  586   Wed Oct 12 20:11:14 2022 KD, MJ, RCFixedShift summaryLI | Diag | MECA | Linac Commissionning Shift du 12/10/2022 (prise de données) Mise en chauffe Modulateur vers 9h

9h - 10h : installation Laser 33MHz
de la CFP par Ronic
 2022-10-12_15_38_25_li_dg_sst_01-ccd_01_RAW_16bits.tiff 
  585   Tue Oct 11 11:57:19 2022 HG/CB InfoLI | TL | LE | Linac Commissionning run du 11/10/2022 Iris de 2mm, prise d'image @12h -->
dimension H 0.37mm et V 0.34mm

iris 1mm, prise d'image @12h14
 BPM_saturation_2022-10-11_15-07-37.png 
  584   Tue Oct 11 11:09:21 2022 Entered by Marie Jacquet from 134.158.89.45 on Tue Oct 11 11:09:03 2022Not FixedProblemLinac Commissionning Valeurs des BPM LI et TL_1 surestimees ? Ci-jointes des donnees BPM et YAG LI et
TL_1, prise le 20/06 puis le 06/10, en fonction
de valeurs des steerers 1 (pour LI) et 3
 2022-10-11-BPM-YAG-STR.pdf 
  583   Mon Oct 10 17:20:11 2022 Entered by Viktor Soskov from 134.158.195.153 on Mon Oct 10 17:19:55 2022FixedInfoLinac Commissionning Laser status Bonjour, un téléscope (F1=150mm,
F2=-75mm, réduction=2) a été
installé sur la table optique dans
  
  582   Mon Oct 10 15:10:36 2022 Entered by Viktor Soskov from 134.158.195.153 on Mon Oct 10 15:10:21 2022FixedInfoLinac Commissionning Laser status Bonjour, l'énergie UV actuelle
sur la cathode:

Iris 3mm - 92µJ
  
  581   Mon Oct 10 14:44:44 2022 KD, VS, SCFixedShift summaryLI | Laser shift du 10 octobre 2022 Viktor est intervenu ce matin pour réaligner
le laser sur un autre point du chemin optique
(éviter la partie endommagée
  
  580   Fri Oct 7 11:57:24 2022 IC, VM, VK, AL, JHUnder ProcessShift summaryRing Commissioning Optimization of the ring Start of the modulator at 9h45

11h30 Problem with water regulation.
Probably falseread of GUN PT100. Hayg and
 6x 
  579   Fri Oct 7 00:30:24 2022 Entered by Marie Jacquet from 88.165.97.136 on Fri Oct 7 00:30:03 2022 Shift summaryLinac Commissionning shifts LINAC 4/10 et 6/10 4/10 : Prise de donnees "Alignement
LINAC" (Hayg Marie)

Iris
  
  578   Thu Oct 6 10:18:03 2022 VK/ND/SC AnneauRing Commissioning Faisceau Anneau Modulateur Impossible à passer en
Standby ==> problème manque d'eau.

     
 10x 
  Draft   Wed Oct 5 19:02:28 2022 VK, VM, HG,IC, AL      Shift started with machine receipy from
Monday .

Scan parameters, injection to find
  
  Draft   Tue Oct 4 17:34:09 2022 Entered by Nicolas Delerue from 134.158.88.175 on Tue Oct 4 17:33:52 2022 Shift summary  Planning shift Thursday 6th October - Study beam position on SST and BPM vs
iris size / TL/BPM.01

- Start AcQAttrManager
  
  Draft   Tue Oct 4 15:47:22 2022 MJ/HG/SC LinacLinac Commissionning Alignement linac Modulateur HV=1090V enregistrement des
Pic

Faisceau linac en cours
  
  574   Mon Oct 3 20:31:09 2022 VK, AL, ICReference SolutionShift summaryRing Commissioning Beam is stored Shift started at 18h

With the current injector settings,
it was difficult to inject.  We loaded
 6x 
  Draft   Mon Oct 3 14:08:06 2022 VC/KD/SCNew SolutionLinacLinac Commissionning Faisceau linac 13h : MO : Mise en chauffe modulateur et
mise en route refroidissement

14h : Fermeture casemate, démarrage
  
  572   Mon Oct 3 12:51:26 2022 Slava, Viktor M, IrynaFixedProblemRing Commissioning Check the QUADs in the ring On last Friday, we found that there is
a potential problem with QUAD 9, 10
an 12 as by switching them OFF, we obtained
  
  571   Fri Sep 30 08:30:38 2022 AM, VI, VK, IC, VC, NDNew SolutionShift summaryRing Commissioning Shift du 30/09/2022 AM :

Hier soir : extinction des PC clients1
et clients 2
 16x 
  570   Thu Sep 29 07:59:51 2022 AM, IC, VK, VI, SC, ND Shift summaryLI | TL | Ring | Diag Shift du 29/09/2022 AM :

git pull sur $HOME_IHM


pression vanne vide : 5.7
 9x 
  569   Wed Sep 28 19:14:11 2022 Entered by Marie Jacquet from 134.158.89.45 on Wed Sep 28 19:13:52 2022 Shift summaryLinac Commissionning Shift du 12-13/09 en image  En pj, les donnees "Alignement LINAC"
du 12-13/09, en image (donnees brutes notees
dans le elog le 16/09).
 2022-09-28-elog.pdf 
  568   Wed Sep 28 08:31:27 2022 VC VK AM IC & allUnder ProcessShift summaryRing Commissioning Shift du 28/09/2022 icon14.gif AM :

git pull sur $HOME_IHM


pression vanne vide : 8
 Screenshot_from_2022-09-28_19-05-00.pngScreenshot_from_2022-09-28_19-08-26.pngfirst_turn28092022.png 
  567   Tue Sep 27 08:40:33 2022 VC SC CBUnder ProcessShift summaryLI | Linac Commissionning Shift du jour Summary:

- Mesure du jitter et de la position
relative de pulse laser PC avec la RF canon
  