HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 21 of 62  Not logged in ThomX    logo
ID Date Author Statusdown Type Category Important Subject Icon
  992   Thu Jan 9 16:03:52 2025 ND, IC, VK, VMUnder ProcessShift summaryLE Optimisation LE 

15h Scan extraction kicker vs EL/BPM.01.

See attached plots.

Some interferences with ring storage.

Stay around -8us.

Testing reproductibility

Extraction timing=-8.088

Transmission 9%

16h40 Scanning EL/PS/DP.01...

Transmission 36% but it is not clear if the improvment comes from the ring or the transport.

Storage losses in the ring are about 50% so less than 15% losses due to ring injection+extraction.

 

 

 

  993   Fri Jan 10 08:24:25 2025 IC, VK, VM, NDUnder ProcessShift summaryRing Commissioning   

08h25 Start ThomX: Modulator, Frigo, cycling all magnets

08h30 Start chillers

10h00 HV is 'On'

10h25 RF Gun Phase is 193 dg., Sect. Att. is 2.46 dB, Phase is 218 dg. Charges:  -98 pC, -105 pC, -106 pC

Linac steerers: H [2.38 -4.16], V [-1.8 2.15]

Ring injection. After cycling Ri-C1 QP5 is out of order, fixed

10h30 Beam is in the ring, Rec. from 20250109_17_23, TL/BPM02 X=+3 mm

11h00 setings for ring without sextupoles for LOCO

11h04 setings for ring without sextupoles for LOCO (Matlab config file) is saved

The same with sextupoles.

Trying LOCO with sextupoles: LOCO inprove results on storage and tune. Tune changed from 0.15 to 0.17

13h30 HV is 'Off'.  Controled access to the bunker.

13h55 HV is 'On'

/tmp_mnt/data/shared/commissioning_scripts/MatLab/pilotage/libera_calctunesS_ThomxOperateur.m  to measure tune from operateut.thomx account

16h55 Stop ThomX

 

  994   Tue Jan 14 07:53:17 2025 KD MJ VC HGUnder ProcessShift summaryMECA | Linac Commissionning | Ring Commissioning shift du 14 janvier 2025 

7h50 : mise en chauffe machine à distance (chiller, frigo, modulateur, laser)
9h15 re demarrage du serveur LI/OP/LAS.02 => External_trigger_multi  
redemarrage serveur feedback laser   astor/salle control/client5/ThomX_Photocathode
réalignement laser
passage section
Alignement Q1-Q3
YAG TL/DG/STT01  très sale sur la camera à nettoyer?

pB E faisceau

phasesec 217 

Ebeam att 1.7dB 43.15 Mev
Ebeam att 1dB 41 Mev
Ebeam att 5dB 38 Mev
Ebeam att 2dB 45 Mev (soleno 160A)
Ebeam att 1dB 42 Mev !!!!!!!!
Ebeam att 1dB 45 Mev !!!!!!!  =>>>> Vincent : "Oups c'est pas moa"   Qqun : " OOOOOOHHH comment il assume pas le mec !"
Ekinbeam canon 4.8MeV  => pB phase max canon !   phase canon 2107  ... OUILLE OUILLE OUILLLE

   ... redevenons  serieux
Alignement Q1-Q3

Alignement QUADs Q4 a Q7

  ** Q5 avec le TL/STR1H  entre 3 et 4 A       (tous les str de la TL à 0 test avec Q1 et Q3 à 0 et au nominal)
  ** Q4 avec avec le TL/STR1H  à 0
  ** Q6 avec avec le TL/STR1H à 3A
  ** Q7 avec avec le TL/STR1H à 4A  

StrTL1X :  positif vers le mur   et  BMPTL01 : positif vers le mur (archive Marie (à ne pas recycler ))
On verifie que c'est coherent.

3.5 A sur strTL1H avec beam 50MeV : correspond a rotation Q1-Q3 de 0.6 mrad vers le mur  (calcul Marie a verifier avant potentielle intervention MECA)

Mesures

Avec phase et attenuateur section min dispersion et energie 50 MeV (bpmtl2_x = 0) :
Pour differentes valeurs de soleno :
  ** Mesure d'emittance en mode "section alignee"
  ** Re-Mesures Axe section et Axe Q1_Q3

19h40 fin de shift  

  996   Wed Jan 15 08:16:32 2025 MJ KD VC HGUnder ProcessShift summaryAimants | Linac Commissionning | Ring Commissioning shift du 15 janvier 2025 

8h15 : mise en chauffe de la machine à distance (modulateur, laser, frigo, chiller)

faisceau Linac et TL non déviée  => manip pour la comphéension des sauts.
Pos laser H4.374 V3.36
Phase canon Emax 162
best foc sut Li YAG1   250A
QEmax  130pC
LI Str 1 H 2.38  V -1.9
LI Str 2 H -4.16  V 2.05
phase section (non optimisée) 213
Dipole off

Avec ou sans Q1 à Q3 les saut sont visibles sur TL/BPM1 et TL/SST1

relation courant steerer/pos faisceau TL\BPM1


LI str2  +-0.1A => +-500µm position
LI str1  +-0.1A => +-300µm position

V
LI str2  +-0.1A => +-500µm position
LI str1  +-0.1A => +-500µm position

test nB step versus frequence canon

Q beam 25pC

11h27  => freq gun 25Hz   11h37
11h37  => freq gun 1Hz     

(Njumps / delta_t) decreased with beam repetition rate --> most likely a charge effect  

15h30 Alex fait 3/4 de tour de cle Q1-Q3 (q3 vers le mur, ~0.5-0.7 mrad)
Ca ne semble pas changer grand chose sur alignement q5_q7 ... a verifier + axe q1_q3 a reconstruire

======================

17h: Injection + stockage anneau avec 160.4 I_dip anneau + HIGH Steerers horiz TL 
    recipe_recipe_LI_TL_RI_good_20250115_17_11_29.txt
    Cf screenshot stockage_50MeV_new_align.png


17h25 :  injection + stockage anneau
   1) sans steerer horiz
   2) et avec 159.3 dipoles anneau

        --> recipe_recipe_LI_TL_RI_good_20250115_17_28_10.txt
       
cf screenshots
          
stockage_50MeV_new_align_159_3_no_steerer.png
              tbtsum_compare_160_4_and_159_3-ring_dipole_2025-01-15_17-33-25.png
              ST3_storage_No_steerer_dipRING_159_3_2025-01-15_18-24-13.png
              BPM_TL_2025-01-15_17-52-24.png

fin de shift

 

  997   Thu Jan 16 08:28:07 2025 VM, IC, VKUnder ProcessShift summaryRing Commissioning   

08h25 Start ThomX: Modulator, frigo

08h35 Start chilers, laser, cycling all magnets

10h05 HV is 'On'

RF gun phase is 161 dg., Dark current about 25 mV, Att. Sect. is 2.53 dB, phase is 213 dg., Charges: -101 pC, 99. pC, -109 pC

Linac steerers: H [2.63 -4.38], V [-2.03 2.47]

10h20 RF cavity; problem with amplifier: fixed

10h25 Beam injected to the ring without RF, RCDS on the transfer line

10h45 RF is 'On'  150kV, phase -58.5 dg. TL/BPM02 X=0 

10h55 Receipt saved (I dp in ring at 159.3 A)

LOCO

11h38 Jump in Vertical position at TL/BPM01 on +1mm. Storage drops

Change the linac steerer V1 to -2.23 TL/BPM01 Y=-0.5 mm

12h16 Start feedback on the TL/BPM.01 position X=0, Y=-0.5

14h30 Start cycling dipoles and quads of the ring

14h43 The receipt from 10h55 loaded. Storage restored

15h10 ring settings with I dp = 160.4 A loaded (from the receipt of 20250110_11_04)

18h05 Stop ThomX

 

 

 

 

 

 

  999   Fri Jan 17 08:44:09 2025 MV, IC, VKUnder ProcessShift summaryRing Commissioning   

08h43 Start ThomX: Modulator, frigo, laser, cycling all magnets

08h50 Chillers started

09h52 HV is 'On'

10h08 HV=1215V

10h25 RF Gun Phase is 153 dg., Sect Att. is 2.5 dB, Phase is 206 dg. Charges: -107 pC, -107 pC, -113 pC

10h30 Beam injected to the ring, Receipt from 16/01/2025  18:03 TL/BPM02 X=+2mm, without RF the ring orbit is low (all negative)

11h00 RF is 'On', 100kV

11h07 FR 150 kV; to minimize synchrotron oscillations TL/BPM02 X=+2 mm

11h33 Vacuum interlock, restarted

12h28 FPC table Scan

12h40 FPC table scan: sigma Y=171 um

13h33 FPC table scan: sigma Y=156 um

13h57 RF voltage set to 250kV

14h20 FPC table scan: sigma Y=179 um

14h25 The ring optics from 10-Jan-2025 11h03 loaded

Vertiacl tune studies. Steptune 0.05 several tilmes , vertical tune start to be pronounced; Tune correction towards the nominal one 0.64;

15h27 FPC table scan: sigma Y=126 um

16h00 FPC table scan: sigma Y=121 um

For all scans FPC power 90 kW, laser size was 70 um

17h35 Stop Thomx

 

  1000   Tue Jan 21 08:08:43 2025 KDUnder ProcessShift summaryLI | TL | Linac Commissionning | Ring Commissioning shift du 21 janvier 2025 

8h10 : mise en chauffe à distance (modulateur, laser, frigo/chiller)

  Draft   Thu Jan 23 08:44:17 2025 MV, IC, VK, RCUnder ProcessShift summaryRing Commissioning   

08h41 Start Thomx: Modulator, Frigo, Laser

08h46 Start chillers, all magnets sycling

09h50 Start RF

10h55 Linac steerers are about from 22/01/2025: H [0.49 -2.94], V [-3.13 3.39] to align with QP1 - QP3

RF Gun phase is 164 dg., Sect. Att. is 2.64 dB, Sect. phase is 208 dg., Charges: -108 pC, -115 pC, -119 pC

if set QP5 through QP7 and all TL steerers 'Off' but TL/Str01-V1 (-1.6 A): TL/BPM02 X,Y 0,0; TL/BPM03 X,Y -6.0,+2.0, TL/BPM04 X,Y -6.0,+5.0

11h30 Beam is in the ring: TL/BPM02 X,Y 1.2,0.9; TL/BPM03 X,Y -4.6,+3.2, TL/BPM04 X,Y -2.7,+2.7

14h43 Good Receipt 50 MeV for X rays

14h55 FPC table scan: sigma y =140 um

15h16 FPC table scan: sigma y =124 um

16h25 X ray detector level 40000

16h57 RF 150 kV, X ray detector level 50000 (one point)

It seems that Ri-C1 STR06-V01 and  Ri-C2 STR02-V01 have wrong polarity

18h05 Breakdowns in the RF Gun, Vacuum interlock

18h10 Restored

18h20 Stop ThomX

  1005   Fri Jan 24 08:45:26 2025 MV, IC, VK, RCUnder ProcessShift summaryRing Commissioning   

08h45 Start Thomx: Modulator, frigo, laser

08h50 Start chillers, cycling all magnets

Vacuum intervention, beam pipe closed. Vacuum OK to start (11.23)

Vacuum MPS off (Kevin)

Polarity of 2 vertical steerers in the ring :! ric1/str.06-v.01 and

ric2/str.02-v.01 were changed by Jean Noel, according to our request. 

11h20 HV is 'On'

RF Gun phase is 162 dg. Att. is 0.04 dB, Sect Att. is 2.62 dB, Phase is 212 dg. Charges: -107 pC, -112 pC, -117 pC

14h12 FPC table scan. Sigma y = 140um (receipt from 14h14). RF 150 kV

Accelerating section phase often needs  adjasment (from 106 dg. to 112 dg. )

Trying LOCO. 

14h51 the receipt from 14h14 loaded (saved before LOCO). The FPC table at X ray max. (X photodiode reading of 470 pA ). Ramp the RF cavity to 250 kV

14h58 Slava made RCDS on X photodiode readings by adjusting vertical steerers of the ring.   X photodiode reading is 500 pA

15h04 Receipt seved. X photodiode readings reaches 522 pA.

15h15 FPC table scan. Sigma y = 128 um (receipt from 14h14). RF 250 kV

15h22 RF Gun phase is 166 dg. Att. is 0.04 dB, Sect Att. is 2.62 dB, Phase is 212 dg.

Beam position at TL/BPM02 unstable from the trigger to the trigger, so the ring storage.

16h00 Going to 61.5 MeV. Sect Att. at 1.1 dB, phase 228 dg. RF at 500.04545 MHz, 50 kV TL/BPM02 X=+4mm

16h38 receipt saved. There is some storage, but orbit is wide

17h30 Optimized configuration for 61.5 MeV very good storaga => Rceipt good_20250124_17_36_24

 

 

 

 

  1006   Fri Jan 24 17:39:00 2025 MV, IC, VK, RCUnder ProcessShift summaryRing Commissioning   

08h45 Start Thomx: Modulator, frigo, laser

08h50 Start chillers, cycling all magnets

Vacuum intervention, beam pipe closed. Vacuum OK to start (11.23)

Vacuum MPS off (Kevin)

Polarity of 2 vertical steerers in the ring :! ric1/str.06-v.01 and

ric2/str.02-v.01 were changed by Jean Noel, according to our request. 

11h20 HV is 'On'

RF Gun phase is 162 dg. Att. is 0.04 dB, Sect Att. is 2.62 dB, Phase is 212 dg. Charges: -107 pC, -112 pC, -117 pC

14h12 FPC table scan. Sigma y = 140um (receipt from 14h14). RF 150 kV

Accelerating section phase often needs  adjasment (from 106 dg. to 112 dg. )

Trying LOCO. 

14h51 the receipt from 14h14 loaded (saved before LOCO). The FPC table at X ray max. (X photodiode reading of 470 pA ). Ramp the RF cavity to 250 kV

14h58 Slava made RCDS on X photodiode readings by adjusting vertical steerers of the ring.   X photodiode reading is 500 pA

15h04 Receipt seved. X photodiode readings reaches 522 pA.

15h15 FPC table scan. Sigma y = 128 um (receipt from 14h14). RF 250 kV

15h22 RF Gun phase is 166 dg. Att. is 0.04 dB, Sect Att. is 2.62 dB, Phase is 212 dg.

Beam position at TL/BPM02 unstable from the trigger to the trigger, so the ring storage.

16h00 Going to 61.5 MeV. Sect Att. at 1.1 dB, phase 228 dg. RF at 500.04545 MHz, 50 kV TL/BPM02 X=+4mm

16h38 receipt saved. There is some storage, but orbit is wide

17h30 Optimized configuration for 61.5 MeV very good storaga the RF cavity at 500.04545 MHz => Rceipt good_20250124_17_36_24

Orbits with and without RF are close

17h40 Stop thomx

 

 

 

 

  1007   Mon Feb 10 09:42:13 2025 ND, VC, HG, MJUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Test demarrage 10/02 

9:37 Mise en chauffe

Maher signal que des tests ont ete fait sur le canon, leger risque de claquage.

Pression SF6: 2938mbar

Health Check:

rac.17-elr.01-RDP.01 en defaut.

Vanne OC/VA/aval.01 ne s'ouvre pas.

9:55 cycle magnets

Attenuateur canon 0.5dB (cf infos sur tableau en SdC)

Attenuateur section 2.5dB

10:40 Beam ON

Claquages a 1209V.

11:55 Ca passe a 1210V.

12:58 On atteind enfin 1215V!!!

Faisceau centre' a 238 degrees et 2.dB att section.

13:21 Chargement recette good_20250124_15_05_25

Passage 0dB Canon

Faisceau centre' a 238 degrees et 2.28dB att section.

14:00 Ring ferquency set to 500.100450 MHz

Rigol phase adjusted from 175 to 160 degrees

14:10 Faisceau stocke dans l'anneau

Phase -88

==========================

14:45 ; Gun conditioning

Note : vides

Increase attenuation to find multipacting barriers :
- Start 5dB end 6.5 dB ==> max : around 6.5
 

15h15 : 25Hz to speedup conditioning
16h++ : Soleno @ 300A mais interlocks vide puis soleno 280A

18h : On redescend doucement a 0db pour voir si il y a un effet sur les kicks apres ces qq heures de condition.

Tout a coup, plus de charge - FRIGO OFF tout seul tout a coup - (==>modulateur mis sur HV)

Jean-Noel essaie de redemarrer : en local non plus ça ne fonctionne pas.

Probleme résolu, automate était en mode STOP, mode RUN a tout arrangé.  cool

Mercredi : apres shift alignement données de vide @ différent puissance GUN

Zone multipactor autour de 6dB : vide amélioré ! on passe de 10^-9 à 6.10^-10  (V2, v3) V1 un peu aussi. 

2e zone multipactor :   autour de 14 dB. Il faut aussi la conditionner.  voir le dernier graphe. 

 

 

  1008   Tue Feb 11 10:31:57 2025 ND, Marie LabatUnder ProcessShift summaryDiag Streak camera 

9:20 Start aligning

12:40 Alignement done for both linac and ring.

Health check: Archiving not working

12:52 Start beam

Pb temperature gun and section

14:00 Beam on Cerenkov

Fixing misc. problems.

One motor of the MRSV mirror is dead.

17:30 Beam length measurement. t~15ps (convoluted with transport and focalisation)

*Note:*

- Time lost due to chiller problems

 

  1009   Wed Feb 12 08:00:31 2025 KD MJUnder ProcessShift summaryLI | TL | Linac Commissionning shift du 12 février 2025 - Alignements 

8h: mise en chauffe à distance (modulateur, frigo, chiller, laser)

9h30: laser semble pas aligné dans l'iris avec une forme assez étrange (trou au centre) ==> énergie sortie laser PC 270uJ

9h35: la forme du laser sur la photocathode virtuelle semble etre revenu avec l'alignement M5.

10h: démarrage des alignements Quad et Photocathode.

Nouveau point Cathode : [H,V] = [4.46, 3.46]

--> Réglage 50MeV, min dispersion

 

** Mesure alignement vertical QP1-3, QP4-5 :

QP1-3 : TL/BPM.01 [x,y] = [-0.09,0]mm ; TL/YAG.01 [x,y] = [395, 265] pixels

QP4-5 : TL/BPM.01 [x,y] = [-0.1, 0.22]mm ; TL/YAG.01 [x,y] = [395, 263] pixels

On trouve faisceau dans QP4-5 "descendant" par rapport à QP1-3 (mauvais sens par rapport à la section) ==> impossible d'aligner QP1-3 sur la section sans désaligner QP4-5.

Delta entre axe QP1-3 et axes QP4-5 = 0.2 mrad (vertical) 

** Mesure section alignee (strLi du elog 1002)

Axe section : TL/BPM.01 [x,y] = [-2.6,3.7]mm ; TL/YAG.01 [x,y] = [250, 67] pixels

Delta entre axe QP1-3 et axes section = 1.2mrad (vertical) ==> non cohérent avec les mesures précedentes (elog 1002)
     ==> elog 1002 du 22 janvier : il y a certainement eu une erreur de lecture de mesure du bpmTL1 pour l'axe section
            
Les autres mesures sont coherentes entre aujourd'hui et le 22 janvier (bpmLI, YagTL)

Plusieurs prises de mesures axes SECTION et Q1Q3 avec les valeurs de steerers suivantes :
    - align section : cf. elog 1002 du 22 janvier
    - align Q1-Q3   strLI H1 = 0.83
                                   V1 = -3.26
                                   H2 = -2.89
                                   V2 = 3.50

==> Cf. reconstruction en screenshot 
         
rouge : axe section
         bleu : axe Q1-Q3 avec Q1, Q2 et Q3 OFF 
         vert : axe Q1-Q3 avec Q1, Q2 et Q3 ON

==> quand on reconstruit les axes verticaux QP1-3, QP4-5 et section on trouve les defauts suivant :

- section - QP1-3 : 1mrad (sans calib BPM), 0.5mrad (avec calib BPM : X = valeurBPM / 0.8)

- QP4-5 - QP1-3 : - 0.2mrad

==> les désalignement verticaux semble très faible (<1mrad), mais il y a un gros "shift" de l'axe section.

 

 

 

 

 

  1010   Thu Feb 13 10:56:28 2025 ND, SC, Marie Labat, IC, VMUnder ProcessShift summaryRing Commissioning Opérations caméra à balayage / MRSV 

8h50 Mise en chauffe modulateur

Changement de la carte mère pour la badgeuse de la ligne X

31.2degres, toujours dAlignement laser dans la casemate

Canon complètement désadapté à 1200 et 1215V à la température de 31.6 degres, passage à 31.2 degres, toujours desadapté (cf screenshot) ???

Nous étions à 25Hz , passage à 10Hz.

Adaptation du canon ok

14h-15h: Tentative d'observation du rayonnement synchrotron sur la caméra à balayage. Le signal est visible en mode focus (sans balayage temporel) mais pas en mode avec balayage temporel. Est-il trop faible?

15h-18h: Optimisation du MRSV. Changement d'un miroir de renvoi qui était abimé, ajustement de la position de la lentille pour faire une image plus nette.

Lors du déplacement de l'anneau l'axe optique du MRSV a bougé.

Avec l'orbite par défaut, nous ne voyons que le bord du faisceau. Il faut changer l'orbite pour voir le centre du faisceua. Cf images jointes.

18:00 On laisse la machine à Hayg.

 

 

  Draft   Fri Feb 14 08:21:26 2025 Entered by Super Team from 134.158.195.141 on Fri Feb 14 08:21:09 2025Under ProcessShift summaryRing Commissioning   

08h20 Start ThomX: modulator, laser, fridge,cycling all magnets

08h25 chillers are started

09h50 Controlled access (Rhonic)

09h57 HV is 'On'

10h00 HV is at 1215 V

10h04 RF Gun phase is 136 dg.

10h10 Receipt from 13022025 15;05 loaded

Sect. Phase is 215 dg., Att. 2.48, TL /BPM02 X=0

The yesterday receipt does not provide yesterday storage. The ring was adjusted.

13h20 Vacuum interlock in the ring

13h40 Tthe linac waz reajusted after the interlock. RF Gun phase is 124 dg. Sect. Phase is 215 dg. TL /BPM02 X=3.5 mm

14h21 Scan FPC table. Vert. sigma 120um

Charge: -109; -104; -117 pC

15h00 61.5 MeV. Charges: -110, -107, -113 pC; F=500.04545, 100 kV, Manual phase shifter on 5254, RF phase is 23.5 dg. (the mixer phase shifter for amplitude 3562 )

15h34 Scan FPC table, so-so.

16h15 Scan FPC table 177 um.  Recipt All_202050217_16_22

16h59 70 MeV Sect. Att. 0.244 dB, Phase 238 dg. TL/BPM2 X=-0.5 mm. Linac steerers: H [0.19 -2.85], V [-3.63 3.49]

18h05 Can not store the beam

18h06 Stop ThomX

 

 

 

  Draft   Mon Feb 17 11:00:01 2025 VM, IC, VKUnder ProcessShift summary  70 MeV WP 

10h30 Start beam

Since Friday evening the problem to store the beam at 70 MeV. There is 1 turn only. Probably some subsystem failure. At this moment the reason is not found. Help is needed: synchronization/Diag/Magnets.

Today morning the same situation. We came back to 50 MeV and the problem remains.

We checked dipoles with resistors, it looks fine. We are checking synchronization and laser, Diag delays.....

We found the problem is with kicker. looking now at this with Maher. The max value it accepts is 2500 V.

12h20 Maher wil restart the kicker at the hardware level. Maher is contacting SOLEIL.

12h30 The modulator has been set to standby mode.

Investigation of the problem with injection kicker.

Tomorrow tests with SOLEIL people.

16h30 Stop ThomX

  1013   Tue Feb 18 08:28:36 2025 VC, KD, VM, ND, RC, MJUnder ProcessShift summaryLI | Linac Commissionning shift  

demarrage machine 8h30

intervention Kicker.. 8h45 

10H30 fin intervention Kicker Ok

Gros pB de pilotage du Timing, Tango ne prend plus en compte les décimales de pilotage des retards, la machine n'est pas reglable à mieux que la micro seconde!!!!

18h00 Stop ThomX

  1014   Wed Feb 19 08:28:11 2025 Entered by Super Team from 134.158.195.141 on Wed Feb 19 08:27:57 2025Under ProcessShift summaryRing Commissioning   

08h26 Start ThomX: Modulator, Fridge, Laser

08h32 Chillers were started, cycling all magnets

11H changement de la carte synchro... Carte synchro opérationnel

Impossible d'avoir un signal sur l'ICT1 qq soit la phase ==> synchro ??

Vincent est repasse c ok

13h20 Receipt from 202514_14_21_55 loaded (suitable for 50 MeV), injector adjusted, there is a beam in the ring without RF and with RF 50 kV, 36.5 dg. It is necessary to adjust the injection (storage is not too bad, but TL/BPM2 x=+7.5). The injection kicker affects the radio protection system, causing blocking.

13h55 the modulator is in the standby mode, the laser shutter is closed

 

 

  1016   Thu Feb 20 08:25:11 2025 Entered by Super Team from 134.158.195.141 on Thu Feb 20 08:24:55 2025Under ProcessShift summaryRing Commissioning   

08h25 Start ThomX; Start ThomX: Modulator, Fridge, Laser

08h32 Chillers were started, cycling all magnets

11h23 HV is 'On'

11h46 RF Gun Phase is 28 dg. Sect Att. is 2.54 dB, Phase is 209 dg. TL/BPM2 X=0, Charges: -88, -92, -96 pC

Linac correctors: H [0.59 -2.86], V [-3.23 3.47]

12h24 Beam in the ring RF 50 kV, Phase 44 dg.

12h35 RF 150kV, Phase 32 Kicker delay 7.3952 us,  9497 V

17h10 HV on 'Sttandby', the laser gate closed, injection kicker pulse correction

17h52 injection kicker pulse was corrected

HV is 'On'

18h39 The beam is in the ring. It is OK!

18h45 Stop ThomX

  1017   Fri Feb 21 08:30:30 2025 shift crewUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 21 février 2025 

8h30 : démarrage machine en remote (modulateur, laser, chiller/frigo, cyclage)

Nouveau pb : variation du flux X lente
incomprehensible car cavite lockee et electrons stockes.

Le faisceau se deplace sur le dectris X_hutch lorsque le flux varie

Tests chqngement leger de frequence RF cavity :

  • ** Avant 15h : 500.10045 MHz
  • ** 15h : 500.1003 MHz ==> variation est devenue tres reguliere ...
  • ** 15h26 : 500.100 MHz  ==> idem, tres reguliere

Pas le meme comportement a 500.10045 MHz compare a 500.1003  et 500.100

On veut revenir a 500.10045
Miss triggers, puis juste apres plus de synchro du tout pour toute la machine !

Appel Vincent. Ronic teste la carte. Rien ne semble defectueux - Sur le gene 33 MHz, juste le fait d'appuyer sur le bouton ch1 ==> probleme resolu !

16h30 : Redemarrage faisceau

Retour a 500.10045 - Toukours pareil (fluctuation flux X)

17h23 "integrateur FPC" ==> BINGO !!!

17h45 : Optimisation position verticale table FPC

18h45 Scan flux 27000 pico ==> screenshot

19h20 fin de shift

 

ELOG V3.1.4-395e101