HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 35 of 62  Not logged in ThomX    logo
icon1.gif   Entered by Super Team from 134.158.195.141 on Wed Dec 3 11:08:54 2025; Demarrage ThomX  
icon4.gif   Entered by Hayg Guler from 134.158.195.141 on Tue Nov 16 16:00:26 2021; synchro laser et dephasage 
Entry   Entered by Super Team from 134.158.195.142 on Thu Nov 18 11:39:37 2021; puissance laser 
Entry   AM, VI, VK, IC, VC, ND; Shift du 30/09/2022 16x
Entry   VC/KD/SC; Faisceau linac 
Entry   KD; shift du 19 octobre 2022 LI_SST_NOK_2022-10-19_17-04-39.pngLI_SST_OK_2022-10-19_17-02-16.png
Entry   ND, IC, VK, VM; Shift àf 3/11/2022 9x
Entry   Entered by Nicolas Delerue from 80.119.21.73 on Thu Dec 1 01:14:20 2022; Beam time / Thursday 1st December 11x
Entry   IC, VM, ND, VK; Prise de donnee 10/3/2023 7x
Entry   ND, Enzo Crou, Noé Idesheim, Jean-Nicolas Quenot; Prise de donnee 16/3/2023 17x
Entry   ND,DN,SC,NE, EM; Quart collectif 25/4 
Entry   ND, LS; Prise de donnee 26/4/2023 2023-04-27_14_41_46_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png2023-04-27_14_43_34_el_dg_sst_01-ccd_01_RAW.png
Entry   ND, LS, IC, VM, VK; Prise de donnee 27/4/2023 10x
Entry   KD; shift du 03 mai 2023 8x
Entry   SC, ND; Effet changement de phase RF Canon sur TL/BPM.02 Screenshot_from_2023-06-13_13-50-23.png
    Reply   SC, ND; RE: Effet changement de phase RF Canon sur TL/BPM.02 
Entry   ND, RC; Effet eclairage sur detecteurs RX Screenshot_from_2023-06-13_15-27-06.png
Entry   ND, LS; ThomX operations 26/6 
Entry   LS, ND; shift du 29 juin 2023 
Entry   ND, Anna K, Elene K, Marie L; Prise de donneees 5/02 mrsv_nobeam.pngmrsv_beam.png