  Toutes les notes concernant les Commissionning de ThomX, Page 25 of 63  Not logged in ThomX    logo
Entry   IC,VM;  
8h10 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

09h12 HV is ON

recipe_recipe_TL_all_20260408_17_18_54.txt loaded
Entry   IC,VM;  
7h40 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

08h43 HV is ON

recipe_recipe_LI_TL_RI_all_20260409_17_07_05.txt loaded
Entry   IC,VM; Beam studies. preparation for 40 MeV 
8h00 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

10h Problem with modulator; It went to OFF and it does not start. Need help;

12h40 Fixed by Maher
Entry   IC,VM;  
Dalkia solved the problem with vooling circuit in the morning

10h15 mise en chauffe  (frigo/chillers, modulateur, laser, cyclage)

11h16 HV is ON
Entry   IC, VM, VK, ND; RIng commissioning 10x
8:50 Mise en chauffe

10h Starting the beam

Tuning of the TL
Entry   IC, VM, VK, AL, JH; Optimization of the ring 6x
Start of the modulator at 9h45

11h30 Problem with water regulation. Probably falseread of GUN PT100. Hayg and Viktor is tryig to adjust manually the temperature of the chiller
for RF gun. We stopped at the settings as attached.
Entry   IC, VM, VK; Restart and tuning of the injector Screenshot_from_2024-03-05_15-13-48.png
10h Intervention to repair the water leakage. It was repaired.

New problem with vacuum pomp is found in the ring. The two problems are due to the water leakage. Intervention is ongoing.

12h Warm up of the machine
Entry   IC, VM, VK; X-ray generation Screenshot_from_2024-03-06_10-56-53.pngScreenshot_from_2024-03-06_17-18-12.pngScreenshot_from_2024-03-06_15-08-24.png
8h50 Warming up the machine

10h start the beam

Tuning the injector
Entry   IC, VM, ND, VK; Prise de donnee 10/3/2023 7x
9h20 Start modulator, cycle magnets

10h20 Intevention Vincent sur PA

10h40 Scan charge phase
Entry   IC, VM, ND;  Screenshot_from_2026-01-16_18-28-24.pngScreenshot_from_2026-01-16_13-22-12.pngScreenshot_from_2026-01-16_13-23-01.pngScreenshot_from_2026-01-16_13-31-16MODEl.pngScreenshot_from_2026-01-16_16-02-15LOCO_1it.png
08h29 Warm-up ThomX: Modulator, Laser, Fridge
Chillers were started, cycling all magnets.

10h48 Beam is in the ring after resolving a lot of problems. The receipt loaded: recipe_recipe_LI_TL_RI_all_20260115_18_10_34.txt, with Linac-Tl
Entry   IC, VM, DN, MJ;  MRSV_Size_vs_LaserPhase.pngHorOrbit_vs_LaserPhase.pngMRSV17h38.pngDispersionAfterLOCO20260326_16h54.png20260326_18h24_TL_Dispersion.png
7h37 : mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)

08h57 HV is ON

==> 70 MeV, F=500.031645 MHz
Entry   IC, VM; BBA 
08h50 Warm up of the modulator
Entry   IC, VM; BBA Screenshot_from_2025-09-11_12-57-22.pngScreenshot_from_2025-09-11_17-36-53.pngScreenshot_from_2025-09-11_17-47-30.png
8h50 Thomx warmup

10h20 HV is 'ON'

RF Gun phase is 254 dg. Sect phase is 243 dg. Sect. Att. 0.119 dB, Charges: -112 pC, -113. pC, -140 pC. Linac steeres: H [1.00 -3.49], V[1.92
Entry   IC, VM; Beam studies 
7h45: mise en chauffe en remote (modulateur, laser, frigo/chillers)

08h41 HV is on

08h49 RF gun phase 152 dg., sect phase 208 dg. beam is in the ring W/O RF
Entry   IC, VM; Ring studies 
7h45: mise en chauffe en remote (modulateur, cyclage, laser, frigo/chillers)

08h43 HV is on

RF gun phase (laser phase) for maximum charge is out of the range, close to 360 dg. or 10 dg. Help is needed! 
Entry   IC, VM;  Screenshot_from_2026-02-20_16-34-18.pngScreenshot_from_2026-02-20_16-15-37.pngScreenshot_from_2026-02-20_12-00-27.png
7h50: mise en chauffe en remote (chillers/frigo, modulateur, cyclage)

08h57 HV is on

09h22 Beam is in the ring W/O RF, recipe_recipe_LI_TL_RI_all_20260219_13_17_17.txt loaded
Entry   IC, VM;  
08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

09h19 HV is on
Entry   IC, VM; , entered from 127.0.0.1 Screenshot_from_2026-02-27_10-25-37.png
07h55: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

09h00 HV is on

09h35 recipe_recipe_LI_TL_RI_all_20260226_14_47_33.txt loaded. Beam is in the ring, RF cav. 100 kV, phase 32 dg., F=500.108655MHz
Entry   IC, VM; Work on orbit at 70 MeV for X rays xorbit70MeV_Xrays_20032026.pngyorbit70MeV_Xrays_20032026.pngScreenshot_from_2026-03-20_15-49-43.pngY_orbit61.5MeV4Xrays.pngX_orbit61.5MeV4Xrays.png
7h20: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

08h55 HV is ON

10h07 70 MeV. Beam is in the ring with RF 100 kV, phase -37.5 dg. The recipe_recipe_LI_TL_RI_good_20260318_16_17_14.txt loaded, linac steerers
Entry   IC, VM;  
9h00 : mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)