Entry   Entered by Marie Jacquet from 134.158.89.45 on Mon Nov 28 14:25:31 2022; Lmag STR 3 (steerer après la LIL) 2022-11-28-STEERER_3_Lmag.pdf

Nouvelle détermination de Lmag du Steerer 3

Lmag STR3 = 67.6 mm (cf. pj)

Avec ça, la mesure de l'énergie post LIL devrait être de ~50 MeV au lieu des ~52 qu'on trouvait habituellement.

Entry   KD, VC; shift du 28 Novembre 2022 

8h45 -9h :  - Démarrage frigo (pression entrée Frigo max ~ 5.5 bar). Le Frigo semble tenir et jouer son role. 

                  - Démarrage Modulateur (mise en chauffe)

                  - Démarrage Laser

                  * Le PSS est HS, il faut le redémarrer

9h15 : Arret Machine ==> intervention sur le pont de l'IGLOO. Reprise cette après midi si tout se passe bien. (SPR et autre nous ont pas prévenu).

10H30 : redpitaya en baie 17... (testées vendredi 25 )

redpitaya 2  connection impossible serveur éteind et starter serveur sous astor ne fonctionne pas  => Philippe G contacté par mail

redpitaya 1 3 4 les parametres (ATK pannel) Triger source=6 et trigger level=1) était à leurs valeurs par défaut ....  

Vérification de la lecture du phototube sur la voie B de la Redpitaya 4  => OK (attention la forme du signal à changé)

13h30 : Mise en chauffe modulateur. Le Frigo était en alarme "Haute température".

 

**** Problème ****

- L'IHM sst bug : faisceau sature et les boutons d'intensité ne semble pas agir. Bug d'affichage également sous les boutons gain et exposure time. Sinon l'interface est plutot agreable à utiliser

 

 

Entry   Entered by Maher OMEICH from 134.158.91.212 on Fri Nov 25 09:58:16 2022;  

Vendredi 25/11

Conditionnement Klystron: le conditionnement du klystron avec RF progresse lentement au delà du point de fonctionnement ( 24 MW )  jusqu'à équivalant de 30 MW ( courbe klystron ) mais ce n'est pas stable ça tomble par le réfléchi. Pour les mesures radio pro: le klystron a fonctionné en mode diode ( c'est à dire sans RF à l'entrée du klystron ) à sa puissance maximale ( courant et tension ) les mesures du rayonnement autour du klystron sont faites.

Pour le frigo: J'ai contacté la personne ( frigoriste ) pour convenir d'un rdv, çà sera lundi 28/11, il va me confirmer par sms l'heure de son arrivée.

Maher

 

Entry   Entered by Maher OMEICH from 134.158.91.212 on Thu Nov 24 10:14:31 2022;  

J'ai un problème sur le frigo des chillers section et canon qui ne refroidie pas, je contacte la socièté Réglochill

Maher

Entry   Entered by Maher OMEICH from 134.158.91.212 on Thu Nov 24 09:42:54 2022; pour info 

Démarrage de chauffage klystron après mesure du filament kly. suite à la coupure d'hier ( par eau ): le modulateur etait en fonctionnement ( en TRIG ) pour tester le klystron remplacer la semaine dernière, ces tests ont commencé lundi dernier, mardi et mercredi ( jusqu'à la coupure d'eau )

Maher

Entry   Entered by Viktor Soskov from 134.158.195.153 on Wed Nov 16 16:33:14 2022; Laser status 

Bonjour, le phototube UV est installé à la place du PD.

Viktor.

Entry   ND; Operations du 7/11/2022 Screenshot_from_2022-11-07_14-07-30.pngscan_charge_phase_min_0.0_max_360.0_14_5_57.pngscan_charge_phase_min_140.0_max_180.0_14_6_41.pngdispersion_figure.png

10:50 Fin intervention CFP

Intervention laser photocathode toujours en cours et prioritaire mais preparation casemate.

11:10 Pb vide dans health check resolu.

11h30 intervention laser terminée!

11:40 Ronde fosse Nord + Fosse Sud + Casemate

12:00 Test cyclage aimants

Analyse erreur cylage sur RI-C2/PS/QP.02 and RI-C1/PS/QP.06

Si l'on passe de 8A a 10A il y a une erreur overvoltage.

Sur RI-C2/PS/QP.02 passer de 8A a 9.3A est suffisant pour causer l 'erreur

Sur RI-C1/PS/QP.06 passer de 8A a 9.6A est suffisant pour causer l 'erreur.

12:46 Modulateur en standby

13:55 Beam ON

Modulateur status bit =8 => vacuum problem

14:10 Scan charge phase, MaxE=106

14:18 Chargement recette recipe_recipe_LI_TL_RI_all_20221104_18_20_56.txt

15:30 Minimum dispersion at 113

17:40 arret faisceau

 

 

 

Entry   VK, VM, IC, KD; Ring commissioning 7x

Start of the machine by KD

11h20 The beam is in the ring

Optimization of the injection with the RCDS

Off-momentum injection from the injector

Based on the observation (attached here), it seems that there is a resonant excitation of the beam by the RF cavity. Difficult to scan with the dipole field.

=> The RF cavity should be checked and during the runs detuned.

=> Probably the priority to the RF cavity conditioning should be given to progress on the Ring comissioning

The BPM.04-LIB.03 (just before the FPC) gives a strange vertical orbit. This should be checked and further invetigated.

Test of the script to swotch off the machine by KD.

18h45 End of the shift

 

Entry   Entered by Marie Jacquet from 134.158.205.43 on Fri Nov 4 11:56:17 2022; Mesures BPM et YAG vs Steerers - 17/10, 24/10 et 26/10 2022-11-04-BPM-YAG-STR.pdf

Ci-joint le bilan BPM et YAG vs steerer de 3 jours differents : le 17 le 24 et le 26 octobre

En abscisse : c'est le deplacement attendu calcule a l'aide de l'intensite du steerer (strLI ou strTL1, vertical et/ou horizontal), des caracteristiques du steerer, des coordonnees Z des elements,

En ordonnee : c'est le deplacement mesure aux BPM (LI ou TL) ou aux YAG (LI ou TL)

 

1) Les BPM restent sous-estimes

2) Comme dit dans un echange mail recent, il faudrait cycler les steerers et refaire ces mesures si on veut de la precision

 

Entry   ND, IC, VK, VM; Shift àf 3/11/2022 9x

9:10 Air pressure: 8 bars, water resistivity 6,33Mohm

9:15 Modulator warm-up

9:20 Ronde zone modulateur

9:25 Ronde casemate

9:38 Health check: Pb vide et Alimentation

RI-CI/PS/STR.05-H.01 state=Alarm => Overvoltage => acquittee => OK

Deuc vannes vide fermee autour de la cavite RF =>  Ouverte

9:47 Croise par hasard deux personnes de Dalkia en intervention ...

10:02: Cyclage des aimants (tous dans IHM cycling) => certains aimants vont au dela de la limite de courant lors du cyclage => Cyclage a revoir...

10:20 Modulator interlock (bit 0 and 1)

10:40 OK (interface moduateur plantee?)

10:48 Trig => interlock

Trig@1000V

Pb vide

Trig@1090V

11:10 Scan charge phase

11:14 Chargement recette recipe_recipe_LI_TL_RI_20221021_16_15_04.txt

11:25 Beam found on TL/SST.02 with TL/DP.01=151.7 A

Min dispersion at Phase RF= 111

Changement de recette recipe_recipe_LI_TL_RI_20221020_15_31_20.txt

11:35 On TL/SST.03 the beam looks like Casper!

11:39 Beam in the ring

12:27 Ouverture Iris => 2mm, attenuateur => 330mm

Q=100pC

12h only few turns in the ring. Searching for the problem. Use recipie from Friday 21 October. Does not Help.

Found that QP 12 was OFF => turned ON. Optimized beam. Ri-C2 steerers were OFF.

Ring_saving function for saving orbit params in matlab.

Ring dipole 157-156 - better orbit, less  of beta excitations.

Work with correctors. HCOR=> all  0, orbit exist. Restart orbit correction with SVD to find  the new settings. Need to compare how different to the previous corrector values.

Same in vertical.

RCDS for injection optimisation.

TBT data not stable.

Quads and Sext +-5%

 

 

 

 

 

 

 

 

 

Entry   MJ JNC; phase en delire 

Qund on lance l'ihm charge phase, le plot charge phase arrive puis une routine cointinue par pas de 1 degres, je crois, puis lla phase part en delire, elle change tout le te,ps sans qu on ne fasse rien. J'ai constate cq plusieurs fois

    Reply   ND; RE: phase en delire 

Après un premier scan sur 0-360 degres le script lance un second scan sur la zone la plus probable de maximum de charge pour trouver plus précisement le meximum de charge. Il met ensuite la phase au maximum de charge - 50 degres ce qui correspond à peu prêt au maximum d'énergie.

MJ JNC wrote:

Qund on lance l'ihm charge phase, le plot charge phase arrive puis une routine cointinue par pas de 1 degres, je crois, puis lla phase part en delire, elle change tout le te,ps sans qu on ne fasse rien. J'ai constate cq plusieurs fois

 

Entry   MJ KNC; ecrans yag 1 et 2 desinchro 

yag1 et yag2 sont completement desynchro.de la machine  il faut augmenter image counter a environ 0.5 pour voir qq chose

 

Nicolas ?????

    Reply   ND; RE: ecrans yag 1 et 2 desinchro 

Je viens de regarder LI/SST.01 et TL/SST.01 étaient en attenuation maximale. Si le problème se reproduit, il faut cliquer sur "Full intensity" sur l'IHM SST.

.MJ KNC wrote:

yag1 et yag2 sont completement desynchro.de la machine  il faut augmenter image counter a environ 0.5 pour voir qq chose

 

Nicolas ?????

 

Entry   SC/ND; Démarrage faisceau et TP scan_charge_phase_min_200.0_max_280.0_12_4_46.png2022-10-28_12_39_29_tl_dg_sst_02-ccd_01_RAW.png

9h19 : Mise en route modulateur et refroidissements

10h45: Start the Modulator

11h30 : Scan charge
Max chage : 238°
Max energy : 188°

12h : load recipe : recipe_recipe_LI_TL_RI_20221021_16_15_04.txt
Dipole TL switch off -> Beam on TL/DG/SST.01

12h30 : Dipole TL switch on
Beam on TL/DG/SST.02
Beam energy and enegy spread improved by increase phase to 204 (cf image) (dipoles at 156A)

12h45 : Injection dans l'anneau
calcul convetion A -> rad for kicker

13h50:
Test on TL/DG/SST.02


 

===

Program for the shift on 28/10

1) Start beam

2a) Measure respone of TL/SST.2  as function of time

2b) Try to put TL/SST2 on negative polarity

3) Study BPM attenuation

4) Test Alexandre's feedback

5) Cerenkov

Entry   Entered by Marie Jacquet from 134.158.89.45 on Thu Oct 27 17:19:13 2022; Alignement dans les quads Q1 a Q7 + prise de mesures dans les diag en meme temps 2022-10-27-Shift.pdf

Preambule : Le dipole a retrouve aujourd'hui sa valeur ~ 155 (cette valeur de 144 d'hier est incomprehensible ...)

Alignement dans les quads Q1 a Q7 + prise de mesures dans les diag en meme temps --> Le bilan est dans la pj.

Entry   MJ SC;  Screenshot_from_2022-10-27_12-06-10.png

Energie  53.4 MeV

Q1 a Q5 = 0   ;   Idiopole 156.3  ;   STR2V -10    --> Q6 et Q7 correctement alignes (en faisant varier les courant dans  Q6 et Q7 : au YAG on a delta_x ~ 1mm ; delta_y ~ 0 )

 

 

Entry   Entered by Nicolas Delerue from 80.119.21.73 on Thu Oct 27 11:12:17 2022; Programme prise de donnée 28/10 

 

 

===

Program for the shift on 28/10

0) Git pull

1) Start beam

2) Measure respone of TL/SST.2  as function of time

3) Try to put TL/SST2 on negative polarity

4) Study BPM attenuation

 

Entry   MO/SC/MJ; mesure energie impossible (licence) 

MO : Mise en route modulateur et refroidissement

Pas possible de mesurer l energie avec le scipt habituel . Message suivant :

License checkout failed.
License Manager Error -4
Maximum number of users for Image_Toolbox reached.
Try again later.

Troubleshoot this issue by visiting:
https://www.mathworks.com/support/lme/R2018b/4

Diagnostic Information:
Feature: Image_Toolbox
License path:
/data/operateur.thomx/.matlab/R2018b_licenses:/home/debian/R2018B/licenses/license.dat:/home/debian/R2018B/licenses/network.lic
Licensing error: -4,132.

Error in Steerer_Screen_thomx (line 70)
        imageArray=mat2gray(imageArray);

 

Entry   Entered by Super Team from 134.158.195.141 on Wed Oct 26 18:21:31 2022;  Screenshot_from_2022-10-26_18-34-44.png

Prise de mesure pour essayer de quantifier la position des quads TL les un par rapport aux autres. Pas de conclusion pour l'instant.

MAIS : Sceenshot qui montre Idipole=145

L'energie mesuree est 52 MeV ...

Impossible aujourd'hui de passer dans la TL avec Idipole autour de 156 (valeur pourtant habituelle ...)

Entry   Entered by Super Team from 134.158.195.141 on Wed Oct 26 15:27:01 2022;  

SST2 bugue depuis ce matin. Je pensais qu'il n' avait pas de faisceau dessus mais en fait non c'est la camera qui beugue.

SST2 a remarche qq minutes . Je l'ai retire puis remise . Elle ne marche de nouveau plus .

Je ne peux rien faire pour l'instant du programme etude TL prevu aujourd hui

Nicolas tente a distance de la faire fonctionner

Entry   Entered by Super Team from 134.158.195.141 on Wed Oct 26 14:56:19 2022; camera SST2 HS ? Screenshot_from_2022-10-26_15-02-44.png

Parametres de recipe_recipe_LI_TL_RI_20221014_16_44_34.txt mais avec Idipole=144 au lieu de 156.7 ...... (je ne comprends pas cette grosse difference)

Bon et j'essaie de voir qqchose sur la camera SST02 : impossible, elle reste bleue sans jamais rien de visible alors que le faisceau va jusqu a l'entree de l'anneau !

Nicolas peux-tu regrder si ya un truc qui cloche stp. Ca me bloque pour tout .

(les bpm ,3 et 4 sont revenus a la vie eux)