  Toutes les notes concernant les Commissionning de ThomX, Page 26 of 63  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   Entered by Super Team from 134.158.195.141 on Wed May 11 18:32:20 2022; Run machine : JNC/HG 2022-05-11_18_45_12_li_op_las_02_log_scale_False_despeckle_False_min_scale_0_max_scale_350.png2022-05-11_18_51_09_li_op_las_02_log_scale_False_despeckle_False_min_scale_0_max_scale_350.png2022-05-11_19_01_22_li_op_las_02_Iris1.5mm_log_scale_False_despeckle_False_min_scale_0_max_scale_300.pngScreenshot_from_2022-05-11_21-15-19.pngScan_pos_phase_LIL__at_11-05-2022__21-34-50.png
Entry   Entered by Super Team from 134.158.195.141 on Thu Dec 2 14:54:39 2021; Run Linac alignement  2021-12-02_14_59_31_li_op_las_02_log_scale_False_despeckle_False_min_scale_0_max_scale_25.pngcharge_phase__at_02-12-2021__15-32-58.jpg
Entry   Entered by Super Team from 134.158.195.141 on Wed Dec 8 15:10:57 2021; Run Linac alignement laser_8Dec_16h40.pngRedpitaya_08Dec.png
Entry   KD, HG; Run Linac  
Entry   IC, VM; Ring working point studies 
Entry   IC, VK, VM, ND; Ring studies, MRSV 36x
Entry   IC; Ring studies Screenshot_from_2026-01-15_11-04-16.pngScreenshot_from_2026-01-15_11-33-33.pngRi_C1_Quads_is_off_Screenshot_from_2026-01-15_18-19-14.pngScreenshot_from_2026-01-15_16-42-27.pngScreenshot_from_2026-01-15_17-36-28after1LOCO.png
Entry   IC, VM; Ring studies 
Entry   IC; Ring studies 
Entry   Entered by Super Team from 127.0.0.1 on Wed Mar 25 07:28:09 2026; Ring studies 
Entry   LS, ND, IC, VK; Ring operation 16/5 health_check_2023_05_16_12_02.pngscan_charge_phase_min_0.0_max_360.0_12_8_7.png2023-05-16_12_13_52_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_100.pngring_storage_quality__2023_05_16_16_06.png
Entry   ND, LS, IC, VK, VM, SW; Ring operation 15/5 7x
Entry   VK, VM, IC, KD; Ring commissioning 7x
Entry   Ring team; Ring Working Points 50 MeV/ 61.5 MeV / 70 MeV 8x
Entry   VM, IC; Ring BLM and charge linearity 6x
icon1.gif   Entered by Hayg Guler from 134.158.195.141 on Tue Nov 9 18:30:22 2021; Resumé du jour  
Entry   Entered by Sophie Chance from 134.158.195.142 on Thu Jun 10 17:40:23 2021; Resume shift 100621 
Entry   Entered by Marie Jacquet from 134.158.89.45 on Thu Jan 16 11:57:39 2025; Resultats Tour de cle Q1-Q3 - Shift 15/01 Tour_de_cle_Q1Q3.png
Entry   Entered by Super Team from 134.158.195.141 on Thu Nov 2 16:51:56 2023; Restauration Base de donnée TANGO 
Entry   VK, VM, IC, LS; Restart storage in the Ring 