  Toutes les notes concernant les Commissionning de ThomX, Page 20 of 63  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Status Type Category Important Subject Icon Text Attachments
  870   Wed May 29 08:47:44 2024 M EK, KD, DN, HGUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 29/05 8h45: set to standby Modulateur

start Frigo et chiller section

start cond. @ 1.4 dB ( Pis=18 MW)
 1dB_1us_5Hz_interlock.png 
  869   Tue May 28 09:30:48 2024 MEC,SC, MO, RC Under ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 28/05 8h30 : Set to standby modulator

Vérification des cables
de chaines de mesures : constat un pb au
 scope_0.9dB_3us_1Hz_11h28.pngcapture_zoom_vide_0.9dB_3us_1Hz.png1dB_3us_1Hz.png0_6dB_3us_1Hz.png 
  868   Fri May 24 14:53:09 2024 ND InfoRF D1 Notifications sonores changement d'etat klystron Ajout d'un systeme de notification
sonore sur client1 quand le klystron change
d'etat.
 Screenshot_from_2024-05-24_14-52-04.pngScreenshot_from_2024-05-24_14-52-37.png 
  867   Fri May 24 08:21:49 2024 MEK , SC, Victor, Vincent Under ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Ring Commissioning Conditionnement section 24/05 8h10: set to standby Modulateur

Démarrage Frigo et Chiller

8h30 - 9h : intervention de Kevin
 1_1dB_3us_1Hz.pngScreenshot_1.6dB_3us_2024-05-24_17-05-27.pngclaquage_1_1dB_3us_1Hz.pdfpassage_5Hz_3us_1dB.pdf 
  866   Thu May 23 08:19:19 2024 M EK, ND, Iryna, VictorUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 23/05 8h15: set to standby Modulateur

démarrage frigo et chiller
section
 RF_signals_1.7dB_1µs_1HzAtt1dB_2us_1Hz_2024-05-23_14-51-45.pngScr_0.6_us_0.6_dB_2024-05-23_17-01-31.png 
  865   Wed May 22 08:47:19 2024 MEK,KDUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 22/05 8h45 : mise en marche de modulateur "set
to standby "

9h50 : démarrage, passage
 scope_3dB_2us_apres_claquage.pngscope_2dB_2us_apres_claquage.pngscope_1_7dB_2us_mauvais_reflechis.pngscope_1_7dB_2us_reflechis_OK.png 
  864   Tue May 21 08:33:12 2024 MEK, SC, KD, IC, MOUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 21/05 8h15 impossible de mettre " standby"
du modulateur ==> la pompe de refroidissement
n'est en marche
 red_pitayafrom_2024-05-21_17-39-23.png 
  863   Fri May 17 08:08:29 2024 MEK SC SV DNUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 17/05 set to standby modulateur 8h05

demarrage modulateur à 9h

impossible de passer à 1220V
  
  862   Thu May 16 08:38:19 2024 MEK, RC,VC, VKUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 16/05 conditionnement démmare à
7.4 dB atténuation section ( ) pour
une largeur impulsion RF 1µs et fréquence
 vide_cond_16_may_.png 
  861   Thu May 16 07:59:36 2024 KDUnder ProcessShift summaryLinac Commissionning Conditionnement section 16/05 8h: démarrage Klystron, frigo et
chiller
  
  860   Wed May 15 15:23:14 2024 MEK, HG, DNNot FixedProblemLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section Disjonction de PA 15h00=

Disjonction de PA 15h36

Etape 1 conditionnement : 1µs
 plots_vide_section.png 
  859   Wed May 15 10:52:19 2024 Entered by Super Team from 134.158.195.141 on Wed May 15 10:51:59 2024 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section sortie PA 120W ---> pas assez pour obtenir
la puissance nominale Klystron, sortie puissance
PA devrait etre autour de 400 W
  
  858   Tue May 14 17:50:45 2024 Entered by Marie Jacquet from 134.158.89.45 on Tue May 14 17:50:15 2024 Ligne XLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Camera PILATUS: instructions to use    CAMERA_PILATUS-Instructions_1.pdf 
  857   Tue May 14 11:12:18 2024 ND, MEKUnder ProcessShift summaryRF D1 Conditionnement section 8:45 Impossible de passer le modulateur
en standby.

Probleme d'eau.
 condj1.pdf 
  Draft   Thu Mar 7 08:58:28 2024 VK, VM, ICUnder ProcessShift summaryRing Commissioning Recomissioning of the SR, search for the X-rays 8h50 Warming up the machine

Problem with the vaccum around
the RF cavity (see screenshot attached).
 Screenshot_from_2024-03-07_09-02-36.png 
  855   Wed Mar 6 08:49:56 2024 IC, VM, VKUnder ProcessShift summaryRing Commissioning X-ray generation 8h50 Warming up the machine

10h start the beam

Tuning the injector
 Screenshot_from_2024-03-06_10-56-53.pngScreenshot_from_2024-03-06_17-18-12.pngScreenshot_from_2024-03-06_15-08-24.png 
  854   Tue Mar 5 15:10:32 2024 IC, VM, VKUnder ProcessShift summaryRing Commissioning Restart and tuning of the injector 10h Intervention to repair the water leakage.
It was repaired.

New problem with vacuum
 Screenshot_from_2024-03-05_15-13-48.png 
  853   Mon Mar 4 08:58:01 2024 Entered by Super Team from 134.158.195.141 on Mon Mar 4 08:57:45 2024Under ProcessShift summaryRing | Ring Commissioning Recomissioning of the SR, search for the revolution frequency  08h50 Start up of the machine

- Problem  with the vaccum,
the valves around the RF cavity are down.
  
  852   Fri Mar 1 11:11:17 2024 Entered by Viktor Soskov from 134.158.89.70 on Fri Mar 1 11:10:55 2024FixedProblemLaser laser status Bonjour,

actuellement le contrôle
du shutter (gate) du laser est dispo
  
  851   Fri Mar 1 10:39:04 2024 VK, VM, IC on Thu Feb 29 Under ProcessShift summaryRing | Ring Commissioning Recomissioning of the SR, search for the revolution frequency  Start of the machine 9h

Optimization of the beam transport
to the Ring.
 Screenshot_from_2024-02-29_12-15-58.pngScreenshot_from_2024-02-29_14-27-36.pngScreenshot_from_2024-02-29_11-27-21.png 