717
|
Fri Mar 17 08:55:42 2023 |
IC, VM, VK, ND | | Shift summary | Ring Commissioning |
|
RIng commissioning | | 8:50 Mise en chauffe
10h Starting the beam
Tuning of the TL |
10x |
|
718
|
Thu Mar 23 15:15:56 2023 |
SC | Under Process | Problem | CC |
|
Tests CC apres re-démarrage | | 15h16 redémarrage de client 3
Problème avec le commutateur
de la baie en salle de controle (celui qui |
|
|
719
|
Fri Mar 24 08:52:49 2023 |
SC/JNC/VC | Under Process | Problem | CC |
|
Redémarrage ThomX | | 8h53 Serveur DNS et DHCP non redémarré,
ping ne fonctionne pas, en attente d'une
solution |
    |
|
720
|
Mon Mar 27 13:55:41 2023 |
Entered by Super Team from 134.158.195.141 on Mon Mar 27 13:55:24 2023 | Under Process | Info | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Etat ThomX | | Cavité FP a terminé son intervention
Mise sous vide possible cette après-midi
14h Intervention IHM cavité |
|
|
721
|
Wed Mar 29 13:35:25 2023 |
MJ | | Problem | Linac Commissionning |
|
ICT1 ?? | | demarrage vers 13h
Pb de vide depuis une demi-heure
(MV-1 rouge sur le pss) Bruno est venu + |
 |
|
722
|
Thu Mar 30 09:34:24 2023 |
Entered by Marie Jacquet from 134.158.89.45 on Thu Mar 30 09:34:11 2023 | | Shift summary | Linac Commissionning |
|
Nouvelle position laser/cathode (du 29 mars) | | Nouvelle position laser/cathode
du 29 mars : x=4.91mm / y=2.40mm |
|
|
723
|
Thu Mar 30 13:35:13 2023 |
Entered by SC from 134.158.195.141 on Thu Mar 30 13:34:57 2023 | Under Process | Linac | Linac Commissionning |
|
Faisceau Linac | | 14h38 : Démarrage faisceau linac
Modulateur 1090V, Position laser
horizontale 4.910 mm et verticale 2.40 mm |
|
|
724
|
Thu Mar 30 17:20:43 2023 |
Entered by Marie Jacquet from 134.158.89.45 on Thu Mar 30 17:20:29 2023 | | Shift summary | Linac Commissionning |
|
| | Shift ce matin
** YagTL1 vs soleno avec alignement
a la Kev ou a la Hayg (mais chaque fois aligne |
|
|
725
|
Fri Mar 31 10:11:40 2023 |
Entered by Super Team from 134.158.195.141 on Fri Mar 31 10:11:25 2023 | | Linac | Linac Commissionning |
|
Faisceau Linac | | 10h12 Démarrage modulateur et refroidissement
Lancement de l'archivage
11h05 Fermeture casemate |
|
|
726
|
Fri Mar 31 10:44:31 2023 |
Entered by Super Team from 134.158.195.141 on Fri Mar 31 10:11:25 2023 | | Linac | Linac Commissionning |
|
Faisceau Linac | | Qui me pique internet ?
Et m'éfface le elog
? |
|
|
727
|
Tue Apr 4 12:13:18 2023 |
MJ KD | Under Process | Shift summary | LI | TL | LE | Linac Commissionning |
|
shift du 04 avril 2023 | | 12h10: Mise en chauffe modulateur, laser
et chiller + PA
14h30: mesure phase relative sortie |
|
|
Draft
|
Tue Apr 4 15:21:51 2023 |
| | | |
|
, entered from 134.158.195.141 | | <p>12h10: Mise en chauffe modulateur, laser
et chiller + PA</p>
|
|
|
729
|
Thu Apr 6 12:57:29 2023 |
Entered by Super Team from 134.158.195.141 on Thu Apr 6 12:57:15 2023 | | Linac | Linac Commissionning |
|
Faisceau Linac | | 12h57 Mise en chauffe modulateur et refroiddissement
canon et section
Vide dans l'anneau de l'ordre |
|
|
730
|
Fri Apr 7 13:48:55 2023 |
Entered by Super Team from 134.158.195.141 on Fri Apr 7 13:42:08 2023 | | Linac | Linac Commissionning |
|
Faisceau Linac | | Programme :
- Mesure Energie apres section
en fonction de la phase avec steerer sur |
|
|
731
|
Tue Apr 11 12:59:18 2023 |
Entered by Super Team from 134.158.195.141 on Tue Apr 11 12:59:03 2023 | | Linac | Linac Commissionning |
|
Faisceau Linac | | 13h : Mise en chauffe modulateur et refroidissement
14h34 Faisceau, HT = 1090V, HoPoslaser
= 5.039, vertposlaser = 2.291, attenuation |
|
|
732
|
Tue Apr 11 15:38:34 2023 |
Entered by Super Team from 134.158.195.141 on Tue Apr 11 15:38:15 2023 | | Urgent | Diag |
|
probleme camera TL1 | | camera TL1 senble de pas trigger correctement
Nicolas peux tu appeler
la sdc stp |
|
|
733
|
Tue Apr 11 22:34:19 2023 |
Marie Vincent Noureddine Jean-Noel | | Shift summary | Linac Commissionning |
|
| | Debut vers 16h
Passage section avec Isol=200,
1.7 db, ph=110 |
|
|
734
|
Thu Apr 13 08:16:42 2023 |
KD, ND, Lisa | Under Process | Shift summary | LI | TL | LE | Diag |
|
shift du 13 avril 2023 | | 8h20 : mise en chauffe chiller/Frigo, Modulateur,
Laser et PA.
9:30 Verification health check |
11x |
|
735
|
Wed Apr 19 12:41:18 2023 |
CB/HG | | Problem | Linac Commissionning |
|
urgent : Pb IHM phase | | Bonjour,
nous ne pouvons pas piloter la
phase depuis l'IHM, elle est en boucle |
|
|
736
|
Wed Apr 19 14:47:58 2023 |
KD/CB | | Shift summary | Linac Commissionning |
|
run du 19 avril 2023 | | NB de Christelle
: pendant toute la durée de la manipe,
l'atténuateur section a été |
 |