HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 20 of 62  Not logged in ThomX    logo
Entry   Entered by Super Team from 134.158.195.141 on Thu Mar 24 09:25:25 2022; ThomX -commitionning diag 
Entry   Entered by Super Team from 134.158.195.141 on Thu Apr 14 08:04:41 2022; ThomX -commitionning diag 
Entry   VC, ND; Tests synchro 
Entry   VC,ND; Tests synchro 
Entry   Entered by Super Team from 134.158.195.141 on Fri Jun 28 14:37:07 2024; Tests reseau RF : branche attenuateur test_sur_charge_config.2.pptx
Entry   Entered by Super Team from 134.158.195.141 on Thu Jun 27 16:14:24 2024; Tests reseau RF test_sur_charge_config.1.pptx
Entry   Entered by SC/MO/VC/FW/MT/HG from 134.158.206.40 on Thu Jun 2 14:37:37 2022; Tests redpitayas sans faisceau 9x
Entry   Entered by sophie chance from 134.158.195.142 on Tue Oct 12 09:46:20 2021; Tests coupure signaux timing 
Entry   Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 09:31:12 2021; Tests RFs 
Entry   Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 14:36:35 2021; Tests RFs mise_en_chauffe
Entry   Entered by Maher OMEICH from 134.158.91.212 on Mon Dec 6 11:30:27 2021; Tests EPs  
Entry   SC; Tests CC apres re-démarrage 
Entry   Entered by Super Team from 134.158.195.141 on Fri Mar 7 11:03:05 2025; Test streak camera 7/03 
Entry   Jean-Noel, Marie; Test reseau RF: Tout est OK rep_freq_2024-07-18_19-17-18.pngrep_fre_2024-07-18_19-16-42.png2024-07-18_18-42-24_9db.png
Entry   IC, HG, RC, DN, JM; Test of the new receipt from BMAD Isol = 242 A 13x
Entry   VK, IC. VM, LS, JNC; Test of the new optics (27-28 July) 6x
Entry   Entered by VC/ND from 134.158.195.141 on Thu Apr 14 16:08:07 2022; Test mesure de charge 
Entry   ND-VC-VK-LP; Test interface démarrage + cyclage dipole 2022-07-06_12_41_52_li_op_las_02_Iris_1.1_RAW_8_16bits.tiff2022-07-07_14_02_54_li_op_las_02_log_scale_False_despeckle_False_min_scale_0_max_scale_250.pngcharge_phase__at_07-07-2022__14-33-44.jpg
Entry   Entered by Super Team from 134.158.195.141 on Wed Mar 23 12:52:44 2022; Test des redpitaya baie 17 6x
Entry   ND, VC, HG, MJ; Test demarrage 10/02 7x
ELOG V3.1.4-395e101