dans le premier quad, le BP sortie section indique qu'on est 5 mm en horizontal vers le mur, et -4mm en vertical soit vers le bas

Redémarrage des WaveCatchers , DS et des serveurs associés. La mesure de charge fonctionne.

 

Entry   Entered by Super Team from 134.158.195.141 on Thu Mar 3 08:57:42 2022;  

mise en route chillers et frigo, modulateur sur stby ( pas de coupure pendant la nuit )

Entry   CB/JNC/HG; shift du 2 mars 2022 6x

 

0dB voie canon, problème de régulation réglée

imagelaser enregistrée à 12h06, dimension rms 0.3/0.44 mm, position 969, 624 pixels, stabilité laser 48;2 et 29.7 um (de l'ordre de la dizaine de pixels) sur 200 images

test alignement laser avec Alignement/Alignement_laser dans jupyter

pente en nm/degré, Prévoir calibration miroir/pas en mm A FAIRE

valeur de départ miroir M4 (5360/410), marqué mm, mais est ce des mm ?? A verifier, on essaye de mettre du backlash (0.5 mm)

image laser enregistrée à 12h50 après optimisation 5370/390 sur m4, position 911/573 pixels --> nouvelle position de référence, plot final sur mesure BPM

mesure énergie à Qmax --> la phase a bougé, (cf. trend), 2.23 MeV

A Emax, coil 2 à 213A, 4.6 MeV d'énergie cinétique, pc =5.1 MeV

Pause déjeuner 13h25, laser mis sur gate in false

16H30 stabilité laser :

E = [4.51 4.46 4.48 4.65 4.52 4.6 4.02 4.08 3.68 3.17 2.06];
phase = [100 110 120 130 140 150 160 165 170 180 190];

 

Comparaison avec les simulations 75 MV/m, laser 0.3mm rms, 2 ps de durée, charge=0.03pC +Qscottcky=5e-4, zstop=0,78m

 

Entry   CB/VC; suivi mesure de phase 

taurustrend test/cc/osc.01/measurement1

A mettre dans l'archivage

Entry   Entered by Maher OMEICH from 134.158.91.212 on Wed Mar 2 09:12:22 2022;  

Mise en route chillers, modulateur resté sur stby depuis hier ( pas de coupure )

Entry   CB/JNC; charge phase Screenshot_from_2022-03-01_18-05-55.png

Image laser sauvée à 11h50, dimension rms 80 pixel en vertical et 94 en horizontal, position du laser : 934.34 en horizontal et 575.48 pixels

2bD sur voie canon, HT 1090

Impossible de lancer jupyter-lab depuis un terminal --> voir note sur elog CC

la commande jupyter-notebooks fonctionne

On a trouvé le script charge phase dans dans commissioning script/linac/chare/Charge_Phase

Impossible de lancer le script, la charge n'est aps clairement lisible sur l'ihm charge, on ne connait donc pas la charge.

phase de max charge @293 degrés, on se décale de 50 degrés, coil2 à 180A, image enegistrée sur LISST1 à 12h13 

Energie 3.7 MeV

On se remet à charge max, et on vérifie l'alignement soléno

 

point de départ TX 0.4mm, tz 2.5mm, rx 5.5mrad, rz -4

on se rapproche, le bary centre à 0A semble bouger, on vérifie la position du laser : posh 935.1, et posv 561, il a donc bougé en vertical, ce qui correspond à nos observations sur la faiscaeu

on s'arrete à TX 0.45mm, tz 2.6mm, rx 5.4mrad, rz -4.3 mrad

Charge phase effacé par Hayg ;))

position laser mesurée à 15h29 : 920.28, et 583

perte d'énergie Rf pour les m^emes consignes ....

- 16h25 : Charge max @256 ... on shift en phase

- 17h42 : canon désadapté, la température pour adapter ne semble plus etre à 32.75°C.

19h40 : energie sortie de canon à 2dB 3.6 MeV. le canon semble à nouveau fonctionnel. Il faut vérifier le fonctionnement du Chiller car la consigne est à 26° et cela ne semble pas refroidir la boucle qui reste à 31.7 en sortie chiller. 

20h30 : 0dB sur le canon : 2.8 MeV ...

 

 

Entry   Entered by Super Team from 134.158.195.141 on Tue Mar 1 10:34:10 2022; panneau IHM ne se lance pas [resolu] 

resolu

 

Voici l'erreur,

 

[18:20:30] operateur.thomx@client1:/tmp_mnt/data/operateur.thomx > IHM
MainThread     INFO     2022-03-01 10:30:19,883 TaurusRootLogger: Using "PyQt4" for Qt
MainThread     INFO     2022-03-01 10:30:19,950 taurus.qt.qtgui.icon.icon: Setting Tango icon theme (from /usr/local/lib/python2.7/dist-packages/taurus/qt/qtgui/icon/)
('------------ ', '/data/shared/Interfaces/panneaux/')
('HOME_IHM = ', '/data/shared/Interfaces/panneaux/')
('------------ ', '/data/shared/Interfaces/panneaux/')
Traceback (most recent call last):
  File "/data/shared/Interfaces/panneaux//PlateformeIHMThomX/PlateformeIHM.py", line 45, in <module>
    from IHM_charge import ChargeDevices
  File "/data/shared/Interfaces/panneaux//Diags/BPM/IHM_charge.py", line 14
SyntaxError: Non-ASCII character '\xc3' in file /data/shared/Interfaces/panneaux//Diags/BPM/IHM_charge.py on line 14, but no encoding declared; see http://python.org/dev/peps/pep-0263/ for details
 

Entry   Entered by Super Team from 134.158.195.141 on Tue Mar 1 09:08:40 2022;  

démarrage chillers, modulateur ( en local )

pas de IHM modulateur meme pb que hier soir

Entry   Entered by Super Team from 134.158.195.141 on Mon Feb 28 17:12:48 2022; IHM 

apres un balayage de l ecran nous avons trouve l IHM

desoler pour l alerte

cordialement

Entry   Entered by Super Team from 134.158.195.141 on Mon Feb 28 16:31:53 2022; ihm 

bonjour

on desires demarrer la machine mais les IHMs ne demarre pas apres double clics plusieurs infructueux

cordialement

Entry   Entered by CB/SC/JNC from 134.158.195.141 on Thu Feb 24 15:08:35 2022; Mesure energie fonction de la phase charge_phase__at_24-02-2022__15-35-03.jpg

Passage à 0 dB, Emax = 4.61 MeV B3 = 220 A

Attenuateur laser au max Att = 411 mm (Pleine energie laser = 27 uJ)

Scan charge phase B3 = 0A

Mesures energie à différentes phases à 0dB avec focalisation

Tableau :

275 degres, B3 = 0, E = 2.8 MeV (charge max)

225 degres, B3 = 220 A, E = 4.7 MeV

235 degres, B3 = 210 A, E = 4.43 MeV

245 degres, B3 = 190 A, E = 4.11 MeV

255 degres, B3 = 170 A, E = 3.8 MeV

265 degres, B3 = 110 A, E = 3.18 MeV

215 degres, B3 = 210 A, E = 4.51 MeV

205 degres, B3 = 210 A, E = 4.52 MeV

195 degres, B3 = 210 A, E = 4.49 MeV

Entry   Entered by JNC/SC/CB from 134.158.195.142 on Thu Feb 24 13:36:53 2022; Faisceau message_alerte_laser.png

Energie laser = 27 uJ sur la cathode

IHM Camera laser s'est gelé, impossible de le rouvrir et de voir l'image laser.

On essaie de l'ouvrir avec jive (LI/OP/LAS.02), ne marche pas (cf pièce jointe)

Charge max à phase = 300 degres, Qmax autour de 75 pC.

 

Entry   Entered by Super Team from 134.158.195.141 on Thu Feb 24 10:04:39 2022; intervention Scandinova 

l'intervention Scandinova continue

Entry   Entered by Maher OMEICH from 134.158.91.212 on Wed Feb 23 15:28:31 2022; intervention 

Bonjour à tous,

Je voudrais faire des tests sur le modulateur et les chillers et frigo le vendredi 25/02 dans le D1

Maher

Entry   Entered by Christelle Bruni from 134.158.195.142 on Wed Feb 23 12:45:28 2022; Impossible de redémarrer srv3 , intervention du contr^ole commande necessaire 

Laser passé en gate_in false en attendant

Olivier est venu nous dépanner, problème résolu

Entry   CB/JNC; run du 23 février 2022 scanXY_2dB_chargemax_0_100A_v1_2_4_5_6_7_9_10_11_12.png2022-02-23_21_10_16_li_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True_3.png

Image du laser sauvée, le temps d'exposition a du etre augmenté pour pouvoir le visualiser, probème de retard ?

maintenant que le repérage des moteur est fait, on repart des valeurs données par la mécanique : translation Y +0.3mm, translation Y 0mm, rotation Z 0mrad, rotation X 0.9 mrad

Le moteur de l'écarn de la station diag LI ne répond pas, on redémarre les serveurs, puis les icepap, et on redémarre les serveurs, mais ca ne marche toujours pas.

Impossible de redémarrer srv3 , intervention du contr^ole commande necessaire

On redémarre à 15h19 suite à l'intervention d'Olivier

charge phase à 15h21 (100 pC E max)

B3 220 A, mesure énergie 5 MeV

On a "jouer" sur les moteurs du solénoides à la phase de max de charge ( à 2dB), le noir est le meilleur choix actuellement, mais ce n'est pas encore fini :

TX 0.4mm, tz 2.5mm, rx 5.5mrad, rz -4 (nb : les valeurs semblent un peu incohérentes en amplitude)

Le faisceau focalisé avec (att laser =180mm) est tout petit sur la station LI/SST1 ;)

Il faut poursuivre demain à la phase d'energy max, le faisceau est à présent mesureable sur les écrans, on pourra ainsi enchainé sur les comparaisons modèle/expérience sur la t^ete de machine et le reste

NB : scandinova intervient à 9h30, nous prendrons la main à 10h

Modulateur mis en standby à 21h25, le laisser pour tester les interlocks

laser mis sur gate, et stop ampli

 

 

Entry   CB/JNC/MO; repérage sens moteur solénoides 

Mise en place par Jean Noel, d'un système de repérage visuel des déplacements.

Xtranslation correspond à une translation horizontale, négatif vers le mur et positif vers l'anneau

Ztranslation correspond à une translation verticale, négatif ca descend, et positif ca monte

Rotation X inclinaison négative vers le bas et positive vers le haut

Rotation Z inclinaison positive vers l'anneau et négative vers le mur

icon8.gif   CB/JNC/SC/MO; CONTROLE A DISTANCE STRICTEMENT INTERDIT 

Merci d'avoir d'obligeance d'appeler la salle de contrôle pour toute action, même si ca vous parait anodin

    icon8.gif   CB/JNC/SC/MO; RE: CONTROLE A DISTANCE STRICTEMENT INTERDIT 

Si en appelant personne ne répond, à-t-on le droit de ce connecter a distance ?

Doit-on le mettre dans le e-log ?
La réponse me semble evidament OUI, mais ou ? 
Est ce qu'il ne serait pas utile de créer une catégorie a part pour evité de polluer les autres avec des SSH ?

PS : je viens de me connecter en SSH (Fini !)

CB/JNC/SC/MO wrote:

Merci d'avoir d'obligeance d'appeler la salle de contrôle pour toute action, même si ca vous parait anodin

 