  761   Wed May 31 21:36:49 2023 ND, LS, IC, VK, VM Shift summaryRing Commissioning RE: Studies on the Ring revolution frequency Bonjour,

Pouvez vous enregistrer les images
de l'oscilloscope et le donnée
  
  760   Wed May 31 14:46:21 2023 ND, LS, IC, VK, VM Shift summaryRing Commissioning Studies on the Ring revolution frequency Goal: understanding of teh beam natural
revolution frequency. Study the effect of
the dipoles.
 8x 
  759   Tue May 30 09:44:07 2023 MJ, KDUnder ProcessShift summaryRF Anneau | Ring Commissioning RE: RF et anneau 

Mercredi 24 j'ai fait un test
sur la cavité RF :
  
  758   Fri May 26 13:56:17 2023 VK, IC. VM, LS Shift summaryRing Commissioning Studies on the beam revolution frequency The main task for today is to measure the
revolution frequency without RF cavity with
the spectrum analyzer.
 12x 
  757   Thu May 25 15:08:18 2023 NC,IC, VM,lS Shift summaryRing   9:10 warm up modulator

10:30: cycling of magnets

10:20 : scan charge phase
 ring_storage_quality__2023_05_25_15_10_phase_scan_frm_1000_atx300_to_2500_at_x360.pngring_storage_quality__2023_05_25_15_31_phase_scan_from_0_atx300_to_250_atx3230_30kV.pngring_storage_quality__2023_05_25_15_39_phase_scan_from_0_atx4320_to_2500_atx4470_35kV.png 
  756   Tue May 23 11:36:24 2023 LS, ND Shift summaryLI | Diag Prise de donnees 23/05 9:30 Demarrage machine

Fin installation Cerenkov + tests
MRSV
 IMG_20230523_110343_8_copy_780x1040-20230523-164911728-20230523-164911770.jpg 
  755   Fri May 19 20:22:42 2023 MJ, KDUnder ProcessShift summaryRF Anneau | Ring Commissioning RF et anneau Apres 18h30 : prise ne main de la machine
pour aller dans la LE ==> le kicker d'extraction
est interlocké (abdandon) 
 24_4mm.png22_4mm.png 
  754   Fri May 19 18:05:29 2023 VK, IC Shift summaryRing Commissioning RF frequency of the Ring In the morning, after the start-up pf the
machine, scan phase-charge and small tuning
it was possible to store the beam with the
 scan_charge_phase_min_0.0_max_360.0_10_43_35.pngScreenshot_from_2023-05-19_13-50-56.pngScreenshot_from_2023-05-19_13-56-41.pngScreenshot_from_2023-05-19_12-15-50.png 
  753   Wed May 17 09:16:47 2023 VK, IC. AL Shift summaryRing Commissioning Understanding of the shift in RF frequency 8:40 Start warming up, problem with PSS.
It was restarted.

Problems to start and tune the
 18x 
  752   Tue May 16 10:28:43 2023 LS, ND, IC, VKUnder ProcessShift summaryRing Commissioning Ring operation 16/5 9:33 Start warming up

9:45 Ducre is working on the plumbing
but it shuld not affect operations
 health_check_2023_05_16_12_02.pngscan_charge_phase_min_0.0_max_360.0_12_8_7.png2023-05-16_12_13_52_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_100.pngring_storage_quality__2023_05_16_16_06.png 
  751   Mon May 15 11:31:43 2023 ND, LS, IC, VK, VM, SWUnder ProcessShift summaryRing Commissioning Ring operation 15/5 10:00 Machine warm up

Magnets cycling

11:00 Start machine
 7x 
  750   Fri May 5 08:47:28 2023 KD VM VK JN SLUnder ProcessShift summaryRing Commissioning shift du 5 mai 2023 8h30 : accès casemate controlé 

==> septum et kickers OFF et
cavité RF OFF
 Screenshot_from_2023-05-05_17-25-28.pngScreenshot_from_2023-05-05_17-13-31.pngScreenshot_from_2023-05-05_17-13-41.pngScreenshot_from_2023-05-05_17-52-52.pngScreenshot_from_2023-05-05_17-50-31.png 
  749   Thu May 4 16:14:06 2023 Entered by Marie Jacquet from 134.158.89.45 on Wed May 3 20:10:26 2023 Shift summaryLinac Commissionning RE: Stabilite LINAC  




  
  748   Thu May 4 11:41:53 2023 VK, VM, IC, LS Shift summaryRing Commissioning Restart storage in the Ring ~9h Start of the modulator

10h Tuning of the injector with
KD
  
  747   Thu May 4 10:09:43 2023 Entered by Viktor Soskov from 134.158.195.153 on Thu May 4 10:09:22 2023FixedInfoLinac Commissionning Laser status Bonjour l'énergie UV actuelle
sur la cathode = 58µJ avec l'iris
1.3mm
  
  746   Wed May 3 20:10:40 2023 Entered by Marie Jacquet from 134.158.89.45 on Wed May 3 20:10:26 2023 Shift summaryLinac Commissionning Stabilite LINAC Pour illustrer la fin de l'entree
elog 745 d'aujourd'hui  :

 2023-05-03-traitement_Data20230424et26.pdf 
  745   Wed May 3 09:04:24 2023 KDNew SolutionShift summaryLI | TL | LE | Linac Commissionning shift du 03 mai 2023 9h : Mise en chauffe machine (frigo,
chiller, modulateur, PA, Laser)

13h30 : Démarrage Machine
 8x 
  744   Fri Apr 28 09:20:00 2023 ND, LS, IC, VM, VKNew SolutionShift summaryRing Prise de donnee 27/4/2023 9:19: Mise en chauffe

10:24 Cycling magnets

10:50 Demarrage faisceau
 10x 
  743   Thu Apr 27 09:24:26 2023 ND, LSNew SolutionShift summaryRing | Diag Prise de donnee 26/4/2023 9:24 Mise en chauffe

9:30 Cyclage des aimants

11h44 Démarrage faisceau
 2023-04-27_14_41_46_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png2023-04-27_14_43_34_el_dg_sst_01-ccd_01_RAW.png 
  742   Wed Apr 26 19:03:56 2023 Entered by Marie Jacquet from 134.158.89.45 on Wed Apr 26 19:03:42 2023 Shift summaryLinac Commissionning shift du 26/04 - Quads scans + stabilite 1) Quad scans Isol = 155,
175, 190, 200, 220 pris avec script classique
ET avec script FWHM LIMA - Taille a comparer,
  