Goal: Ring BBA

09h14 Unable to start thomx. Need help. Probably problem with cooling water.

12h35 Warm-up the modulator, Chillers started

12h42 Cycling all magnets

12h57 It seems that leds at LI/SST1 and TL/SST1 are ON. icon8.gif. Fix. IHM ==>'Camera Power'==> 'Power 3'

13h42 HV is ON

14h06 Strange situation: the modulator works, but there are no radio frequency signals (see the screenshot).

15h46 Maher fix it. HV is ON

16h16 the modulator works, but there are no radio frequency signals

Need help from Maher to restart the pre-ampli.

16h34 Up to now, the beam was transported only till TL/SST.02. Very often we observed interlock (something happen in the IGLOO ?). After this probably the pre-ampli stopped operating. This is our observation. Moreover, several mistriggers.

For the RF cavity, there is  the problem to set the Voltage. It can be done only manually by Mohamed.

The control of the iris thouth the ELLO com4 does not work. It says "COM4 not available".

Shift program even has not started.

16h54 STOP

 

 

 

 

 

 

  1155   Fri Nov 21 08:02:04 2025 KD MJ DN StudentsUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 21 novembre 2025 

8h: mise en chauffe en remote (modulateur, frigo/chillers, laser, cyclage)
9h: start 
Recette chargée: 50MeV_100pC_MRSV_20251014_18_22_53

10h30: entrée casemate pour CFP

==> mauvais stockage ==> on charge la dernière recette : recipe_recipe_LI_TL_RI_all_20251107_16_22_24

Stockage bon - anneau stable - FPC totalement instable toute la journee

*** Mesure taille X-rays methode fente 1

*** Manip fluo
Spectre calib det Sn foil
Spectre echantillon prostate - feuille Sn sur prostate - X-rays sur support echantillon
Ensuite, spectre idem mais X-rays sur feuille Sn
Ensuite, feuille Sn retiree, spectre sur prostate (on pense ...) - 2 positions faiseau (la 2eme un peu plus centree)

Spectre rouleau fil a souder


 *** Streak : cablage, phases a tuner

- câble refait sur la streak. Prise de donnée sur l'injection du faisceau sur 20 ms, et 1 ms autour de l'injection (avec et sans extraction du faisceau au bout de 10ms)

- reste à affiner la mesure (trig de la streak sur le pulse suivant)

**** Programme TP ****

- mesures rayons-X: fluorescence et mesure taille faisceau "edge methode", radiographie peut être

- mesure streak injection

  1156   Mon Nov 24 13:22:59 2025 ND + JM + HGUnder ProcessShift summaryLI Prise de données 24/11  

9:15 Mise en chauffe

9h30 Arrivée du SPR: testsSSI ce matin => pas de faisceau avant midi => machine off

12h30 Mise en chauffe,cyclage aimants

13h10 Demarrage

Claquage a 1200V.

13h30 Faisceau

ND : ajustement de cameras

Soleno Scan

Mesure emittance @soleno

 

  1157   Tue Nov 25 09:32:03 2025 Entered by Super Team from 134.158.195.141 on Tue Nov 25 09:31:46 2025Under ProcessShift summaryDiag | Ring Commissioning   

09h31 Warm-up ThomX: Modulator, Laser, Fridge

09h36 Chillers were started, cycling all magnets.

09h56 Unable to start MRSV and EL cameras. Need help.

10h33 HV is ON

10h40 HV set to 1215 V

11h24 Beam in the ring W/O RF

11h40 RF 100 kV, phase 3.7  dg. RF Gun phase 210 dg., Sect Att. 2.37 dB, Sect. phase 211 dg., Charges (BPMs) -161, -153, -158, -169 pC, Linac steerers H [0.88 -3.00], V [-2.52 3.08]. Receipt recipe_recipe_LI_TL_RI_good_20251106_16_23_16.txt

12h35 Vacuum interlock V1, restarted

Orbit correction, check with BBA and LOCO after adjusting the device indeces in MML.

16h46 Going to 70 MeV T sect. consigne 28.5ºC, Sect. Att. 0.137 dg., DP 255.8 A, TL/BPM02 X=-1.5 mm, 

As it was discussed before, the dipoles for unknown reasons were set to - 2A from nominal current in the saved receipt. We changed the current to the nominal one. Beam tuning ongoing for 70 MeV.

recipe_recipe_LI_TL_RI_good_20251125_18_31_45.txt W/O correctots in the ring, Manual phase shifter 6129, RF phase 14 dg.

to be continued.

18h40 Stop thomx

  1158   Wed Nov 26 07:47:52 2025 KD MJ VM DN RCUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 26 novembre 2025 

7h50: mise en chauffe à distance (frigo/chiller, laser, modulateur, cyclage)

11h13 Beam is in the ring, 50 MeV, RF gun phase 268 dg. ==> 272 dg., Sect. phase 211 dg., Sect. Att. 2.35 dB. Linac sreerers H [0.74 -2.98], V [-2.56 3.0], Charges (BPMs) -112, -107, -112, -110 pA 

16h: essaye de la recette "Mad180" pour injection dans l'anneau. Impossible car pas de charge transmise sur l'ict3

17h: changement solénoïde 180 --> 230A, on a un peu de charge transmise (70pC pour 100pC). +1A sur QP5 afin d'avoir un faisceau focalisé sur TL/BPM.03. Injection faible possible mais très sensible à la sortie linac (après 2 min plus de charge transmise ==> ligne trop fermée)

*** Spectres a differentes valeurs de bpmTL2_X, et avec la meme orbit a l'IP

bpmTL2 =  0 (~ 11h55)
spectre

bpmTL2 = - 4 (~ 12h00)
spectre
Image fente 1 ==> Taille source X : X = 310 , Y = 51 

bpmTL2 = - 2 (~ 12h17)
spectre
Image fente 1 ==> Taille source X : X = 179 , Y = 45 

bpmTL2 =  0 (~ 12h24)
spectre
Image fente 1 ==> Taille source X : X = 201 , Y = 58

bpmTL2 = + 4 (~ 12h35)
spectre
Image fente 1 ==> Taille source X : X = 170 , Y = 67

bpmTL2 = + 2 (~ 12h45)
spectre
Image fente 1 ==> Taille source X : X = 268 , Y = 62

bpmTL2 = 0 (~ 12h53)
spectre
Image fente 1 ==> Taille source X : X = 234 , Y = 53

 

** Spectre pris a differentes positions de detecteur

 

** Mesures avec diode calibree

~ 13h56 : diode alignee dans le faisceau (au centre, a la louche) - Fente2 : H = + 2 , V = - 11

Quelques deplacements dans le faisceau :
   fente2 : H = + 2 ;  V = - 11 ( ~ 14h55)
   fente2 : H = + 2 ;  V = - 21 ( ~ 15h01)
   fente2 : H = + 10 ; V = - 21 ( ~ 15h05)
   fente2 : H = - 10 ;  V = - 21 ( ~ 15h07)

** Mesures longeur de paquet et injection

- Comparaison en fonction de la qualité du stockage:

   * mesure de la longueur pour l'anneau non optimisé (après dérive), il y a des oscillations synchrotrons (~4mm pic-pic), le stockage est pas stable

   * mesure de la longueur une fois l'anneau réoptimisé (énergie + 3° cavité RF)

- Comparaison taille faisceau VS amplitude cavité RF 

==> pas d'effet visible du FBL (il faut peut être l'ajuster)

=====================================================================

Programme du jour : Spectres a differentes positon bpmTL2_X, avec meme orbite a l'IP

 

  1159   Thu Nov 27 08:01:20 2025 KDUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 27 novembre 2025 

8h: mise en chauffe à distance (modulateur, frigo/chiller, laser, cyclage)

9h30: Chargement de la recette : "recipe_recipe_LI_TL_RI_all_20251126_09_35_14.txt" pour référence

ajustement energie linac et phase cavité RF pour réduire l'oscillation synchrotron.

10h43: prise de référence, dispersion -3cm

10h50: recette dispersion Viktor V1, dispersion -7.3cm

10h55: recette dispersion Viktor V2, dispersion +10.3cm

11h: essaie recette Julien, pas de charge transmise sur ict3. Faisceau très défocalisé et ligne trop fermée (très sensible aux petites variations pointé, énergie etc.)

11h30: essaie recette référence avec feedback injection ring

11h50: recette dispersion Viktor V3, dispersion -9.5cm

12h: effet stockage sur faisceau,

   1) le faisceau est stocké avec la recette de référence, optimisé avec la phase cavité RF et l'energie ==> faible oscillation synchrotron mais stockage instable (grosses pertes en fin de stockage)

   2) le faisceau est optimisé pour augmenté la qualité du stockage. Faible jitter d'injection et stockage stable (sans perte) mais grosses oscillations synchrotron

Les deux mesures de longueur de paquet montre qu'un mauvais stockage peut permettre d'avoir un meilleur faisceau en longitidinale alors qu'un bon stockage peu vite dégrader le faisceau. QUESTION: est ce uniquement en lien avec l'oscillation synchrotron ? Est ce que le fait que le faisceau soit vite dégradé améliore la stabilité du stockage ?

 

===> Au final il ne semble pas y avoir un fort impact sur les jitters en fonction des différents points de dispersion. Le point à 11h30, est le point de référence refait avec le feedback d'injection anneau, il semble moins bon.

Sur l'image le point marque la valeur moyenne et la barre d'erreur l'écart type des 100 mesures (jitter), pour BPM.02-LIB.03 (BPM1) et BPM.04-LIB.03 (BPM3)

 

*** Mesures faites pour chaque points ***

- mean / std, de 100 acquisitions des positions BPM X et Y (des 12 BPM de l'anneau) pour le numéro  buffer (0, 14, 100, 500, 1000, 1999)

- Archivage mesure le stockage et autre donnée

- image de l'orbite en comparaison avec la référence

- image oscillations synchrotron

- image TBTsum 

 

 

 

 

*** Programme ***

Injection stability en fonction de la dispersion 100 pC :

Quantify injector stability vs. TL dispersion

Goal: Understand and minimize the shot-to-shot jitter at ring injection by tuning TL dispersion.

Workflow:

Vary dispersion in the TL in a controlled way (use > 5 optics settings).

For each dispersion setting:

  • Measure horizontal and vertical jitter in the ring (turn-by-turn).
  • Record injected charge, storage efficiency and orbit offset at injection.

Try to match TL dispersion to ring dispersion at injection and identify the setting that minimizes jitter.

Summarise the best TL dispersion setting and assign it as standard optics.

Deliverables:

Jitter vs. TL dispersion curves.

TL optics for minimum jitter.

Beam time: ~2 shifts.

 

 

*** après midi ***

- problème RI-C1 QP.05, problème : electrodes désoudées ==> ressoudées avec Jean-Noel.

- immersion recherche : quelques images de radiofraphie (portable, carte banquaire, baume à lèvre) ==> cavité extrèmement instable !

17h45 : Stop ThomX

  1163   Fri Dec 5 08:31:59 2025 Entered by Super Team from 134.158.195.141 on Fri Dec 5 08:31:45 2025Under ProcessShift summaryRing Commissioning   

08h31 Warm-up ThomX: Modulator, Laser, Fridge

08h36 Chillers were started, cycling all magnets.

10h07 HV is ON

10h09 HV set to 1215 V

10h330 Beam is in the ring 70 MeV

  1165   Tue Dec 9 08:00:00 2025 KD MJ RC DNUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 09 décembre 2025 - 70 MeV et 40 MeV 

8h : mise en chauffe en remote (modulateur, cyclage, frigo/chillers, laser)

Stockage 70MeV ok, le faisceau  MRSV semble gros en horizontal (cavité RF 250kV)

e-:

attenuateur section : 0.18dB

phase section : 252°

chiller: 28.4°C

Freq: 500.03165 MHz

phase shifter manuel : 4870

longueur paquet ~ 40ps 

cavité FP:

TZ: -1.75mm

phases 33MHz : [synchro, CFP] = [184° 343.5°]

phase 500MHz : 9.1V (negative)

 

17h: passage à 40MeV, steerer anneau à 0

e-:

attenuateur section : 3.77dB

phase section : 214°

chiller: 28.4°C

Freq: 500.11851 MHz

phase shifter manuel : 8600

longueur paquet pas assez de MRSV pour la mesure

cavité FP:

TZ: -1.75mm

phases 33MHz : [synchro, CFP] = [184° 300.6°]

phase 500MHz : 4.2V (positive)

=========================================

X-rays :

** 70 MeV
Scan vertical FPC + Mesure taille source avec fente 1
Prises de spectres + calib feuille Pb et Au

** 40 MeV 
Prise de spectres + calib feuille Sn

  1166   Wed Dec 10 10:45:33 2025 Entered by Super Team from 134.158.195.141 on Wed Dec 10 10:45:16 2025Under ProcessShift summaryLinac Commissionning   

8h30 : machine started on remote
50 MeV operation.
Problem with Yag-TL camera
--> try power off
Worked cool
Ajusterment retard camera : -20 µs / Gain 0 / exp 0.001s

Viktor : dispersion measurement.

Q-scan QP7, QP3

 

  1167   Thu Dec 11 08:38:30 2025 VM, ICUnder ProcessShift summaryDiag | Ring Commissioning 40 MeV operation 

8h37 Warm-up ThomX: Modulator, Laser, Fridge

8h44 Chillers were started, cycling all magnets.

9h49 HV is ON

9h59 Can not see beam charge and cameras

10h37 Cameras are OK, ISTs are not.

10h38 Beam is in the ring at 50 MeV, all seems OK. Transition to 40 MeV

10h52 receipt from recipe_recipe_LI_TL_RI_all_20251209_17_54_51.txt

RF Gun phase  241 dg., Sect. phase 200 dg. Sect. Att. 3.82 dB, Linac steerers: H [0.87 -3.27], V [-3.0 3.63], Charges (BPMs):  -111, -107, -107, -104, 98 pC

11h03 Beam is in the ring

Orbit correction. Optimization of the beam. The beam size at MRSV is about ~25 pixels.

The orbit is correction with a reasonable beam storage. (see the screenshot).

A short run wiht the X-rays thanks to Ronic.

The beam is very unstable. To minimize the syncrotron oscilations it is often neseccary to adjust RF cavity phase, sect. Att. value end section phase

14h15 HV on standby

16h18 HV is ON

17h10 Stop ThomX

  1168   Fri Dec 12 08:40:50 2025 VM, ICUnder ProcessShift summaryRing Commissioning Check of the 70 MeV with MRSV, Ring studies 

08h40 Warm-up ThomX: Modulator, Laser, Fridge

8h45 Chillers were started, cycling all magnets.

10h10 HV is ON

10h14 Going to 70 MeV

10h44 Beam is in the ring W/O RF, 70 MeV

Manual ring shifter set to 6124 RF 50 kV

11h56 Ring RF set to 100 kV RF phase 17.5 dg.

13h34 Good receipt  recipe_recipe_LI_TL_RI_good_20251212_13_56_38.txt copied to references as 70_MeV_Vert_tune 0.66_good_20251212_13_56_38.txt

Rf gun phase 239 dg., Sect. Att. 0.18 dB, Phase 243 dg., TL/BPM2 X=-1mm,  linac correctors H [1.0 -3.32], V [-2.02 2.10], Charges: -85, -81, -82, 84, -82 pA, Laser Att.  281.

MRSV fills the all slit. Storage up to 100%

14h10 ==> 50 MeV Manual phase shifter value set to 4876. Sect. temperatute set to 30C (clarinette, consigne = 29.2C).

14h39 Beam is in the ring.

14h40 HV on standby, Cycling all magnets.

15h08 HV is ON Receipt: recipe_recipe_LI_TL_RI_good_20251125_16_42_01.txt. Copied to references: 50_MeV_good_tune_0.17_0.7_20251212_16_03_54.txt

MRSV size at 50 MeV down to 23 pix.

Studies Model_real Machine for the ring. Data to be analyzed.

17h07 Stop ThomX

 

 

 

 

  1169   Mon Dec 15 08:06:26 2025 KD MJUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 15 décembre 2025 

8h: mise en chauffe en remote (chiller/frigo, laser, modulateur, cyclage)

* cannot enter to the ring with the recipe "40_MeV_Enough_Good_20251211_14_07_28", probably due to mis alignment procedure of the QP1-QP3.
* reset de TL steerers with the recipe "40MeV_20250401_15_09_50", first turn ok but no storage.
* steerers Ring to 0.

12h --> back to previous cathod point (last week tuning was done at that position)

  • TEST/HL/ThomX_PhotoCathode/Horizontal_Iris_Position_set : <type 'float'> : 4.714
  • TEST/HL/ThomX_PhotoCathode/Vertical_Iris_Position_set : <type 'float'> : 3.524

17h: essaie avec la recette initial de mardi "recipe_recipe_LI_TL_RI_all_20251209_17_54_51.txt"

==> difficile de retouver le TBTsum de mardi, ==> après quelques ajustements (rcds, etc). on retrouve quelques choses de passable

==> MRSV totalement différent: long, étalé et pas au même endroit (à droite au lieu d'être hors écran à gauche)

==> problème de répétabilité. La seule différence est la température de la section. 

 

*** Scan FPC table (~16h) - A l'oeil FWHM ~ 300 microns ==> rms ~ 128 ==> sig_ele_Vert ~ 107 ==> sig_Source_Vert ~ 60 microns

Bilan imagerie du jour :
tres bas flux et faisceau tres instable .==>  Pas de contraste de phase visible. On espere que demain sera mieux ! 

======================================================================================================

*** programme ***

Mesure imagerie X à basse énergie (40MeV)

 

  1170   Tue Dec 16 07:18:46 2025 KD, IC, RC,VM Under ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 16 décembre 2025 

7h10: mise en chauffe en remote (chiller/frigo, laser, cyclage, modulateur).

à cause du faible flux d'hier et de la non répétabilité des recettes de la semaine précédente :

* essaie avec la section à 28.4°C (seule condition différente de mardi dernier)

8h10: démarrage. 

chargement de la recette du "recipe_recipe_LI_TL_RI_all_20251209_17_54_51.txt", rien sur la caméra sst, on retrouve les paramètres de mardi (3.74dB, 210°C phase section)

image SST vraiment décalé ==> quelques chose à bougé sur la machine ? ==> réalignement quads

** après réalignement et ajustement (phase + atténuateur) 

 

e-:

attenuateur section : 3.77dB

phase section : 214°

chiller: 28.4°C

Freq: 500.11851 MHz

phase shifter manuel : 8600

longueur paquet pas assez de MRSV pour la mesure

10h43 Results: T_sect. 30dg.C (consigne 29.2), laser spot position: 4.714 H, 3.524 V; starting from the receipt recipe_recipe_LI_TL_RI_all_20251211_14_07_28.txt

RF gun phase 222 dg., Sect. Att. 3.987, phase 197 dg. TL/BPM02 X= +2 mm, Linac steerers: H [0.97 -3.6], V [-3.0 3.9], Charges (BPMs): -115, -109, -112, -112, -112 pC, 

Beam in the ring after RCDS on TL RF 100 kV, phase 9.0 dg. MRSV 27 pix, (sometime 22 pix). RCDS on ring V cor. X I3+I4 up to 12000 pA but with vertical step at IP ( recipe_recipe_LI_TL_RI_all_20251216_10_41_50.txt)

10h58 Went to the receipt recipe_recipe_LI_TL_RI_all_20251216_10_09_21.txt to have more flat vertical orbit (4000 pA after FPC table scan)

QUAD cycling

11h30 We reoptimized the vertical orbit to have smaller angle. I3+I4 ~7-8 kpA Receipt: recipe_recipe_LI_TL_RI_all_20251216_11_29_31.txt (MRSV 24 - 26 pix, Hor. tune 0.2 at maximum flux)

18h20 Laser Att ==>297 ,charges:-159,-152,-157,-156,-155 pC, Solenoid 225 A, Sum of TbTsum 2e11, from 15e11, MRSV 35.8 pix, I3+I4 about 8000, then FPC desynchronized.

18h43 Stop ThomX

  Draft   Wed Dec 17 07:17:06 2025 KD, IC, MV, DN,Under ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 17 décembre 2025 

7h15: mise en chauffe en remote (chiller/frigo, laser, modulateur, cyclage)

8h33 HV ON

09h30 Beam is in the ring 40 MeV, RF 100 kV ==> 150 kV I3+I4 up to 14000 pA. Vertical step at IP from -2 mm to +2 mm. MRSW 24.5 pix. Receipt  recipe_recipe_LI_TL_RI_all_20251217_09_17_49.txt

10h19 Hor. tune 0.177, sum of TbTsum 2e11. TL/BPM02 X=+3 mm, RF cavity phase 5 dg. Sect Att. 3.967 dB, Sect. phase 197 dg. RF gun phase 222 dg. Charges: -165, -157, -159, -161, -158 pA Laser Att. 300, Sol. 223 A

 

 

*** Programme ***

* faire 1 à 2 tomographie à 40 Mev avant de passer aux manips à 70MeV (besoin de flux pour la rapidité d'acquisition)

* passage à 70MeV, mesure de dosimétrie et spectre angulaire

  1173   Fri Dec 19 07:22:31 2025 KDUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 19 décembre 2025 

7h20: mise en chauffe en remote (frigo/chiller, laser, modulateur, cyclage)

 

*** Programme ***

- dernière demie-journée de mesures. Mesure de dosimétrie (dose transverse)

- autres ?

  1175   Tue Jan 6 08:00:18 2026 KDUnder ProcessShift summaryLinac Commissionning shift du 06 janvier 2026 

8h: mise en chauffe en remote (cyclage, modulateur, frigo/chillers, laser)

problème lancement cyclage RI-C1: QP.04, QP.09 et QP.10

Sole 238
Scan_QP0118h27.txt :

  E Sigma norm_emit emit beta alpha gamma error plane QP Q_LI Q_TL
0 50 [[0.14313799542146532, 0.06033515695599282, 0.... 3.096494 0.031648 22.187073 -5.072226 1.204642 False Y QP1 96.810661

136.501018

E Sigma norm_emit emit beta alpha gamma error plane QP Q_LI Q_TL
0 50 [[0.2899399170657115, 0.19572917921414953, 0.1... 1.749609 0.017882 17.973956 -3.768844 0.845901 False X QP1 109.374139

137.033452

recette pour les quads : /tmp_mnt/data/shared/recipes/saved/Studies_BMAD_Sole_Bunch/recipe_recipe_TL_Sole238_all_20260106_18_11_32.txt 

Solé 242A:

  E Sigma norm_emit emit beta alpha gamma error plane QP Q_LI Q_TL
0 50 [[0.6426336031073789, 0.40883800851193447, 0.2... 1.121272 0.01146 78.079217 -13.863508 2.47437 False X QP1 107.263568 134.6379
E Sigma norm_emit emit beta alpha gamma error plane QP Q_LI Q_TL
0 50 [[0.7928102298373866, 0.3730560287510153, 0.11... 6.338747 0.064785 43.69964 -8.519464 1.683796 False Y QP1 107.52352 128.368469

recette :  /tmp_mnt/data/shared/recipes/saved/Studies_BMAD_Sole_Bunch/recipe_recipe_TL_Sole242_all_20260106_19_08_32.txt

 

en PJ : images à QP7 pour les 2 recettes

  1176   Wed Jan 7 07:55:45 2026 VM DN MJ KDUnder ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning shift du 07 janvier 2026 

7h55: mise en chauffe en remote (modulateur, frigo/chillers, laser, cyclage)
11h25 HV is ON

Archivage lance

** 11h43 Receipt Ref. from  50_MeV_good_tune_0.17_0.7_20251212_16_03_54.txt.  Beam is in the ring W/O RF

RF gun phase  236 dg., Sect. Att. 2.37 dB, phase 215 dg. Linac steerers: H [0.68 -2.82], V [-2.42 3.05]

12h04 RF 100 kV, phase 12.5 dg. Good storage, screenshots. Charges (BPMs): -114, -112, -115 -115 -113 pA, Tune H: 0.17, V: 0.7, MRSV size: V 14.7 pix, H 27.7 pix

BPM.05-lib.04 Sum of tbtsum is 1.5e11

13h03 RF gun phase 242 dg., Sect. phase 216 dg.
13h32 RFgun phase ==> 247 dg.
13h40 Sect. phase ==> 219 dg. RF 14 dg.
13h59 RFgun phase ==> 249 dg.
13h40 Sect. phase ==> 218 dg. 

** 14h05 Receipt recipe_recipe_TL_Sole242_all_20260106_19_08_32.txt loaded. Ring charge was killed (at injection). Trying to recuperate

14h30 after RCDS on injection ring charge about the same. Synchrotron osc. minimized. tuns the sames, but MRSV is totaly different with two picks

** 15h39 Dispersion measurement using SST3 for 242 A BMAD and old recipes

** ~ 15h45 After loading the 242 A BMAD receipt, adjusting DPI and Sept. to suppress beta oscillations resulted in improved MRSV (h 27.1 pix, v 15 pix).

** 16h15 recipe_recipe_TL_Sole238_all_20260106_18_11_32.txt loaded. RCDS on injection.

It is enough good. MRSV size from 28 to 21 pix hor.

*** Plusieurs images of beam length streak enregistrees pour les 3 recettes (ref_recipe, sol242, sol238)
Rien de conculant a l'oeil (avec les 2 recettes Soleno, dans la 1ere ms le faisceau s'allonge toujours, d'un facteur en gros 2, mais a quantifier) - Images a traiter proprement (repertoire 20260107)

*** Cavite FP remise en etat : realignee, 90 kW stocke, frequence passee de 70 MeV a 50 MeV ==> prete pour jeudi et vendredi

17h30 Stop ThomX

=============================================

*** A faire avec les 2 recettes sol 242 et sol 238 : produire des X et mesurer
         - Trend de flux
         - Scan vertical FPC taille electrons
         - Taille de source X a l'IP avec les fentes 1 + camera photonic

*** Rappel these A. Gramelin FIGURE 6.16 :
           For 100 pC, during the 1st milisecond of storage :
                 -  Bunch length increases by a factor 2 - 3
                 -  Emittance X and Y increase by a factor ~ 0.2 - 0.3

 

 

  1177   Thu Jan 8 09:07:08 2026 IC, HG, RC, DN, JMUnder ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning Test of the new receipt from BMAD Isol = 242 A 

8h55: mise en chauffe (modulateur, frigo/chillers, laser, cyclage)

10h20 HV ON

Start with the receipt nominal.  problem with the RF gun laser camera. Solved.

Going to the new receipt for Isol = 242 A

Tuning injection. Good storage.

We performed sveral scans with FPC. The measured vert beam siwe is about 82 um. The best X-ray fluc I3+I4 was about 30-40 kpA.

The size at MRSv hor/vert is about 15/19 pixels

Starting from a certain moment, the trig to trig injection stability changed. See the screenshot. This to be understood.

Going to nominal receipt. After the tuning of the injection, the good storage is obtained. Size at MRSV 15/24 pixels

measurements of the dispersion and LOCO studies. First without sextupoles and later with. To be continued.

Going back to new receipt Isol = 242 A. Storage is bad. Retuning of the TL and injeciton. Good storage is obtained with good tunes 0.17/0.7.

Studies with X-rays will be continued tomorrow.

dispersion and beta function measurement as tunes are seems to be quite stable

Switching on the streak camera.

Phases during the day:

RF Gun: 296; 229; 242

RF section: 218; 209; 218


 

  1178   Fri Jan 9 08:05:32 2026 KD, IC, VM, RCUnder ProcessShift summaryRF D1 | Linac Commissionning | Ring Commissioning shift du 9 janvier 2026 

8h05: mise en chauffe en remote (modulateur, frigo/chillers, laser, cyclage)

09h06 HV is ON

10h10 receipt recipe_recipe_LI_TL_RI_all_20260108_17_34_30.txt (242 A BMAD). RF gun phase 226 dg. Sect Att. 2.457 dB, sect. phase 214 dg. Laser att. 319 Charges: -127, -122, -127, -124 pC 

RF 100 kV, phase -7.5 dg, manual phase shifter 4497. TL/BPM02 x=-3 mm 

10h20 after the PSS interloc the modulator is running, but there is no any RF 

10h35 Kevin fixed it. HV is on 

11h37 receipt recipe_recipe_LI_TL_RI_all_20260107_17_19_00.txt loaded for Sol. 238 A BMAD

RCDS on injection receipt saved recipe_recipe_LI_TL_RI_all_20260109_11_52_26.txt

13h 41 Go to 242 A to measure the spectrum

The beam blow up is visible.

Optimization of the ring to find anther working point Tunes  0.145/0.7. The beam storage seems more stable, small MRSV 15/21 pixels New receipt: recipe_recipe_LI_TL_RI_all_20260109_14_44_42.txt

15h14 change to npminam point Isol = 230 A Optimization of the injection. MRSV 15/22 pixels

Measurement of the spectrum

15h40 optimization of the injector

Good storage and MRSV beam size is restored. X- ray flux is about 20 kpA

At every point the streak camera data is saved.

Taking the spectra

 

*** Results (all files in data shared, streak, PhotonicScience, spectrum) ***

An error was made during the source size measurement of the usual working point (230A), no beam size available for that recipe (from previous measurement e- [H,V] = [180, 120], to be confirmed)

--- Bunch length (cf. curve)

The preliminary analysis show that the bunch length seems to not be affected by the recipe used. The 230A recipe show a longer bunch but it is not very significatif due to the machine stability.

--- bunch size

242A (in the morning) : e- [H,V] = [141 um, 56 um]

242A (in the afternoon) : e- [H,V] = [154 um, 58 um] (same as in the morning)

242A after optimization : e- [H,V] = [107 um, 62 um]

238A : e- [H,V] = [161 um, 92 um]

--- Spectrum ==> divergence : to be done

  1179   Mon Jan 12 13:51:05 2026 HaygUnder ProcessInfoLI | TL Monday Shift : Q-scan + Data (Active Learning) icon1.gif 

Mesures du jour : 

  • Quad scans à QP1 pour voir d'autres points de fonctionnement avec une matcihing anneau correct (Figure de merite <1 ?)
    • autres points Solé
    • autres points Q > 100pC (jusqu'à 300pC)  
  • Active learning pour données TL jusqu'à TLSST3 inclus.  

Attenuation laser : 320 pour pour avoir 100 pC @ Emax

Alignement Quads + minimisation disp E ok 
no 14h40 : Laser s'est arreté ... le Ds s'est mis en fault --> soucis de liquide de refroidissement
--> intervention de kevin 

crying 18h04: plus de trig (Synchro? ) --> trigger ne clignotte plus 

18h20 : Stop ThomX

 

 