  833   Wed Jan 24 08:57:25 2024 VC, IC, VK, VMUnder ProcessShift summaryLinac Commissionning | Ring Commissioning Commissioning Demmarrage machine à 8h45

IHM ThomX warm-up

8H55 Chauffage klystron, Frigo 
 10x 
  834   Thu Jan 25 08:49:29 2024 VC DN ND, IC, VM, KD, AS RC , VK...Under ProcessShift summaryLinac Commissionning | Ring Commissioning commitionning 8h45 demarrage chauffage Modulateur et
frigo

Pb sur le serveur li/opt.02-las.01-asp.01
 27x 
  836   Wed Jan 31 14:12:25 2024 RC VC MJ Under ProcessOtherRing Commissioning commitionning Chauffage mod 11h

demarrage machine 14H

on suit le star faisceau step par
 2024-01-31_16_01_44_el_dg_sst_01-ccd_01_RAW.png2024-01-31_16_02_12_tl_dg_sst_01-ccd_01_RAW.png 
  837   Thu Feb 1 08:10:14 2024 VK VC HG SC MEUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning commitionning 8h10 rémarrage machine chauffage
klystron frigo et chiller

pB DS   calc/er_sy/rac.17-elr.01-rdp.0X.Y 
  
  839   Thu Feb 1 16:30:20 2024 Entered by Marie Jacquet from 134.158.89.45 on Thu Feb 1 16:30:01 2024Under ProcessShift summaryLI | TL | LE | Ring Complement de la fin du elog 837 En complement de la fin de l'entree
elog 837 ou il est ecrit a la fin :

on
  
  840   Fri Feb 2 08:16:50 2024 Entered by Super Team from 134.158.195.141 on Fri Feb 2 08:16:31 2024Under ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning Shift du 2 février 2024 La clé PA est resté enclenchée
hier. Il faut penser à la tourner
avant de partir (demande de Maher)
 Screenshot_2024-02-02_12-05-19.png 
  842   Tue Feb 6 08:52:28 2024 VC MJ KDUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning commissionning 8h45 demarrage machine

modulateur frigo ampli laser chiller
et cyclage des aimants
 7x 
  844   Thu Feb 8 08:31:19 2024 KD, HG, VC, RCUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 8 février 2024 8h20 : Mise en chauffe de la machine pour
shift de la journée

Charge Phase : 

Remarque
 RF_PiCanon.pngScreenshot_2024-02-08_11-41-09-BPMtldgbpm.02-lib0.2.png 
  846   Mon Feb 26 09:07:06 2024 VC, VK, VM, IC, NDUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning redemarage machine après élongation anneau 9H démarrage machine en mode linac

chauffage klystron ok

chiller ok
 scan_Laser_vs_RF_phase_2024_02_26_10_41.pngScreenshot_from_2024-02-26_12-13-46.png 
  847   Tue Feb 27 09:10:47 2024 KD, VK, VMUnder ProcessShift summaryRing Commissioning run du 27 février 2024 9h: mise en chauffe de la machine (chillers,
laser, aimants, modulateur)

Mohamed regle la cavité
  
  848   Wed Feb 28 08:49:30 2024 VC, VM, VKUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Commintionning RING demarrage machine 8H50

Alim

EL/PS/DPI.01 demarrage à
 health_check_2024_02_28_08_50.pngScreenshot_from_2024-02-28_11-47-13.pngScreenshot_from_2024-02-28_15-34-51.pngScreenshot_from_2024-02-28_16-50-50.png 
  850   Fri Mar 1 10:30:38 2024 VK, VM, ICUnder ProcessShift summaryRing | Ring Commissioning Recomissioning of the SR, search for the revolution frequency  8h50 Start of the machine

Laser amplifier was somehow OFF.
Very strange situation and not clear why
 13x 
  851   Fri Mar 1 10:39:04 2024 VK, VM, IC on Thu Feb 29 Under ProcessShift summaryRing | Ring Commissioning Recomissioning of the SR, search for the revolution frequency  Start of the machine 9h

Optimization of the beam transport
to the Ring.
 Screenshot_from_2024-02-29_12-15-58.pngScreenshot_from_2024-02-29_14-27-36.pngScreenshot_from_2024-02-29_11-27-21.png 
  853   Mon Mar 4 08:58:01 2024 Entered by Super Team from 134.158.195.141 on Mon Mar 4 08:57:45 2024Under ProcessShift summaryRing | Ring Commissioning Recomissioning of the SR, search for the revolution frequency  08h50 Start up of the machine

- Problem  with the vaccum,
the valves around the RF cavity are down.
  
  854   Tue Mar 5 15:10:32 2024 IC, VM, VKUnder ProcessShift summaryRing Commissioning Restart and tuning of the injector 10h Intervention to repair the water leakage.
It was repaired.

New problem with vacuum
 Screenshot_from_2024-03-05_15-13-48.png 
  855   Wed Mar 6 08:49:56 2024 IC, VM, VKUnder ProcessShift summaryRing Commissioning X-ray generation 8h50 Warming up the machine

10h start the beam

Tuning the injector
 Screenshot_from_2024-03-06_10-56-53.pngScreenshot_from_2024-03-06_17-18-12.pngScreenshot_from_2024-03-06_15-08-24.png 
  Draft   Thu Mar 7 08:58:28 2024 VK, VM, ICUnder ProcessShift summaryRing Commissioning Recomissioning of the SR, search for the X-rays 8h50 Warming up the machine

Problem with the vaccum around
the RF cavity (see screenshot attached).
 Screenshot_from_2024-03-07_09-02-36.png 
  857   Tue May 14 11:12:18 2024 ND, MEKUnder ProcessShift summaryRF D1 Conditionnement section 8:45 Impossible de passer le modulateur
en standby.

Probleme d'eau.
 condj1.pdf 
  861   Thu May 16 07:59:36 2024 KDUnder ProcessShift summaryLinac Commissionning Conditionnement section 16/05 8h: démarrage Klystron, frigo et
chiller
  
  862   Thu May 16 08:38:19 2024 MEK, RC,VC, VKUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 16/05 conditionnement démmare à
7.4 dB atténuation section ( ) pour
une largeur impulsion RF 1µs et fréquence
 vide_cond_16_may_.png 