1241
|
Wed May 13 08:35:16 2026 |
Entered by Super Team from 127.0.0.1 on Wed May 13 08:35:01 2026 | Under Process | Other | LI |
|
manip Gplast | | demarrage machine 8h30
faisceau ok vers 10H
14h mesure 50 MeV |
|
|
Draft
|
Wed Jun 3 08:54:55 2026 |
IC, VM | Under Process | Urgent | LI | RF Anneau |
|
Restart of the accelerator | | 08h45 Start-up modulator, laser, magnets
09h38 Shutter Laser Linac is yellow.
Tuning off the gun operation key does not |
 |
|
Draft
|
Wed Jun 17 08:36:20 2026 |
IC, VM | Under Process | Problem | Vide |
|
Restart of the accelerator | | 08h35 Start-up modulator (it was already
on standby), laser, magnets, cycling.
As yesterday there is a problem |
 |
|
35
|
Fri Jun 11 18:47:23 2021 |
Hayg | Reference Solution | Linac | RF D1 |
|
DS pour les températures des chillers |
| Listes des Ds pour les températures
des chillers
GUN : ER/HF/RAC.17-API.AI1/ |
|
|
51
|
Thu Jul 15 12:39:56 2021 |
Entered by Kevin Dupraz from 134.158.195.153 on Thu Jul 15 12:39:32 2021 | Reference Solution | Info | Opt | Linac Commissionning |
|
Alignement PhotoCathode | | L'alignement de la PhotoCatode est
fini. Il est a noter :
- La position de la camera a ete |
|
|
52
|
Thu Jul 15 15:49:36 2021 |
Entered by Kevin Dupraz from 134.158.195.153 on Thu Jul 15 12:39:32 2021 | Reference Solution | Info | Opt | Linac Commissionning |
|
RE: Alignement PhotoCathode | | Le tube de liaison a ete remis, le faisceau
etait legerement decale. Il a ete realigner
sur la PhotoCathode (1mm a gauche de la sortie |
|
|
89
|
Tue Oct 5 10:05:21 2021 |
Entered by Hayg Guler from 134.158.195.141 on Tue Oct 5 10:05:07 2021 | Reference Solution | Linac | Laser |
|
Comment éteindre le laser |
| Pour couper le Laser :
il faut arrêter seulement
l'Ampli, et laisser l'oscillateur |
|
|
176
|
Tue Nov 23 12:11:16 2021 |
Entered by Super Team from 134.158.195.141 on Tue Nov 23 12:11:01 2021 | Reference Solution | Info | Laser | Linac Commissionning |
|
energie laser | | La puissance laser aujourd'hui (23/11/2021)
est de :
- Sortie laser : 200 uJ |
|
|
235
|
Wed Jan 5 17:35:11 2022 |
Entered by Super Team from 134.158.195.141 on Wed Jan 5 17:34:46 2022 | Reference Solution | Info | Laser | Linac Commissionning |
|
Iris Motorisé | | [KD et HG]
- Mise en place de l'iris
motorisé à peu près |
|
|
417
|
Thu Mar 24 17:12:01 2022 |
Entered by ND/VC/HG/SC from 134.158.195.142 on Thu Mar 24 17:11:44 2022 | Reference Solution | Linac | Linac Commissionning |
|
Paramètres Faisceau | | Alignement laser
On retrouve la phase pour la charge
max phi = 313 degres (consigne chiller canon |
|
|
574
|
Mon Oct 3 20:31:09 2022 |
VK, AL, IC | Reference Solution | Shift summary | Ring Commissioning |
|
Beam is stored | | Shift started at 18h
With the current injector settings,
it was difficult to inject. We loaded |
6x |
|
737
|
Thu Apr 20 10:36:19 2023 |
Entered by Super Team from 134.158.195.142 on Thu Apr 20 10:36:01 2023 | Reference Solution | Shift summary | LI | TL | Aimants | Linac Commissionning |
|
référence axe mag Canon | | Voici la référence tete de
machine pour l'axe mag canon :
Laser Iris position [H;V] |
|
|
762
|
Wed Jun 7 16:02:33 2023 |
LS, MB, VC, ND | Reference Solution | Shift summary | Ring |
|
Programme prise de donnees 8/06 | | 9:23 Mise en chauffe
Nombreux pb vide dans health check
Acces casemate pour verification |
   |
|
796
|
Wed Sep 27 12:38:08 2023 |
KD | Reference Solution | Shift summary | SY | Linac Commissionning |
|
run du 27 septembre 2023 | | 12h38 : Mise en chauffe de la machine (modulateur,
chiller, laser)
==> mise en place de la version |
|
|
800
|
Thu Oct 5 08:39:05 2023 |
Entered by Super Team from 134.158.195.141 on Thu Oct 5 08:38:51 2023 | Reference Solution | Shift summary | Laser | Opt | Linac Commissionning | Ring Commissioning |
|
run du 5 octobre 2023 | | 8h30 : mise en chauffe de la machine
*** Comment aires *** |
|
|
801
|
Fri Oct 6 18:45:56 2023 |
KD | Reference Solution | Shift summary | Laser | Opt | Linac Commissionning | Ring Commissioning |
|
run du 6 octobre 2023 | | 17h: Pris en main de la machine (anneau
à 500.34MHz). Qualité du stockage
très aléatoire (bruit de synchro). |
|
|
Draft
|
Tue Oct 10 09:02:36 2023 |
KD | Reference Solution | Shift summary | Linac Commissionning | Ring Commissioning |
|
shift du 10 octobre 2023 | | 9h: mise en chauffe de la machine
- La clé PA est resté
enclenchée, les lumières allumées. |
|
|
805
|
Wed Oct 11 09:07:49 2023 |
KD | Reference Solution | Shift summary | Laser | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 11 octobre 2023 | | 9h: mise en chauffe de la machine
* injection dans l'anneau avec
la recette 500.25MHz |
|
|
806
|
Wed Oct 18 10:08:24 2023 |
KD, MJ, HG, DN, IC, & al. | Reference Solution | Shift summary | Laser | Opt | SY | Linac Commissionning | Ring Commissioning |
|
shift du 18 octobre 2023 | | 10h : mise en chauffe de la machine (chillers,
modulateur, laser, alims).
*** Programme *** |
 |
|
815
|
Thu Nov 9 09:02:39 2023 |
KD | Reference Solution | Shift summary | LI | TL | LE | Ring | Diag | CC | Laser | Opt | RF Anneau | SY | Linac Commissionning | Ring Commissioning |
|
shift du 09 novembre 2023 | | 8h30 : démarrage machine (laser,
klystron, chiller, frigo, aimant)
* Beaucoup de problème de |
|