New entries since:Thu Jan 1 01:00:00 1970
Entry   ND, LS; ThomX operations 26/6 
Entry   Entered by Super Team from 134.158.195.141 on Fri Nov 3 10:02:34 2023; ThomX aujourd'hui erreur_server_images.pngimage_cameras_ok.png
Entry   Entered by Super Team from 134.158.195.141 on Thu Mar 24 09:25:25 2022; ThomX -commitionning diag 
Entry   Entered by Super Team from 134.158.195.141 on Thu Apr 14 08:04:41 2022; ThomX -commitionning diag 
Entry   VC, ND; Tests synchro 
Entry   VC,ND; Tests synchro 
Entry   Entered by Super Team from 134.158.195.141 on Fri Jun 28 14:37:07 2024; Tests reseau RF : branche attenuateur test_sur_charge_config.2.pptx
Entry   Entered by Super Team from 134.158.195.141 on Thu Jun 27 16:14:24 2024; Tests reseau RF test_sur_charge_config.1.pptx
Entry   Entered by SC/MO/VC/FW/MT/HG from 134.158.206.40 on Thu Jun 2 14:37:37 2022; Tests redpitayas sans faisceau 9x
Entry   Entered by sophie chance from 134.158.195.142 on Tue Oct 12 09:46:20 2021; Tests coupure signaux timing 
Entry   Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 09:31:12 2021; Tests RFs 
Entry   Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 14:36:35 2021; Tests RFs mise_en_chauffe
Entry   Entered by Maher OMEICH from 134.158.91.212 on Mon Dec 6 11:30:27 2021; Tests EPs  
Entry   SC; Tests CC apres re-démarrage 
Entry   Entered by Super Team from 134.158.195.141 on Fri Mar 7 11:03:05 2025; Test streak camera 7/03 
Entry   Jean-Noel, Marie; Test reseau RF: Tout est OK rep_freq_2024-07-18_19-17-18.pngrep_fre_2024-07-18_19-16-42.png2024-07-18_18-42-24_9db.png
Entry   IC, HG, RC, DN, JM; Test of the new receipt from BMAD Isol = 242 A 13x
Entry   VK, IC. VM, LS, JNC; Test of the new optics (27-28 July) 6x
Entry   Entered by VC/ND from 134.158.195.141 on Thu Apr 14 16:08:07 2022; Test mesure de charge 
Entry   ND-VC-VK-LP; Test interface démarrage + cyclage dipole 2022-07-06_12_41_52_li_op_las_02_Iris_1.1_RAW_8_16bits.tiff2022-07-07_14_02_54_li_op_las_02_log_scale_False_despeckle_False_min_scale_0_max_scale_250.pngcharge_phase__at_07-07-2022__14-33-44.jpg