661
|
Thu Jan 5 01:18:58 2023 |
ND, SC, VM, VK | Under Process | Shift summary | Ring |
|
Prise de donnee 5/01 | | 9h15 Mise en chauffe modulateur
9h30 Fin ronde casemate
9h40 Resisivite eau B18: 4.71 |
8x |
|
660
|
Tue Jan 3 17:06:05 2023 |
Entered by Maher OMEICH from 134.158.91.212 on Tue Jan 3 17:05:44 2023 | | Fix | Infra |
|
| | 16h45 Vidange de l'eau fosse nord |
|
|
659
|
Tue Jan 3 09:30:12 2023 |
Vincent Maher Sophie | Fixed | Linac | Linac Commissionning |
|
Demarrage machine | | 8h15
modulateur en local pas possible
de démarrer à distance. |
 |
|
658
|
Mon Jan 2 15:21:11 2023 |
ND/PG/JNC/MO/SC/VC/NE | Under Process | Linac | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique |
|
Redémarrage ThomX | | Bonne Année à tous !
Redémarrage de ThomX
- Mise en route du CC (PG, JNC) |
|
|
657
|
Thu Dec 15 23:59:29 2022 |
ND, Camille Cheney, Mohamed | Under Process | Shift summary | Ring | Ring Commissioning |
|
Prise de donnees 16/12 | | 9h15 Les comptes operateurs etaient restes
allumes avec un message d'erreur indiquant
que la machine n'etait pas totalement |
9x |
|
656
|
Thu Dec 15 13:11:15 2022 |
KD | Under Process | Shift summary | LI | Laser | Linac Commissionning |
|
shift du 15 decembre 2022, entered from 134.158.195.141 | | 12h : intervention casemate sur laser photocathode.
énergie mesurée sur
différents points de fonctionnement |
|
|
655
|
Wed Dec 14 11:55:33 2022 |
HG/CB/KD | | Shift summary | Linac Commissionning |
|
run du 14 décembre 2022 | | Mesure twiss TL
réalignement laser cathode
: position H5.82mm et V3.59mm |
|
|
Draft
|
Tue Dec 13 11:31:17 2022 |
KD, HG | Under Process | Linac | LI | TL | LE |
|
Run Linac | |
Energie laser : 240 µJ en sortie
Laser |
|
|
653
|
Mon Dec 12 16:27:12 2022 |
Entered by Marie Jacquet from 134.158.89.45 on Mon Dec 12 16:26:59 2022 | Not Fixed | Shift summary | Linac Commissionning |
|
Yag Li et TL1 : quid de la calibration ? | | Ci-joint le bilan BPM
et YAG vs steerer d'aujourd'hui (100
pC canon, 100 pC section, iris 1.3, soleno |
|
|
652
|
Mon Dec 12 15:49:21 2022 |
Entered by Marie Jacquet from 134.158.89.45 on Mon Dec 12 15:49:05 2022 | Not Fixed | Shift summary | Linac Commissionning |
|
IHM BPM, "mean" HS ? | | Les "mean" ne semblent plus fonctionner
dans l'IHM bpm. Les cases "mean"
etaient tout le temps a zero ce matin pour |
|
|
651
|
Mon Dec 12 10:26:13 2022 |
SC/MJ | | Shift summary | Linac Commissionning |
|
Linac + TL divers | | Mise en chauffe modulateur et refroidissement
modulateur 1090 - iris 1.3
- phase ch max 142 - energie |
 |
|
650
|
Fri Dec 9 18:26:56 2022 |
MJ HG KD | | Shift summary | Linac Commissionning |
|
LE passee ce soir faisceau sur yag 5 | | On vient passe la LE (dipole dextraction
a commander en local)
recette sauvee |
|
|
649
|
Fri Dec 9 11:07:57 2022 |
Entered by Super Team from 134.158.195.141 on Fri Dec 9 11:07:40 2022 | Under Process | Anneau | Ring |
|
| | Phase Qmax = 138
Phase Emax = 88
energy jitter |
 |
|
648
|
Fri Dec 9 08:24:20 2022 |
KD | Under Process | Shift summary | Ring Commissioning |
|
shift du 9 decembre 2022 | | 8h25 : Mise en chauffe (pression eau toujours
OK)
Intervention casemate : |
|
|
647
|
Thu Dec 8 10:05:38 2022 |
ND, IC, VK, VM, ME | Under Process | Shift summary | Ring | Ring Commissioning |
|
Shift 8/12 | | 9h: Mise en Chauffe modulateur + Frigo
+ Laser
Il n'y a plus de perte de pression |
14x |
|
645
|
Wed Dec 7 16:58:54 2022 |
Entered by Super Team from 134.158.195.142 on Wed Dec 7 16:58:42 2022 | | Shift summary | Linac Commissionning |
|
Linac measurements @ différent modulator voltage settings | |
Modulateur : 1070 V
On se met à la phase de |
|
|
644
|
Wed Dec 7 14:17:55 2022 |
Entered by Marie Jacquet from 134.158.89.45 on Wed Dec 7 14:17:27 2022 | | Linac | Linac Commissionning |
|
realignement 1er doublet de dipole | | Les 2 tetes (tete = partie cote mur) du
premier doublet de dipoles viennent d'etre
legerement "remontees" --> rotation |
|
|
643
|
Wed Dec 7 11:39:22 2022 |
Entered by Marie Jacquet from 134.158.89.45 on Wed Dec 7 11:39:09 2022 | | Shift summary | Linac Commissionning |
|
Dipole extraction : signe du courant a mettre | | Selon les mesures qu'on vient de faire
Hayg et moi : Il faut mettre une intensite
NEGATIVE sur le dipole d'extraction pour |
|
|
642
|
Wed Dec 7 09:07:27 2022 |
KD | Under Process | Shift summary | LI | Linac Commissionning |
|
shift du 7 decembre 2022 | | 9h : Mise en chauffe
ajout d'eau dans la boucle principale
(3 bars --> 4bars) |
|
|
641
|
Tue Dec 6 09:54:56 2022 |
ND, VC | Under Process | Info | Ring |
|
Intervention synchro | | 9:55 Intervention synchro en cours pour
regler l'ajustement de la phase et la
puissandce de la cavite RF. |
|