  Toutes les notes concernant les Commissionning de ThomX, Page 34 of 62  Not logged in ThomX    logo
ID Date Author Status Type Category Important Subjectdown Icon
  326   Fri Feb 11 15:07:56 2022 Entered by Viktor Soskov from 134.158.195.153 on Fri Feb 11 15:07:41 2022FixedProblemLinac Commissionning Positions moteurs M4-1(2) 

Positions moteurs

LI/OP/OPT.01-Mir.04-MOP.01   -> =190mm  ???

LI/OP/OPT.01-Mir.04-MOP.01   -> =5410mm   ???

  1185   Wed Jan 21 07:56:59 2026 KD MJ RC DNUnder ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning Position Horiz FPC ("spectres dromadaires") 

7h55: mise en chauffe en remote (modulateur, cyclage, laser, frigo/chillers)
==> plus de trig sur la machine (sur toute la plage de scan de la phase stab du laser PC). ==> OK, je suis une truffe le laser était "off"

**** Programme ****

- mesures RP
- test de différentes position IP pour remédier aux spectres en "dromadaires"

===============================================================

11h X_fpc = -1.8 mm

** Spectres 

centre  [H , V] = [-8.5 , -13.5] 
V+25  [H , V] = [-8.5 , +11.5]

** Mesure taille de source fente1

11h50 X_fpc = 0 mm (faisceau en bord de tube (coupe par le tube meme)

** Spectres 

centre [H , V] = [+62 , -13] 
V+25  [H , V] = [+62 , +12]
H-25  [H , V] = [+37 , -13]

12h30 X_fpc = -0.9 mm

** Spectres 

centre [H , V] = [+25 , -13] 
V+25 [H , V] = [+25, +12]

Plus de phase plus d’electron – 13h22 retour faisceau

H-25 [H , V] = [0 , -13]

Plus de phase – plus d’e- - 13h47 retour faisceau

V+25 [H , V] = [+25 , +12]
Centre [H , V] = [+25 , -13]
H-25 [H , V] = [0 , -13]
H+25 [H , V] = [50 , -13]
V-25 [H , V] = [0+25, -38]

14h30 Retour a X_fpc = -1.8 mm (pour aller a det +/-40 mm)

** Spectres 

centre [H , V] = [-7 , -13] 
V+25 [H , V] = [-7 , +12] 
H+25 [H , V] = [+18, -13] 
H-25 [H , V] = [-32 , -13] 
V-25 [H , V] = [-7 , -38]
V-40  [H , V] = [-7 , -53] (droma)
V-40 [H , V] = [-7 , -53]  avec orbite e- differente  (droma)

15h40 Retour a X_fpc = -0.9

** Spectres 

centre [H , V] = [+25, -13]
V+40   [H , V] = [+25, +27]      anneau “pas bon” (drom)
V+40   [H , V] = [+25, +27]      anneau “reajuste” (un peu drom)

** Mesure taille source fente 1

** Spectres

H+40  [H , V] = [+65, -13]
V-40   [H , V] = [+25, -53]
V-40   [H , V] = [+25, -53] avec cavite RF 200 kV

16h45 X_fpc = - 0.6

** Spectre

centre [H , V] = [+40, -13]
H-40 à [H , V] = [0, -13]
V-40 à [H , V] = [40, -53]
V+40 à [H , V] = [40, +27]
H+30 à [H , V] = [70, -13] (on ne peut pas aller a +40)

** Quelques autres spectres pris

** Mesure taille source fente 1

 

  140   Thu Oct 28 17:25:53 2021 Entered by sophie chance from 134.158.195.141 on Thu Oct 28 17:25:40 2021FixedInfoVide Pompe PP1 

Lorsqu'il y a une coupure de courant la pompe PP1 remet une valeur d'interlock par défaut qui n'avait pas été modifié

Jean-Noel et les personnes du vide ont modifié ce seuil

A 3 dB, 100A, passage à 10 Hz sans problèmes avec le changement de seuil d'interlock de PP1

Passage à 0.25 dB par palier, I = 100A , 10 Hz

  442   Thu Apr 14 11:05:07 2022 Entered by IC/V/SC from 134.158.195.141 on Thu Apr 14 11:04:51 2022Under ProcessLinacLinac Commissionning Polarités des quadrupoles 

Faisceau en route, visualisation sur TL/DG/SST.01

Bobine focalisation : 190 A, LI/PS/STR.01-H01 = -1A, LI/PS/STR01-V01 = 1A, Faisceau quasi au centre de l'écran.

Charge = environ 70 pC à énergie max (-40 degres de phase), phase = 113 degres

Visualisation transmission de charge sur wavecatcher

Test de cyclage des quadrupoles en cours

 

  Draft   Tue Oct 4 17:34:09 2022 Entered by Nicolas Delerue from 134.158.88.175 on Tue Oct 4 17:33:52 2022 Shift summary  Planning shift Thursday 6th October 

- Study beam position on SST and BPM vs iris size / TL/BPM.01

- Start AcQAttrManager

- Study RDP vs TL/BPM.02

- Start MRSV

 

  286   Mon Jan 31 10:03:50 2022 Entered by Super Team from 83.202.31.199 on Mon Jan 31 10:03:38 2022FixedLinacLinac Commissionning Planning cette semaine 

-----------------------------------------------------------------------------------

Planning de la semaine

Lundi

9h- 11h :

activité cavité Fabry Perrot

Mise en place du disque dur alimentations 10h - 13h

mise en place de la mesure de phase en salle laser

Vérification des valeurs prises dans l'archivage (charge à 10 Hz, BPM sortie canon, phase)

Lundi après midi : suivi de la mesure à paramètre constant (phase à la max de charge, visualisation écran, charge, mesure salle laser)

Mardi/mercredi : poursuite du suivie la mesure (Hayg et Marie et Marc(le mercredi))

Jeudi : journée dédiée activité Fabry Perrot

Vendredi : journée test matériels BPM charge (Vincent, Alexandre, Nicolas)

------------------------------------------------------------------

Résumé des discussions

Pour le problème de la phase :

1. Mise en place de la mesure en salle laser (Vincent + Viktor)

2. mettre en place un ordinateur windows en salle de contrôle

3. Prévoir un ordi de pret, ou une mise en place remote desktop pour la semaiene prochaine

4. Vérifier en parallèles des mesures en salle laser la charge, BPM, et phase à 10 Hz : avec l'archivage + visualisation en salle de contrôle

5. Intervention pour la mise en place du coup de poing dans la casemate le jeudi 10 février. Planifier si on effectue dans la foulée un test qui necessiterait l'arret des matériels en amont

6. Problème de commutateur de la baie réseau de la casemate soulevée par Ronic, ainsi que de cablage non prévue

8. Besoin d'un temps pour changer le boitier cpci pour le pilotage des alim.

 

  424   Mon Apr 4 10:50:19 2022 Entered by Super Team from 83.202.31.199 on Mon Apr 4 10:50:04 2022FixedInfoLinac Commissionning Planning cette semaine 

  499   Thu Jul 7 11:13:26 2022 Entered by Viktor Soskov from 134.158.195.153 on Thu Jul 7 11:13:10 2022FixedInfoLinac Commissionning Phototube_Signal 
  4   Tue May 28 15:07:37 2019 Entered by Aurélien Martens from 134.158.88.183 on Tue May 28 15:07:25 2019FixedInfoTango Photocathode laser DS back operational icon7.gif 

Following:

1) a crash on 4th of April and a violent reboot of the ELLiOOs embeded machine

2) the need to recover the whole database files in the ELLiOOs embeded machine

the ElliOOs sofware was running back quickly. Though recently (in terms of working and available days) was reported that the tango DS was not communicating.

The reason why stayed misterious.

Following calls to Amplitude Laser (Vianney) last week and, today, a callabck from SCARELL (Romain and Jean-François), it is now understood that :

- the content of the data repository corresponding to the Tango gateway was not dynamically created (~/bin/ElliOOs/User/Data/28*/*). The specific file that was missing since the 5th of arpil reeboot was Plugin.sml.

Recovering this file and properly rebooting the embedded machine (from the ElliOOs programme running on the HOST, in the System Info --> reboot embedded), allowed to revoer the com.

Indeed it was checked by looking at jive by Falcoz.

An archive of the Code repository was done in case it is required to recover these files again. Archive sent to SCARELL.

Please remember to reboot the embeded in case there is a reoboot of TANGO machine in the main control room or if the database is reset.

Please also note that trying to look at the content of the TANGO_HOST variable in superuser or default user will not help in understanding if tango is running locally.

 

  545   Tue Sep 13 11:49:50 2022 Entered by Viktor Soskov from 134.158.195.153 on Tue Sep 13 11:49:29 2022FixedInfoLinac Commissionning Phase Stability 

Bonjour, voici la stabilité de phase laser(oscillateur)-horloge(500MHz). La phase commence à bouger quant  linac fonctionne (se chauffe).

Viktor.

  243   Tue Jan 11 19:30:19 2022 Entered by Nicolas Delerue from 134.158.195.141 on Tue Jan 11 19:30:03 2022FixedFixSY Pb declenchement scope synchro 

La frequence des diags etait reglee a 0.1Hz et le scope de la salle de controle se declenchait sur les diags. C'est pour cela que le scope se declenchait toutes les 10s.

Les signaux en salle de controle ont une longueur de 10ms mais ceux distribues ont les largeurs demandees (20us et 10us respective,ent pour les signaux klystron)

J'ai verifie les reglages des signaux de declenchement du Klystron (generateur 1, canaux 9 et 10). Nous sommes aux memes reglages (retard, amplitude et largeur) que dans la recette du 17/11.

 

  253   Fri Jan 14 12:35:13 2022 Entered by Super Team from 134.158.195.142 on Fri Jan 14 12:35:01 2022FixedInfoLinac Commissionning Pause déjeuner 

Ne pas toucher les réglages, merci

  134   Thu Oct 28 13:46:37 2021 Entered by sophie chance from 134.158.195.141 on Thu Oct 28 13:46:25 2021Under ProcessLinacLinac Commissionning Passage à énergie max 

Solenoide à 140A , attenuateur canon 3 dB, difficile de passer les 150A

Passage à Energie max

  972   Tue Dec 3 09:14:50 2024 SC, HG, VMUnder ProcessLinacLI | TL Passage à 61.5MeV et 70 MeV 

9h14 Mise en chauffe

Pas de camera laser qui s'ouvre sur PlateformeIHM

9h19 cyclage aimants LI, TL sur interface

soucis DS camera laser, impossible à redémarrer.
--> du coup impossible de démarrer le feedback du laser

Chargement recette good_20241114_15_27_46, optimized storage for X_rays (5/6)

Mesure energie : 48.34 MeV attenutation 2.7 dB

Energie = 54.21 MeV attenuation 1.7 dB

Energie = 58.77 MeV attenuation 1 dB

Energie = 60.29 MeV attenuation 0.5 dB

Passage à 61.5 MeV dans la TL --> recette enregistrée

Passage à 70 MeV dans la TL --> recette enregistrée, solenoide est à 210 A, dipole = 255.8A

Modification des steerers :

LI/PS/STR.01_H01 = 1.17A

LI/PS/STR.01_v01 = -2.16

LI/PS/STR.02_V01 = 2.32

LI/PS/STR.02_H01 = 1.17A

Images sauvegardées le long du transport

Après alignement quad sans le steerer TL :

LI/PS/STR.01_H01 = 1.18

LI/PS/STR.01_V01 = -220

LI/PS/STR.02_H01 = -2.97

LI/PS/STR.02_V01 = 2.34

Puis mesure transmission charge vs soleno

 

 

18h30 Arret

 

  145   Fri Oct 29 13:57:49 2021 Entered by sophie chance from 134.158.195.142 on Fri Oct 29 13:57:22 2021Under ProcessLinacLinac Commissionning Passage section 

Le faisceau a passé la section

STR01-V01 = -1.10, STR01-H01 = -1.90

Ifoc = 150A, phase 263, 1.5 dB section, 0.25 dB canon

 

  887   Fri Jul 19 14:59:48 2024 Entered by Nicolas Delerue from 193.55.29.173 on Fri Jul 19 14:59:34 2024FixedFixOpt Passage a 25Hz IHM conditionnement 

Le bouton pour passer le conditionnement à 25Hz a été ajouté sur l'IHM conditionnement.

  391   Tue Mar 8 13:22:01 2022 Entered by SC/MO/CB from 134.158.195.142 on Tue Mar 8 13:21:48 2022FixedLinacLinac Commissionning Paramètres faisceau du jour 

Attenuateur canon = 0dB

Energie mesurée  = 50 MeV

Charge mesurée à énergie maximum = 54 pC

Bobine sortie canon = 160 A, LI/PS/STR.02-H.01 = -0.7 A, LI/PS/STR.02-V.01 = -0.9A

 

  353   Fri Feb 18 13:53:19 2022 Entered by SC/JNC from 134.158.195.141 on Fri Feb 18 13:53:04 2022FixedLinacLinac Commissionning Paramètres faisceau 

Energie laser sur photocathode : 40 - 45 uJ

Démarrage faisceau

Charge : 115 pC, faisceau instable, pas d'alignement pour l'instant sortie canon

Attenuation de 2 dB, HT = 1090 V canon

 

  90   Tue Oct 5 10:24:12 2021 Entered by Super Team from 134.158.195.142 on Tue Oct 5 10:23:47 2021Under ProcessLinacLinac Commissionning Paramètres RFs  

Signal à 150 mV -> Gradient de 80 MV/m

 

  417   Thu Mar 24 17:12:01 2022 Entered by ND/VC/HG/SC from 134.158.195.142 on Thu Mar 24 17:11:44 2022Reference SolutionLinacLinac Commissionning Paramètres Faisceau 

Alignement laser

On retrouve la phase pour la charge max phi = 313 degres (consigne chiller canon = 31.25 degres)

On enlève 40 degres à la phase de charge max pour arriver à la phase d'énergie maximum phi = 273 degres

On focalise le faisceau avec la bobine de sortie canon I = 170 A

On peut l'observer sur la camera LI/DG/SST.01

On passe ensuite la section phi section = 100 degres (consigne chiller section 28.95 degres)

On met du courant dans le steerer avant section LI/PS/STR.02-V.01 I = 0.83A et LI/PS/STR.02-H.01 I = -0.90A

On observe sur TL/DG/SST.01

On peut observer les trends des ICTs avec taurus plot er/ca/rac.05-elr.01_wac.02/ch0 pour ICT1