1156
|
Mon Nov 24 13:22:59 2025 |
ND + JM + HG | Under Process | Shift summary | LI |
|
Prise de données 24/11 | |
9:15 Mise en chauffe
9h30 Arrivée du SPR: testsSSI ce matin => pas de faisceau avant midi => machine off
12h30 Mise en chauffe,cyclage aimants
13h10 Demarrage
Claquage a 1200V.
13h30 Faisceau
ND : ajustement de cameras
Soleno Scan
Mesure emittance @soleno
|
|
1152
|
Tue Nov 18 11:11:33 2025 |
HG, JM, ND | Under Process | Shift summary | LI |
|
Prise de données 18/11 | |
9h Intervention laser
Intervention pour realignement el/dg/sst.01
11h Fin interventions demarrage machine
12h Quad scans
14h Measures TL
16h Stop ThomX
|
|
920
|
Fri Sep 20 08:56:23 2024 |
SC, ND | Under Process | Shift summary | Diag |
|
Prise de données 20/09 | |
8h50 Mise en chauffe, cyclage aimants
Healthcheck:
- defaut sur le vide (resolu)
- Pb redpitaya (resolu)
9h11 Healthcheck OK
9h30: Beam on
11h53 Changement d'operateur: Slava, Hayg et Viktor
14:30 Acces pour recuperer le wattmetre dans la casemate.
autour de 16h : perte de base de donnée tango
16h19 : deuxième perte base de donnée tango (cf screenshot)
2 personnes connectees a distance sur Client1
17h28 problème avec le shutter laser (en orange), plus de faisceau
Etude du declenchement de TL/SST.02. La camera se declenche a +64ms (donc sur le tir suivant).
17h53 Changement operateur: Kevin et Hayg
Encore shutter laser qui se bloque.
18h44 : Bon ben impossible de redémarrer, Stop ThomX
|
|
Draft
|
Fri Apr 4 09:05:06 2025 |
ML, VM, DN, ND | Under Process | Shift summary | Ring |
|
Prise de données 4/04 | |
8:59 Mise en chauffe
9:15 Installation laser alignement SR
10:30 Problem Astor et Jive (see screenshot)
Recipe loaded: LI_TL_RI_all_20250402_13_31_23
Adjust orbit
Recipe saved: LI_TL_RI_test_20250404_12_25_21
12:10 Beam stored
Adjust iris position to take into account new ring size.
Problem with controlled access...
14:57 Alignment of the iris OK
15:30 Access to install lenses
17:30 Optimise mens for SR
18:00 Stop beam
|
|
1135
|
Fri Oct 10 09:20:34 2025 |
ND, VM | | Shift summary | Diag | SY |
|
Prise de données 10/10 | |
9:00 Mise en chauffe
9:20 Intervention de deux personnes de Dalkia dans l'igloo.
9h30 Cyclage aimants
10:00 Info: pas de clim laser aujourd'hui (intervention Dalkia en cours)
Etude des coups manqués en fonction de la phase du dephaseur rigol.
12h00 HV is ON at 1215 V
12h05 Laser iris set to 1.3 mm
12h20 Etude signal septum: le signal est tres bruité.
13h00 Faisceau MRSV visible en salle laser
13h20 Etude des coups manqués en fonction de la phase du dephaseur rigol. (cf plot)
Les phases rigol où il y a des pertes se repetent tous les 24 degrees avec une largeur de 6degrees. Reproductible sur plusieurs mesures.
Changement de la frequence anneau: + 4.5kHz, delta phase=52degrees
Etude des coups manqués en fonction de la phase du dephaseur rigol. (cf plot)
C'est a nouveau reproductible tous les 24 degrees mais a des phases differentes.
Changement de fréquence de sonnerie plus : + 4,5 kHz, delta RF Phase 43 dg. (99 dg. on the limit)
**Si vous avez un probleme de coups manqués, faites +12 degrees sur le dephaseur Rigol. Un bouton a ete ajouté sur l'IHM Ring Cavity**
Analyse de l'amplitude des pulses du septum (cf plot en mode persistance): Bruit de l'ordre de 5mV sur 850mV.
Le kicker tire quand l'impulsion du septum n'est pas au maximum.
16h30 EL quads: [-3.67; 4.2; 0.0; -4.08; 3.8; 2.57; -2.54] A (from simulation). Ext. kiker 7422 V. There is image on the EL SST.01 (saved).
16h35 Stop ThomX
Image processing results from the EL/DG/SST.01 camera. The resolution of the target image is 9.8 μm/pixel (horizontally).
The rms width of the horizontal beam profile (Gaussian approximation) is 325 pixels or 3.2 mm (see the figure uploaded). The simulated dispersion at the screen is about 1 m, so the rms energy spread is 0.32%. |
|
756
|
Tue May 23 11:36:24 2023 |
LS, ND | | Shift summary | LI | Diag |
|
Prise de donnees 23/05 | |
9:30 Demarrage machine
Fin installation Cerenkov + tests MRSV
Laser alignement Cerenkov arrive jusqu'a la camera a balayage
11:00 Demarrage machine
13:30 Arret machine. On a vu du Cerenkov dans la boite du milieu du couloir mais pas au dela. Rien sur la camera en salle laser. |
|
821
|
Tue Nov 21 14:29:01 2023 |
Entered by Nicolas Delerue from 134.158.195.142 on Tue Nov 21 14:28:47 2023 | | Shift summary | Diag |
|
Prise de donnees 21/11 | |
13:57 Mise en chauffe
15:00 Faisecau
Tests sur les ecrans
17:00 Arret |
|
657
|
Thu Dec 15 23:59:29 2022 |
ND, Camille Cheney, Mohamed | Under Process | Shift summary | Ring | Ring Commissioning |
|
Prise de donnees 16/12 | |
9h15 Les comptes operateurs etaient restes allumes avec un message d'erreur indiquant que la machine n'etait pas totalement arretee.
Mise en chauffe
9h45 Demarrage Kicker extraction avec MO.
10h15 Cyclage des aimants
10h20 Health check OK (a part les aimants en cours de cyclage)
10h30: Trig
10h40 Arrivee du SPR avec une demande de verification des systemes incendies dans la casemate et les sous_sols!!!! Je leur ai it de voir avec le S. Wurth mais qu'il y avait du faisceau...
11h00 Le SPR avec DEKRA a lance les tests de la centrale incedie. Interlock faisceau!!! Apparement Kevin etait prevenu.
12h15 Tests SPR (qui devaient durer 30 minutes) termines.
Chargement recette LI_RI_TL test 20221215_16_59_39
12h30 Faisceau tres instable sur TL/SST.02 (cf images jointes: 1 tir et 10 tirs)
TL/DP.01 Courant: 167A
12:55 Chargement recette recipe_recipe_LI_TL_RI_good_20221209_18_44_48.txt
===
1) Établir le transport jusqu'à l'anneau
2) Tentative de stockage dans l'anneau
3) Démarrage/calage en temps du kicker d'extraction pour mieux gérer la sortie du faisceau.
4) Caractérisation du faisceau entrant avec étude de l'effet des fentes (TL/DG/SRH) et recherche d'une optimisation à ce niveau là.
5) Transport jusqu'à la LE
6) Vérification des diags de la LE
7) vérification de la calibration des caméras.
8) Tests nouveaux réglages caméra ACE (TL/DG/SST.02)
|
|
841
|
Mon Feb 5 09:13:15 2024 |
ND, Anna K, Elene K, Marie L | New Solution | Shift summary | LI |
|
Prise de donneees 5/02 | |
Coordinator: ND
9h12: Modulator start
PSS: Default centrale SSI
10h30 Beam
Load recipe: LI_TL_straight_test_20231027_11_21_15
12:15 Lunch break
Strange message left on one of the computer screens.
14:15: The shutter was moved over lunch time without it being logged.
14h20 Access to check MRSV
14h40 Restart beam
Some signal observed beam on and not beam off. But strongly misaligned.
Several access, trying to align the MRSV. No luck. More time to be spent on it.
17h30 Stop beam
|
|
811
|
Fri Oct 27 10:13:28 2023 |
ND, Marie Labat | | Shift summary | Diag |
|
Prise de donnee Cerenkov | |
9:30 Mise en chauffe
10:00 git pull
Alignement laser sur camera a balayage
Solenoide 220A
11:00 Alumage faisceau
Recette TL_LE_test_20231026_11_25_43
11:15 Faisceau observe sur camera a balayage
12:30 Pause
14:00 Recherche signaux declenchement.
La voie A1 de la baie 39 n'etait pas connectee.
Recherche de signal... Appel Hamamatsu...
17:00 Signal synchrone observee (cf image) mais problemes a comprendre avec la camera (signal 125MHz après déphaseur très déformé).
18:00 Arret machine
|
|
662
|
Fri Jan 6 09:17:54 2023 |
ND, IC, VK, VM | Under Process | Shift summary | Ring |
|
Prise de donnee 6/01 | |
9:15 Mise en chauffe modulateur
10:23 Temperature chiller incorrecte
11h Optilization of the beam for injection. Beam is unstable, what is seen fro, the x/y position trends in the TL. Then, from time to time the beam is not injected in the ring causing the jumps in the signal intensity ???
12h Hayg helped to find the good conditions and we started to inject in the ring but still with the not stable beam.
14h We try to store the beam by optimizing the parameters of the RF cavity => approaching the good storage. Suddenly the beam changed the parameters and we lost injection.
16h Trying to reestablish the injection and perform the optimization AGAIN
17h Difficult to restore the storage: beam from injector is not stable and therefore difficult to see the effect from the ring studies
18h After several studies, we found the proper RF frequency for current ring settings 500.4259 MHz
With ~20 kV obtained storage is about 15 ms measured with the additional electrode on the scope. Libera several times went down and had to be restarted.
The injection is not stable (intensity goes from 0 to max value), which makes it VERY DIFFICULT to optimize the beam storage in the ring. We added two QUAD (4 and 5) to our optimization routine.
After orbit correction the storage was 100 ms with ~20 kV RF and fRF = 500.404 MHz
Studies to be continued. More stable beam is requested from the injector.
19h30 Shift is finished.
|
|
661
|
Thu Jan 5 01:18:58 2023 |
ND, SC, VM, VK | Under Process | Shift summary | Ring |
|
Prise de donnee 5/01 | |
9h15 Mise en chauffe modulateur
9h30 Fin ronde casemate
9h40 Resisivite eau B18: 4.71
Air comprime: 7 bars
Pression Eau 3 bars
9:45 Health check: tous problems resolu sauf archivage
9:55 Cyclage aimants
=> Probleme sur EL/PS/DP.01 (Unable to reach set point)
=> Probleme sur RI-C1/PS/QP5, RI-C1/PS/QP6, RI-C2/PS/QP6
10:40 Scan charge-phase.
Laser tres desaligne
11:13 Mesure d'energie 50.1MeV
11:15 TL/PS/DP.01: 162.3A
11:28 Phase RF: 103
Stabilite sur TL/DG/SST.02: Environs 2 taches focales
Stabilite sur TL/DG/SST.03: Environs 0,1 taches focales
11:50 Demarrage EP (avec l 'aide de Maher)
TL/PS/DPi.01 = 7.90
RI-C1/PS/DP.01165A
12:13 Before ring tunig: Freq=500.4138MHz
After tuning 500.479MHz
Apres-midi: Tentative de stockage dans l 'anneau.
Avec la cavite RF nous parvenons a faire plus de tour mais pas a stocker
Etude de l 'effet des fentes.
Demarrage du kicker d 'extraction (cf copie d 'ecran)
16:15 Arret laser + faisceau
===
Shift plan:
1) Try to transport the beam in the TL
2) Check stability
3) Try to transport to EL
4) Try to enter the ring and do several turns
5) Close the slits
5) Try to start the extraction kicker ( For septum settings cf https://elog.lal.in2p3.fr/THOMX/Commissionning/571 )
6) Try to store the beam
|
|
744
|
Fri Apr 28 09:20:00 2023 |
ND, LS, IC, VM, VK | New Solution | Shift summary | Ring |
|
Prise de donnee 27/4/2023 | |
9:19: Mise en chauffe
10:24 Cycling magnets
10:50 Demarrage faisceau
11:21 load recipe_recipe_LI_TL_RI_all_20230317_15_52_23.txt
Beam to RI-C2/BPM.05
Problem with injection kicker. Not triggering and DS says Charging power supply is OFF. Maher came to solve the problem (14h). Most probably this was a reason of only 1 turn during the last days.
15h Studies on the DPI and SEPT on the injection (1st BPM x-orbit). Compared to yesterday run, we see the good response on change of the DPI ans SEPT. The first BPM is at +(4-6) mm.
Without injection kicker, beam is lost after ~1 turn.
|
|
743
|
Thu Apr 27 09:24:26 2023 |
ND, LS | New Solution | Shift summary | Ring | Diag |
|
Prise de donnee 26/4/2023 | |
9:24 Mise en chauffe
9:30 Cyclage des aimants
11h44 Démarrage faisceau
Les positions laser sur le feedback ont changé : hor position = 4.950 et ver position = 2.351
Remise des paramètres de référence :
Laser Iris position [H;V] : [4.90/2.42mm]
Solénoides position : Z : 3.3mm, -4.9mrad
X : 0.8mm, 10.201mrad
Scan Charge Phase : Energie max = 286 degres
Solenoide : 225 A
Mesure Energie of the electron (MeV) = 50.0260 +/- 0.0027
Energy at the center of the screen (MeV) = 49.9967
Relative energy spread FWHM (%) : 0.1755
13:30 Problème allumage TL/DPi bloque le MPS
14:00 Faisceau dans EL
Sur EL/SST.01 le faisecau semble etre dans une boite qui est sensible au champ des steerers.
Deux images attachees avec EL/DPI=-6.8 et EL/DPI=-7.1
Meilleure recette pour entrer dans l'anneau : recipe_recipe_LI_TL_RI_all_20230317_15_52_23.txt
Phase RF section 110deg
Attenuateur: 1.94dB
On a reussit a aller jusqu'a ri-C2/DG/BPM.05 mais pas BPM.06
17h32: Arret machine |
|
716
|
Thu Mar 16 10:15:13 2023 |
ND, Enzo Crou, Noé Idesheim, Jean-Nicolas Quenot | New Solution | Shift summary | Ring Commissioning |
|
Prise de donnee 16/3/2023 | |
9:15 Mise en chauffe
10:30 Ronde casemate
10:40 Start beam
RF laser vs section phase: 113
11:50 Le faisceau bouge de 2 taches focales sur TL/SST.03
12:10 Beam in the ring
13:00 Etude injection dans l 'anneau vs RF gun phase (cf plot). La phase de -52 degrees par rapport a la chute de charge semble bonne.
15:30 Etude de l'effet des fentes sur le pic a l'injection
Fente cote mur tue le pic a l'injection tout en laissant stocker vers 21mm
Fente cote anneau: tue l 'injection tout en laissant passer de la charge vers 14mm
Explication des graphes:
- ligne bleue = charge avant injection (bruit de fond)
- ligne orange = charge a l'injection
- ligne verte = charge apres 10 tours
- ligne rouge = charge apres 50 tours
- ligne magenta = charge apres 100 tours
17:00 Arret machine
|
|
Draft
|
Fri Jan 13 09:45:14 2023 |
ND/VK/IC/KD/HG/MJ | Under Process | Shift summary | |
|
Prise de donnee 13/01 | |
Mise en chauffe
9:45 Cyclage aimants
9:48 Demarrage |
|
710
|
Fri Mar 10 09:34:09 2023 |
IC, VM, ND, VK | New Solution | Shift summary | Ring |
|
Prise de donnee 10/3/2023 | |
9h20 Start modulator, cycle magnets
10h20 Intevention Vincent sur PA
10h40 Scan charge phase
12:00 Tentative demarrage cavite
16h00 Diagnostics switched to 1Hz . We returnd to 10 Hz few moments later.
Mohamed turned Cavity to automatic tuning. RF Amplitude 40 kV . Beam is stored.
Understanding of settings of LIbera with N. Hubert.
Tune measurements with excitation coming from extraction kicker (780V), images below.
First time horizontal tune is measured (0.36-0.37) , and is close to the model one. Data stored for postprocessing.
|
|
1162
|
Thu Dec 4 08:59:07 2025 |
Entered by Super Team from 134.158.195.141 on Thu Dec 4 08:58:52 2025 | | Shift summary | LI | TL | Ring |
|
Preparation/check of the 70 MeV WP for X-ray run | |
Goal: preparation and checking the machine operation at 70 MeV and 40 MeV (ideally with X-rays)
8h54 Warming up
RF section 29.20 C -> 28.5 C
9h45 Beam on
Start at 50 MeV and then going to 70 MeV with 70MeV_Xrays_I3I4_20kpA_flatVertorbit_vertSigma_122um__20250821_14_36_08.txt
In this recette the dipoles are at 253.78 A which is 2A lower than nominal current for 70 MeV. The goal is to go to the nominal value.
Phase scans, beam is transported to the ring. Only few turns.
Scan of he RF cavity phase.
scope 192.168.229.22 which used to monitor losses and charge is not accesible as someone else is connected to it from srv 3 with 192.168.229.92. We need control of this scope in the CR.
After also checking it locally, the signals were not set, cable unplugged.
12h30 Problem with SST. Nicolas is checking.
Optimization of the injection. HCOR/VCOR are set to zero. Storage obtained; RF ON freq 500.031690 MHz
Several interlocks shutter laser linac
13h20 Stop for the visit
14h47 beam on
Daniele worked all the afternoon with the students. FPC is changed for 70 MeV.
MRSV does not start; need help for it
Work on the 70 MeV. orbit is corrected. The final tutning should be checked with X rays.
At the end we understood thqt the EL dip is set to 159.3 A. The orbit was recorrected with only the EL dip set to 253.8 A (the difference in the orbits is shown in the scrennshot). The rest of the elements of the EL are should be scaled to 70 Mev (it will not impact the orbit as dipole)
The recetter is saved:
70MeV_ELdip253p8A_20251204_18_10_12.txt
70MeV_with ELat50MeV_20251204_17_10_20.txt
The BLM signals during the shift were moving in time: to be understood, maybe timing problem.
This configuration must be checked with MRSV and/or X-rays to confirm the X-ray flux |
|
1046
|
Fri Mar 28 14:27:01 2025 |
Entered by Super Team from 134.158.195.141 on Fri Mar 28 14:26:38 2025 | | Linac | LI |
|
Prep faisceau pour lundi | |
12h47 Mise en chauffe modulateur
Zone de stockage en rouge
Mise en route frigo, chillers : ok
Kickers en défaut, kicker extraction sera remis en route lundi matin
Laser ok
Faisceau ok
16h17 fin des tests, tout est ok cote canon pour aujourd'hui
|
|
256
|
Fri Jan 14 15:44:53 2022 |
Entered by Alexandre Moutardier from 134.158.195.142 on Fri Jan 14 15:44:40 2022 | | Info | Diag | Linac Commissionning |
|
Premier faisceau OTR ! | |
Première lumière OTR pris sur la station TL/DG/SST.01 !
Images are without and with background substraction.
AM. |