HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 30 of 62  Not logged in ThomX    logo
ID Date Author Statusdown Type Category Important Subject Icon Text Attachments
  1241   Wed May 13 08:35:16 2026 Entered by Super Team from 127.0.0.1 on Wed May 13 08:35:01 2026Under ProcessOtherLI manip Gplast demarrage machine 8h30

faisceau ok vers 10H

14h mesure 50 MeV
  
  Draft   Wed Jun 3 08:54:55 2026 IC, VMUnder ProcessUrgentLI | RF Anneau Restart of the accelerator 08h45 Start-up modulator, laser, magnets

09h38 Shutter Laser Linac is yellow.
Tuning off the gun operation key does not
 GunCharge_vs_LaserAtt.pngGunDarkCurrent_vs_Att.png 
  Draft   Wed Jun 17 08:36:20 2026 IC, VMUnder ProcessProblemVide Restart of the accelerator 08h35 Start-up modulator (it was already
on standby), laser, magnets, cycling.

As yesterday there is a problem
 Screenshot_from_2026-06-17_15-54-18.pngScreenshot_from_2026-06-17_15-50-21.png 
  35   Fri Jun 11 18:47:23 2021 HaygReference SolutionLinacRF D1 DS pour les températures des chillers icon1.gif Listes des Ds pour les températures
des chillers


GUN : ER/HF/RAC.17-API.AI1/
  
  51   Thu Jul 15 12:39:56 2021 Entered by Kevin Dupraz from 134.158.195.153 on Thu Jul 15 12:39:32 2021Reference SolutionInfoOpt | Linac Commissionning Alignement PhotoCathode L'alignement de la PhotoCatode est
fini. Il est a noter :

- La position de la camera a ete
 Image__2021-07-15__12-34-45_PCVirtuelle.bmp 
  52   Thu Jul 15 15:49:36 2021 Entered by Kevin Dupraz from 134.158.195.153 on Thu Jul 15 12:39:32 2021Reference SolutionInfoOpt | Linac Commissionning RE: Alignement PhotoCathode Le tube de liaison a ete remis, le faisceau
etait legerement decale. Il a ete realigner
sur la PhotoCathode (1mm a gauche de la sortie
 Image__2021-07-15__12-34-45_PCVirtuelle.bmp 
  89   Tue Oct 5 10:05:21 2021 Entered by Hayg Guler from 134.158.195.141 on Tue Oct 5 10:05:07 2021Reference SolutionLinacLaser Comment éteindre le laser icon3.gif Pour couper le Laser :


il faut arrêter seulement
l'Ampli, et laisser l'oscillateur
  
  176   Tue Nov 23 12:11:16 2021 Entered by Super Team from 134.158.195.141 on Tue Nov 23 12:11:01 2021Reference SolutionInfoLaser | Linac Commissionning energie laser La puissance laser aujourd'hui (23/11/2021)
est de :

  - Sortie laser : 200 uJ
  
  235   Wed Jan 5 17:35:11 2022 Entered by Super Team from 134.158.195.141 on Wed Jan 5 17:34:46 2022Reference SolutionInfoLaser | Linac Commissionning Iris Motorisé [KD et HG]

-  Mise en place de l'iris
motorisé à peu près
  
  417   Thu Mar 24 17:12:01 2022 Entered by ND/VC/HG/SC from 134.158.195.142 on Thu Mar 24 17:11:44 2022Reference SolutionLinacLinac Commissionning Paramètres Faisceau Alignement laser

On retrouve la phase pour la charge
max phi = 313 degres (consigne chiller canon
  
  574   Mon Oct 3 20:31:09 2022 VK, AL, ICReference SolutionShift summaryRing Commissioning Beam is stored Shift started at 18h

With the current injector settings,
it was difficult to inject.  We loaded
 6x 
  737   Thu Apr 20 10:36:19 2023 Entered by Super Team from 134.158.195.142 on Thu Apr 20 10:36:01 2023Reference SolutionShift summaryLI | TL | Aimants | Linac Commissionning référence axe mag Canon Voici la référence tete de
machine pour l'axe mag canon :

Laser Iris position  [H;V]
  
  762   Wed Jun 7 16:02:33 2023 LS, MB, VC, NDReference SolutionShift summaryRing Programme prise de donnees 8/06 9:23 Mise en chauffe

Nombreux pb vide dans health check

Acces casemate pour verification
 health_check_2023_06_08_09_30.pnghealth_check_RF_2023_06_08_09_30.pnghealth_check_Vide_2023_06_08_09_30.pnghealth_check_Alimentation_2023_06_08_09_31.png 
  796   Wed Sep 27 12:38:08 2023 KDReference SolutionShift summarySY | Linac Commissionning run du 27 septembre 2023 12h38 : Mise en chauffe de la machine (modulateur,
chiller, laser)

==> mise en place de la version
  
  800   Thu Oct 5 08:39:05 2023 Entered by Super Team from 134.158.195.141 on Thu Oct 5 08:38:51 2023Reference SolutionShift summaryLaser | Opt | Linac Commissionning | Ring Commissioning run du 5 octobre 2023 8h30 : mise en chauffe de la machine

 

*** Comment aires ***
  
  801   Fri Oct 6 18:45:56 2023 KDReference SolutionShift summaryLaser | Opt | Linac Commissionning | Ring Commissioning run du 6 octobre 2023 17h: Pris en main de la machine (anneau
à 500.34MHz). Qualité du stockage
très aléatoire (bruit de synchro). 
  
  Draft   Tue Oct 10 09:02:36 2023 KDReference SolutionShift summaryLinac Commissionning | Ring Commissioning shift du 10 octobre 2023 9h: mise en chauffe de la machine

- La clé PA est resté
enclenchée, les lumières allumées.
  
  805   Wed Oct 11 09:07:49 2023 KDReference SolutionShift summaryLaser | Opt | Linac Commissionning | Ring Commissioning shift du 11 octobre 2023 9h: mise en chauffe de la machine

* injection dans l'anneau avec
la recette 500.25MHz
  
  806   Wed Oct 18 10:08:24 2023 KD, MJ, HG, DN, IC, & al.Reference SolutionShift summaryLaser | Opt | SY | Linac Commissionning | Ring Commissioning shift du 18 octobre 2023 10h : mise en chauffe de la machine (chillers,
modulateur, laser, alims).

*** Programme ***
 Screenshot_2023-10-18_17-15-49.pngscrprint.png 
  815   Thu Nov 9 09:02:39 2023 KDReference SolutionShift summaryLI | TL | LE | Ring | Diag | CC | Laser | Opt | RF Anneau | SY | Linac Commissionning | Ring Commissioning shift du 09 novembre 2023 8h30 : démarrage machine (laser,
klystron, chiller, frigo, aimant)

* Beaucoup de problème de
  
ELOG V3.1.4-395e101