IC,VM;
|
8h10 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
09h12 HV is ON
recipe_recipe_TL_all_20260408_17_18_54.txt loaded |
IC,VM;
|
7h40 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
08h43 HV is ON
recipe_recipe_LI_TL_RI_all_20260409_17_07_05.txt loaded |
IC,VM; Beam studies. preparation for 40 MeV
|
8h00 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
10h Problem with modulator; It went to OFF and it does not start. Need help;
12h40 Fixed by Maher |
IC,VM;
|
Dalkia solved the problem with vooling circuit in the morning
10h15 mise en chauffe (frigo/chillers, modulateur, laser, cyclage)
11h16 HV is ON |
IC, VM, VK, ND; RIng commissioning 10x
|
8:50 Mise en chauffe
10h Starting the beam
Tuning of the TL |
IC, VM, VK, AL, JH; Optimization of the ring 6x
|
Start of the modulator at 9h45
11h30 Problem with water regulation. Probably falseread of GUN PT100. Hayg and Viktor is tryig to adjust manually the temperature of the chiller
for RF gun. We stopped at the settings as attached. |
IC, VM, VK; Restart and tuning of the injector
|
10h Intervention to repair the water leakage. It was repaired.
New problem with vacuum pomp is found in the ring. The two problems are due to the water leakage. Intervention is ongoing.
12h Warm up of the machine |
IC, VM, VK; X-ray generation  
|
8h50 Warming up the machine
10h start the beam
Tuning the injector |
IC, VM, ND, VK; Prise de donnee 10/3/2023 7x
|
9h20 Start modulator, cycle magnets
10h20 Intevention Vincent sur PA
10h40 Scan charge phase |
IC, VM, ND;    
|
08h29 Warm-up ThomX: Modulator, Laser, Fridge
Chillers were started, cycling all magnets.
10h48 Beam is in the ring after resolving a lot of problems. The receipt loaded: recipe_recipe_LI_TL_RI_all_20260115_18_10_34.txt, with Linac-Tl |
IC, VM, DN, MJ;    
|
7h37 : mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)
08h57 HV is ON
==> 70 MeV, F=500.031645 MHz |
IC, VM; BBA
|
| 08h50 Warm up of the modulator |
IC, VM; BBA  
|
8h50 Thomx warmup
10h20 HV is 'ON'
RF Gun phase is 254 dg. Sect phase is 243 dg. Sect. Att. 0.119 dB, Charges: -112 pC, -113. pC, -140 pC. Linac steeres: H [1.00 -3.49], V[1.92 |
IC, VM; Beam studies
|
7h45: mise en chauffe en remote (modulateur, laser, frigo/chillers)
08h41 HV is on
08h49 RF gun phase 152 dg., sect phase 208 dg. beam is in the ring W/O RF |
IC, VM; Ring studies
|
7h45: mise en chauffe en remote (modulateur, cyclage, laser, frigo/chillers)
08h43 HV is on
RF gun phase (laser phase) for maximum charge is out of the range, close to 360 dg. or 10 dg. Help is needed! |
IC, VM;  
|
7h50: mise en chauffe en remote (chillers/frigo, modulateur, cyclage)
08h57 HV is on
09h22 Beam is in the ring W/O RF, recipe_recipe_LI_TL_RI_all_20260219_13_17_17.txt loaded |
IC, VM;
|
08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
09h19 HV is on |
IC, VM; , entered from 127.0.0.1
|
07h55: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
09h00 HV is on
09h35 recipe_recipe_LI_TL_RI_all_20260226_14_47_33.txt loaded. Beam is in the ring, RF cav. 100 kV, phase 32 dg., F=500.108655MHz |
IC, VM; Work on orbit at 70 MeV for X rays    
|
7h20: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
08h55 HV is ON
10h07 70 MeV. Beam is in the ring with RF 100 kV, phase -37.5 dg. The recipe_recipe_LI_TL_RI_good_20260318_16_17_14.txt loaded, linac steerers |
IC, VM;
|
| 9h00 : mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage) |
|