ID Date Authordown Status Type Category Important Subject Icon Text Attachments
  893   Tue Jul 30 10:17:06 2024 M.O, M ELK, Hayg, SlavaUnder ProcessShift summaryLI | RF D1 Conditionnement section SC/ME/MO/VK/HG  signaux RF mesurés :

avec Oscillo :

orange
 Vide_Screenshot_2024-07-30_17-13-24.png 
  891   Fri Jul 26 10:12:42 2024 M.O, M ELK , Iryna, HaygNot FixedLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 26/07 signaux RF mesurés :

avec Oscillo :

orange
 0.1dB_2us_10Hz_16-41-51.png0.1dB_2us_10Hz_16-34-07.pn0.1dB_2us_10Hz_17-15.png 
  892   Mon Jul 29 09:34:57 2024 M ELK, Slava, Iryna, HaygUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 29/07 signaux RF mesurés :

avec Oscillo :

orange
 Interlock_Sec_0.2dB_10Hz_3µs_15_19.pngInterlock_Sec_0.2dB_10Hz_3µs_15_35.png 
  890   Thu Jul 25 09:15:25 2024 M ELK, SC, MO FixedLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 25/07 9h00 Mise en route modulateur

signaux RF mesurés :

avec Oscillo :
 0.7_dB_3µs_10Hz__13h04__claquage_réseau_HF.png0.3dB_3us_10Hz_16h35.png1dB_3us_10Hz_16h38.png 
  902   Fri Aug 16 10:25:08 2024 M ELKUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning validation de conditionnement 16/08 Vérification Pression SF6
=2.45 bar 

Vérification Températeure
 RF_signalsScreenshot_Redpitaya_0.1dB_3µs_25Hz__2024-08-16.pngRF_signalsScreenshot_scope_0.1dB_3µs_25Hz__2024-08-16.png 
  876   Thu Jun 6 08:29:19 2024 M EK, SC, ND, VCUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 6/06 8h20 : mise en chauffe de modulateur

start frigo et chiller section

Pression SF6 2.6 bar
 1100V_3us_10Hz_attsec_16dB.png1120V_3us_10Hz_attsec_16dB.png 
  866   Thu May 23 08:19:19 2024 M EK, ND, Iryna, VictorUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 23/05 8h15: set to standby Modulateur

démarrage frigo et chiller
section
 RF_signals_1.7dB_1µs_1HzAtt1dB_2us_1Hz_2024-05-23_14-51-45.pngScr_0.6_us_0.6_dB_2024-05-23_17-01-31.png 
  879   Tue Jun 11 08:44:30 2024 M EK, NDUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning claquage et test micros 8:30 impossible de mettre en chauffe modulateur

Pompe ThomX HS

Dalkia a été contacté
 6x 
  870   Wed May 29 08:47:44 2024 M EK, KD, DN, HGUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 29/05 8h45: set to standby Modulateur

start Frigo et chiller section

start cond. @ 1.4 dB ( Pis=18 MW)
 1dB_1us_5Hz_interlock.png 
  872   Fri May 31 08:08:56 2024 M EK, IC, DN, SC Under ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning   8h10 : Impossible de mettre en chauffe
le modulateur via IHM

En local également impossible
 6x 
  Draft   Fri Jun 30 13:14:30 2023 LS,NDUnder ProcessShift summaryRing run du 30 juin 2023 9:00 Warm up machine

10:40 Start the beam

10:50 Scan charge phase 
 health_check_2023_06_30_13_20.pngscan_charge_phase_min_280.0_max_320.0_10_54_10.png 
  752   Tue May 16 10:28:43 2023 LS, ND, IC, VKUnder ProcessShift summaryRing Commissioning Ring operation 16/5 9:33 Start warming up

9:45 Ducre is working on the plumbing
but it shuld not affect operations
 health_check_2023_05_16_12_02.pngscan_charge_phase_min_0.0_max_360.0_12_8_7.png2023-05-16_12_13_52_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_100.pngring_storage_quality__2023_05_16_16_06.png 
  756   Tue May 23 11:36:24 2023 LS, ND Shift summaryLI | Diag Prise de donnees 23/05 9:30 Demarrage machine

Fin installation Cerenkov + tests
MRSV
 IMG_20230523_110343_8_copy_780x1040-20230523-164911728-20230523-164911770.jpg 
  Draft   Thu Jun 29 13:09:57 2023 LS, NDNew SolutionShift summaryRing shift du 29 juin 2023 9:45 Git pull

Test des interfaces... OK

Probleme sur les ecrans du compte
  
  762   Wed Jun 7 16:02:33 2023 LS, MB, VC, NDReference SolutionShift summaryRing Programme prise de donnees 8/06 9:23 Mise en chauffe

Nombreux pb vide dans health check

Acces casemate pour verification
 health_check_2023_06_08_09_30.pnghealth_check_RF_2023_06_08_09_30.pnghealth_check_Vide_2023_06_08_09_30.pnghealth_check_Alimentation_2023_06_08_09_31.png 
  1245   Fri Jun 12 13:08:13 2026 Kevin D.Reference SolutionInfoLaser | Opt | Linac Commissionning Laser PC status mise à jours du post : https://elog.lal.in2p3.fr/THOMX/Commissionning/1188

** Laser PC ***

- Sortie Laser: 120 uJ 
  
  951   Thu Oct 31 08:19:25 2024 KDn Dupraz from 109.222.35.58 on Thu Oct 31 08:19:12 2024Under ProcessShift summaryRing Commissioning shift du 31 octobre 2024 8h15: mise en chauffe en remote (modulateur,
laser, chiller, Cycling)

Tuning of the linac and injection
 Screenshot_from_2024-10-31_13-37-11.pngScreenshot_from_2024-10-31_12-07-13.pngclosed_orbit_31102024.png 
  736   Wed Apr 19 14:47:58 2023 KD/CB Shift summaryLinac Commissionning run du 19 avril 2023 NB de Christelle
: pendant toute la durée de la manipe,
l'atténuateur section a été
 charge_phase__at_19-04-2023__16-39-28.jpg2023-04-19_19_12_41_li_dg_sst_01-ccd_01_RAW.png 
  907   Wed Sep 4 08:47:07 2024 KD-VM-VCUnder ProcessShift summaryLinac Commissionning shift du 4 septembre 2024 8h42 : mise en chauffe (Laser, modulateur,
chiller et cyclage aimants)

SF6 : 2.6bars
 TL_SST2_Screenshot_from_2024-09-04_17-27-45.png2024-09-04_17_29_44_tl_dg_sst_01-ccd_01_RAW.png2024-09-04_17_32_29_li_dg_sst_01-ccd_01_RAW.png 
  Draft   Wed May 28 17:29:56 2025 KD,VM,ICUnder ProcessShift summaryRing Commissioning   08h00 ThomX was started

Goals:
Emittance measurements, ring optics study
 EmittanceVsGunPhase.pngScreenshot_from_2025-05-28_11-28-14.png 