HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 19 of 58  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   Entered by Super Team from 134.158.195.141 on Wed May 15 10:51:59 2024; Conditionnement section 
Entry   Entered by Marie Jacquet from 134.158.89.45 on Tue May 14 17:50:15 2024; Camera PILATUS: instructions to use CAMERA_PILATUS-Instructions_1.pdf
Entry   ND, MEK; Conditionnement section condj1.pdf
Entry   VK, VM, IC; Recomissioning of the SR, search for the X-rays Screenshot_from_2024-03-07_09-02-36.png
Entry   IC, VM, VK; X-ray generation Screenshot_from_2024-03-06_10-56-53.pngScreenshot_from_2024-03-06_17-18-12.pngScreenshot_from_2024-03-06_15-08-24.png
Entry   IC, VM, VK; Restart and tuning of the injector Screenshot_from_2024-03-05_15-13-48.png
Entry   Entered by Super Team from 134.158.195.141 on Mon Mar 4 08:57:45 2024; Recomissioning of the SR, search for the revolution frequency  
Entry   Entered by Viktor Soskov from 134.158.89.70 on Fri Mar 1 11:10:55 2024; laser status 
Entry   VK, VM, IC on Thu Feb 29 ; Recomissioning of the SR, search for the revolution frequency  Screenshot_from_2024-02-29_12-15-58.pngScreenshot_from_2024-02-29_14-27-36.pngScreenshot_from_2024-02-29_11-27-21.png
Entry   VK, VM, IC; Recomissioning of the SR, search for the revolution frequency  13x
Entry   CB/JNC; shift linac 29/02/2024 
Entry   VC, VM, VK; Commintionning RING health_check_2024_02_28_08_50.pngScreenshot_from_2024-02-28_11-47-13.pngScreenshot_from_2024-02-28_15-34-51.pngScreenshot_from_2024-02-28_16-50-50.png
Entry   KD, VK, VM; run du 27 février 2024 
Entry   VC, VK, VM, IC, ND; redemarage machine après élongation anneau scan_Laser_vs_RF_phase_2024_02_26_10_41.pngScreenshot_from_2024-02-26_12-13-46.png
Entry   SC/JNC; redemarrage linac apres elongation anneau 
Entry   KD, HG, VC, RC; shift du 8 février 2024 RF_PiCanon.pngScreenshot_2024-02-08_11-41-09-BPMtldgbpm.02-lib0.2.png
Entry   Entered by Marie Jacquet from 134.158.89.45 on Tue Feb 6 20:21:21 2024; commissioning 
Entry   VC MJ KD; commissionning 7x
Entry   ND, Anna K, Elene K, Marie L; Prise de donneees 5/02 mrsv_nobeam.pngmrsv_beam.png
Entry   Entered by Super Team from 134.158.195.141 on Fri Feb 2 08:16:31 2024; Shift du 2 février 2024 Screenshot_2024-02-02_12-05-19.png
ELOG V3.1.4-395e101