781
|
Mon Jul 3 14:54:09 2023 |
SC/CB/JNC | | Shift summary | LI |
|
run du 3 juillet 2023 | | 9h30 Intervention Maher pour dosimètre
10h00 Mise en chauffe modulateur
et refroidissements |
 |
|
Draft
|
Fri Jun 30 13:14:30 2023 |
LS,ND | Under Process | Shift summary | Ring |
|
run du 30 juin 2023 | | 9:00 Warm up machine
10:40 Start the beam
10:50 Scan charge phase |
 |
|
Draft
|
Thu Jun 29 13:09:57 2023 |
LS, ND | New Solution | Shift summary | Ring |
|
shift du 29 juin 2023 | | 9:45 Git pull
Test des interfaces... OK
Probleme sur les ecrans du compte |
|
|
778
|
Mon Jun 26 09:27:46 2023 |
ND, LS | New Solution | Shift summary | Diag |
|
ThomX operations 26/6 | | 9:26 Mise en chauffe
9:40 Cycling the magnets
11:45 Beam ON |
|
|
777
|
Fri Jun 23 13:56:03 2023 |
all | | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
X detectes aujourd'hui | | Aujourd'hui on a detecte des X en mode
desynchro (notre signal correspond a ~ 3.10**6
ph/sec) |
|
|
Draft
|
Fri Jun 23 09:47:54 2023 |
VK, IC, DN, RC, JN | | Shift summary | Ring Commissioning |
|
search for X-rays | | 8h30 Start of the modumator, laser, magnet
cycling
9h45 Beam is ON. Scan charge vs. |
|
|
775
|
Thu Jun 22 19:39:58 2023 |
Entered by Marie Jacquet from 134.158.89.45 on Thu Jun 22 19:39:22 2023 | | Shift summary | Linac Commissionning | Ring Commissioning |
|
recherche IP e-/laser | | ** Au vu de ce shift tres instructif
d'aujourd'hui, pour demain:
1) |
|
|
774
|
Thu Jun 22 11:43:35 2023 |
Entered by Marie Jacquet from 134.158.89.45 on Thu Jun 22 11:43:12 2023 | | Shift summary | Linac Commissionning | Ring Commissioning |
|
Bruit de fond diodes ligneX | | |
|
|
773
|
Thu Jun 22 09:26:38 2023 |
ND, LS, MB, DN, MA, IC, VK, MEK, JNC, MJ, RC | Under Process | Shift summary | Ring | Ring Commissioning |
|
X-rays attempt 22/06 | | 9:23: Mise en chauffe
9:29 Cycle magnets
10:20 Acces casemate cavite CFP |
10x |
|
772
|
Fri Jun 16 09:36:07 2023 |
VK, IC. VM, AL, ND, LS | | Shift summary | Ring Commissioning |
|
Orbit correction, optimization of the storage, study of the RF frequency | | 9h30 Start of the modulator and lasser
(GATE is closed).
9h46 Data is taken as background. |
8x |
|
771
|
Thu Jun 15 17:46:40 2023 |
VK, IC. VM | | Shift summary | Ring Commissioning |
|
Orbit correction, BLM in the Ring | | The BLM detector boxes were installed in
the ring. We connected 3 fibers and 2 scintillator
detectors in th ring to be able to observe |
7x |
|
770
|
Wed Jun 14 18:18:32 2023 |
VK, IC. VM | | Shift summary | Ring Commissioning |
|
Srart of the beam physics measurements | | The main idea fo this week is to
prepare the beam for the search of the first
X-rays. |
14x |
|
769
|
Tue Jun 13 18:06:14 2023 |
VK, IC. VM, ND, LS | | Shift summary | Ring Commissioning |
|
beam storage | | The main idea fo this week is to
prepare the beam for the search of the first
X-rays. |
   |
|
768
|
Tue Jun 13 15:27:35 2023 |
ND, RC | New Solution | Info | Laser |
|
Effet eclairage sur detecteurs RX | | Effet de l'eclairage dans la casemate
sur les detecteurs a RX (lumiere eteinte
a 15:26:40) => il faut fonctionner avec |
|
|
767
|
Tue Jun 13 15:00:28 2023 |
Entered by Viktor Soskov from 134.158.195.153 on Tue Jun 13 15:00:13 2023 | Fixed | Info | Linac Commissionning |
|
arret de la machine | | Bonjour,
avant d'arrêter completement
de la machine il faut absolument fermer le |
|
|
766
|
Tue Jun 13 14:42:16 2023 |
Entered by Viktor Soskov from 134.158.195.153 on Tue Jun 13 14:42:00 2023 | Fixed | Info | Linac Commissionning |
|
arręt de la machine | | Bonjour,
avant d'arrêter completement
de la machine il faut absolument fermer le |
|
|
765
|
Tue Jun 13 13:55:41 2023 |
SC, ND | New Solution | Info | LI |
|
RE: Effet changement de phase RF Canon sur TL/BPM.02 | | Le code lock_position_tl_bpm_02.py a ete
mis a jour pour prendre cet effet en compte.
|
|
|
764
|
Tue Jun 13 13:51:05 2023 |
SC, ND | New Solution | Info | LI |
|
Effet changement de phase RF Canon sur TL/BPM.02 | | Quelques changements de phase canon. On
voit que quand l'orbite derive vers des
valeurs negatives sur Tl/BPM.02/SpX le fait |
|
|
763
|
Mon Jun 12 14:52:39 2023 |
VK, IC. VM | | Shift summary | Ring Commissioning |
|
Reestablishing running conditions at 500.38 MHz | | Goal of the shift: Reestablish the good
storage at 500.38 and then try to optimize
the storage and orbit. |
    |
|
762
|
Wed Jun 7 16:02:33 2023 |
LS, MB, VC, ND | Reference Solution | Shift summary | Ring |
|
Programme prise de donnees 8/06 | | 9:23 Mise en chauffe
Nombreux pb vide dans health check
Acces casemate pour verification |
   |