Entry   SC/CB/ME; Faisceau linac et cavite RF 
8h55 Démarrage modulateur et refroidissements

Intervention SPR terminé

Solenoide = 190A, pas de quadrupoles, LI/PS/STR.01-H.01 = -1A, LI/PS/STR.01-H.01 = 0.90A, position laser = hor 4.635mm ver 1.736mm, visualisation
Entry   SC/CB/JNC; run du 3 juillet 2023 coil2scan_18h06.pngcoil2scan_18h06.png
9h30 Intervention Maher pour dosimètre

10h00 Mise en chauffe modulateur et refroidissements

14h prises d'image laser selon églage du miroir M5. Le laser n'est pas bien aligné sur l'iris --> a reprendre
Entry   LS,ND; run du 30 juin 2023 health_check_2023_06_30_13_20.pngscan_charge_phase_min_280.0_max_320.0_10_54_10.png
9:00 Warm up machine

10:40 Start the beam

10:50 Scan charge phase 
Entry   LS, ND; shift du 29 juin 2023 
9:45 Git pull

Test des interfaces... OK

Probleme sur les ecrans du compte operateur ThomX (4x1 ecran) meme apres redemarrage => reconfiguration
Entry   ND, LS; ThomX operations 26/6 
9:26 Mise en chauffe

9:40 Cycling the magnets

11:45 Beam ON
Entry   all; X detectes aujourd'hui 2023-06-23-Shift.pdf
Aujourd'hui on a detecte des X en mode desynchro (notre signal correspond a ~ 3.10**6 ph/sec)

*** Pour :

- 100 pC stockee pendant 100 ms

- 30 kW dans la cavite

Entry   VK, IC, DN, RC, JN; search for X-rays 
8h30 Start of the modumator, laser, magnet cycling

9h45 Beam is ON. Scan charge vs. RF phase.

Attribute Li/OP/OPT.01-ATT.01  is showing value 340mm, this is different from the nominal ones of 300-303. Charge to be remeasured at nominal
Entry   Entered by Marie Jacquet from 134.158.89.45 on Thu Jun 22 19:39:22 2023; recherche IP e-/laser 
** Au vu de ce shift tres instructif d'aujourd'hui, pour demain:

1) Le sens le moins chronophage des scans table FPC sont:

Partir en Ty negatif, et aller vers Ty pos
Entry   Entered by Marie Jacquet from 134.158.89.45 on Thu Jun 22 11:43:12 2023; Bruit de fond diodes ligneX 2023-06-22-bruit-de-fond-diodes-ligneX.pdf
 
Entry   ND, LS, MB, DN, MA, IC, VK, MEK, JNC, MJ, RC; X-rays attempt 22/06 10x
9:23: Mise en chauffe

9:29 Cycle magnets

10:20 Acces casemate cavite CFP
Entry   VK, IC. VM, AL, ND, LS; Orbit correction, optimization of the storage, study of the RF frequency 8x
9h30 Start of the modulator and lasser (GATE is closed).

9h46 Data is taken as background.

Cavity is tuned to 500.38 MHz. Optimization of the energy and phase. 
Entry   VK, IC. VM; Orbit correction, BLM in the Ring 7x
The BLM detector boxes were installed in the ring. We connected 3 fibers and 2 scintillator detectors in th ring to be able to observe the beam losses.

Cabling, connection and checks of the BLM without the beam.

Machine start-up. Modulator was switched on at ~9h30.
Entry   VK, IC. VM; Srart of the beam physics measurements 14x
The main idea fo this week is to prepare the beam for the search of the first X-rays.

Start machine without RF cavity. During the day several reboot of the libera.02 (TL).

Study of the dispersion. Measurements of the horizontal dispersion by changing the injector energy (RF section attenuator).
Entry   VK, IC. VM, ND, LS; beam storage closed_orbit_13062023.pngScreenshot_from_2023-06-13_18-27-36.pngScreenshot_from_2023-06-13_18-25-45.pngScreenshot_from_2023-06-13_17-23-16_WO_RF.png
The main idea fo this week is to prepare the beam for the search of the first X-rays.

Start without RF cavity. Study of the orbit. Orbit correction. We menage to correct hor. and vert. orbit.

We put the RF cavity ON. A lot of interlocks during the day. Difficult to operate i this conditions.
Entry   ND, RC; Effet eclairage sur detecteurs RX Screenshot_from_2023-06-13_15-27-06.png
Effet de l'eclairage dans la casemate sur les detecteurs a RX (lumiere eteinte a 15:26:40) => il faut fonctionner avec la lumiere eteinte pour
plus de sensibilite.
Entry   Entered by Viktor Soskov from 134.158.195.153 on Tue Jun 13 15:00:13 2023; arret de la machine 
Bonjour,

avant d'arrêter completement de la machine il faut absolument fermer le "Gate laser" via

1, LI/OP/OPT.02-LAS.01-ASP.01 - Gate_int -False
Entry   Entered by Viktor Soskov from 134.158.195.153 on Tue Jun 13 14:42:00 2023; arręt de la machine 
Bonjour,

avant d'arrêter completement de la machine il faut absolument fermer le "Gate laser" via

1, LI/OP/OPT.02-LAS.01-ASP.01 - Gate_int -False
Entry   SC, ND; Effet changement de phase RF Canon sur TL/BPM.02 Screenshot_from_2023-06-13_13-50-23.png
Quelques changements de phase canon. On voit que quand l'orbite derive vers des valeurs negatives sur Tl/BPM.02/SpX le fait de faire decroitre la
phase rattrappe la position...

 
    Reply   SC, ND; RE: Effet changement de phase RF Canon sur TL/BPM.02 
Le code lock_position_tl_bpm_02.py a ete mis a jour pour prendre cet effet en compte.

 




SC,
Entry   VK, IC. VM; Reestablishing running conditions at 500.38 MHz scan_charge_phase_min_0.0_max_360.0_14_32_59.pngScreenshot_from_2023-06-12_15-23-07.pngScreenshot_from_2023-06-12_15-40-14.pngScreenshot_from_2023-06-12_17-38-24.pngScreenshot_from_2023-06-12_17-32-48.png
Goal of the shift: Reestablish the good storage at 500.38 and then try to optimize the storage and orbit.

Start up of the machine.

RF cavity start up by Mohamed. Water leakage. Jean-Noel will fix tomorrow mornig. Mohamed also says that aparently the sinal from ring syntetizer
Entry   LS, MB, VC, ND; Programme prise de donnees 8/06 health_check_2023_06_08_09_30.pnghealth_check_RF_2023_06_08_09_30.pnghealth_check_Vide_2023_06_08_09_30.pnghealth_check_Alimentation_2023_06_08_09_31.png
9:23 Mise en chauffe

Nombreux pb vide dans health check

Acces casemate pour verification polarite RI-C2/DG/BPM.02 pas de probleme trouve.
ELOG V3.1.4-395e101