662
|
Fri Jan 6 09:17:54 2023 |
ND, IC, VK, VM | Under Process | Shift summary | Ring |
|
Prise de donnee 6/01 | |
9:15 Mise en chauffe modulateur
10:23 Temperature chiller incorrecte
11h Optilization of the beam for injection. Beam is unstable, what is seen fro, the x/y position trends in the TL. Then, from time to time the beam is not injected in the ring causing the jumps in the signal intensity ???
12h Hayg helped to find the good conditions and we started to inject in the ring but still with the not stable beam.
14h We try to store the beam by optimizing the parameters of the RF cavity => approaching the good storage. Suddenly the beam changed the parameters and we lost injection.
16h Trying to reestablish the injection and perform the optimization AGAIN
17h Difficult to restore the storage: beam from injector is not stable and therefore difficult to see the effect from the ring studies
18h After several studies, we found the proper RF frequency for current ring settings 500.4259 MHz
With ~20 kV obtained storage is about 15 ms measured with the additional electrode on the scope. Libera several times went down and had to be restarted.
The injection is not stable (intensity goes from 0 to max value), which makes it VERY DIFFICULT to optimize the beam storage in the ring. We added two QUAD (4 and 5) to our optimization routine.
After orbit correction the storage was 100 ms with ~20 kV RF and fRF = 500.404 MHz
Studies to be continued. More stable beam is requested from the injector.
19h30 Shift is finished.
|
| Attachment 1: Screenshot_from_2023-01-06_12-36-22.png
|
 |
| Attachment 2: Screenshot_from_2023-01-06_12-37-01.png
|
 |
| Attachment 3: Screenshot_from_2023-01-06_17-17-01.png
|
 |
| Attachment 4: Screenshot_from_2023-01-06_17-48-05.png
|
 |
| Attachment 5: Screenshot_from_2023-01-06_17-51-53.png
|
 |
| Attachment 6: Screenshot_from_2023-01-06_17-56-47.png
|
 |
| Attachment 7: Screenshot_from_2023-01-06_18-34-48.png
|
 |
| Attachment 8: Screenshot_from_2023-01-06_18-54-18.png
|
 |
| Attachment 9: Screenshot_from_2023-01-06_19-23-52.png
|
 |
|
664
|
Tue Jan 10 09:20:23 2023 |
KD, HG | Under Process | Shift summary | LI | TL | LE | Linac Commissionning |
|
shift du 10 janvier 2023 | |
9h: mise en chauffe modulateur, chiller, laser.
Vidange de la fosse
Plusieurs configurations ont été testées sur la section en terme d'atténations. Les valeurs Energie vs Phase seront rajoutées ultérieurement.
à une atténuation donnée correspond une valeur de phase qui maximise l'énergie et une qui minimise la dispersion en énergie. Les deux sont très proches (en théorie).
Nous resterons à 1.25 dB sur la section.
l'optimum pour le transport n'est pas encore trouvé. On parle bien d'optimum = transport max de charge avec un jitter faible.
Demain on continue, avec aussi un tour dans la LE et une mesure de charge sur la FC.
**** Programme ****
- Controler l'énergie du faisceau d'électron (sortie canon, sortie LIL) en fonction de l'atténuation
- Aller dans la LE (hier les dipoles DPE et EL/PS/DP fonctionnaient parfaitement)
|
| Attachment 1: E_phase_for_different_Att.png
|
 |
|
665
|
Wed Jan 11 15:15:30 2023 |
KD, HG | Under Process | Shift summary | LI | Linac Commissionning |
|
shift du 11 janvier 2023 | |
15h16 : Démarrage après chauffe de la machine
16h15 : Linac aligné et faisceau "stable" avant l'anneau (cf. courbes BPM), mais dérive (-3mm en X en 10 min sur TL/BPM.02).
énergie : 51MeV (mesure steerer TL/STR.01), 1.25dB (1090 V)
17h50 : Signal dans la FC de la LE -> Nicolas en ligne pour régler le timing de la FC
19h : fin de run : Il faut confirmer la valeur de la charque dans le Dump de la LE, et maximiser le transport. Jouer sur les 2 dernier quad de la TL pour optimiser le transport de la charge. Recettes sauvées. A voir la reproductibilité.
*** Programme ***
- Aller dans la LE, faire une mesure de signal FC
- sauver point de fonctionnement
- Investiguer la stabilité Linac VS phase RF (Canon et section) |
| Attachment 1: BPM_stable_16h18.png
|
 |
| Attachment 2: faisceau_TL_YAG3.png
|
 |
| Attachment 3: FC_Beam_OFF.png
|
 |
| Attachment 4: FC_BeamON.png
|
 |
|
Draft
|
Fri Jan 13 09:45:14 2023 |
ND/VK/IC/KD/HG/MJ | Under Process | Shift summary | |
|
Prise de donnee 13/01 | |
Mise en chauffe
9:45 Cyclage aimants
9:48 Demarrage |
| Attachment 1: scan_charge_phase_min_0.0_max_360.0_9_54_10.png
|
 |
| Attachment 2: scan_charge_phase_min_190.0_max_230.0_9_54_54.png
|
 |
| Attachment 3: 2023-01-13_09_58_47_li_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
|
 |
| Attachment 4: 2023-01-13_10_01_07_tl_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
|
 |
|
668
|
Fri Jan 13 17:25:33 2023 |
ND | Under Process | Anneau | Aimants |
|
Test cyclage aimants | |
17h25: Test de cyclage de
RI-C1/PS/QP.05
RI-C1/PS/QP.06
RI-C2/PS/QP.02
Resultats
RI-C1/PS/QP.05
RI-C1/PS/QP.06: Failed at 11% when magnet reached 10A => Ne pas cycler au dela de 9.4A
RI-C2/PS/QP.02: Failed at 11% when magnet reached 10A=> Ne pas cycler au dela de 8.5A |
|
669
|
Wed Jan 18 14:02:39 2023 |
IC | Under Process | Anneau | Aimants |
|
RE: Test cyclage aimants | |
I have decresed the Imax to 8 A and loaded the new cycling curves
RI-C1/PS/QP.06 and RI-C2/PS/QP.02: normally cycling with Imax 8 A , finish without error => PS to be checked for Imax >8 A (nominal 10 A
| ND wrote: |
|
17h25: Test de cyclage de
RI-C1/PS/QP.05
RI-C1/PS/QP.06
RI-C2/PS/QP.02
Resultats
RI-C1/PS/QP.05
RI-C1/PS/QP.06: Failed at 11% when magnet reached 10A => Ne pas cycler au dela de 9.4A
RI-C2/PS/QP.02: Failed at 11% when magnet reached 10A=> Ne pas cycler au dela de 8.5A
|
|
| Attachment 1: cylage_quad8A.png
|
 |
|
671
|
Mon Feb 13 09:48:33 2023 |
KD, VS, MJ, JN | Under Process | Shift summary | LI | TL | LE | Linac Commissionning |
|
shift du 13 février 2023 | |
9h20 : Mise en chauffe de la machine (modulateur, laser, frigo)
Mise sous SF6
L'interface caméra laser ne marche pas, l'erreur est :
MainThread INFO 2023-02-13 09:33:22,943 TaurusRootLogger: Using "PyQt4" for Qt
MainThread INFO 2023-02-13 09:33:23,029 taurus.qt.qtgui.icon.icon: Setting Tango icon theme (from /usr/local/lib/python2.7/dist-packages/taurus/qt/qtgui/icon/)
('------------ ', '/data/shared/Interfaces/panneaux/')
erreur avec le ds li/op/las.02
/data/shared/status/SST_calibration/_resolution.yml
Convertion possible : False
('', ['el/dg/sst.01-ccd.01', 'tl/dg/sst.01-ccd.01', 'tl/dg/sst.03-ccd.01', 'tl/dg/sst.02-ccd.01', 'li/dg/sst.01-ccd.01'], False)
SUFFIX
Traceback (most recent call last):
File "/data/shared/Interfaces/panneaux//Diags/interface_SST/controled_image.py", line 1389, in <module>
master = master_launch(Camera = argv[1],standelone = True)
File "/data/shared/Interfaces/panneaux//Diags/interface_SST/controled_image.py", line 1372, in master_launch
master = controled_image(dict_Camera_proxy_name[Camera], standelone = standelone)
File "/data/shared/Interfaces/panneaux//Diags/interface_SST/controled_image.py", line 133, in __init__
self.parametre_image = SST_Camera_Param(SST_station_name = Camera_Proxy_name,suffix = "", standalone = True)
File "/tmp_mnt/data/shared/Interfaces/panneaux/Diags/interface_SST/parametre_image.py", line 206, in __init__
self.has_BG_Led.setLedStatus(PyTango.DeviceProxy(change_groupe(self.SST_station_name,"BPM") + self.suffix).HasBackground())
File "/usr/local/lib/python2.7/dist-packages/tango/device_proxy.py", line 320, in __DeviceProxy__getattr
raise AttributeError(name)
AttributeError: HasBackground
10h30 : SF6 remplis
IHM caméra laser OK
18h01 : tout à freezé au niveau des IHM sauf l'horloge et le bouton du shutter. ==> Stop Machine
*** Problèmes :
- Température de régulation basse : relecture clarinette 19.9°C (Canon) et 17.8°C (section) pour consigne à 34.4°C (Canon) et 29.2°C (section) ==> résolu la relecture était fausse
- Le MPS est toujours en mode repos ==> problème résolue, le MPS est en mode normal. Un strap a été mis pour le premier Dipole afin de facilité le changement TL - LI
- Le compresseur est HS, grosse marre d'huile en dessous ==> pas de préssion d'air. Une bouteille est mise en attendant. Il faut refaire la pression régulièrement car il y a un fort débit consommé.
*** Nouveau point de fonctionnement :
- position laser Cathode initial (H = 4.576mm, V = 2.711)
- position laser à affiner (H = 4.63mm, V = 3.43mm)
- Le canon claque un peu. A 1090V (modulateur) la régule du canon doit etre de 32.35°C (à affiner à quelque 0.05°C près)
*** Programme :
1.Photo du courant d’obscurité, comparer avec les précédents, idéalement il faudrait une mesure du courant en fonction du gradient pour avoir une référence ==> Photo en P.J.
2.Charge phase sans toucher à l‘alignement laser, comparer, noter valeur (reprendre iris de 1.3 pour comparaison) ==> image en P.J. (fort courant, réduction à ~100pC pour le reste des manips)
3.Mesure de l’énergie sortie canon en fonction de la phase
(4.65 MeV à 120°) ==> le code n'est pas bon, seul qui marche : /tmp_mnt/data/shared/commissioning_scripts/MatLab/Steerer_Screen_thomx.m
ressort n'importe quoi : /tmp_mnt/data/shared/commissioning_scripts/MatLab/Steerer_Screen_thomx_dark.m
4.Reprise de l’alignement laser avec le BBA
5.Mesure de l’énergie sortie canon en fonction de la phase
6.Mesure des dimensions en fonction du soleno, si besoin reprendre alignement
7.Alignement (centre écran TL/SST1 avec premier steerer LI)
8.Chercher faisceau sur SST2 (sans quad)
9.Mesure energie steerer en fonction de la phase sur toute la gamme
10.Ajuster phase LIL pour min dispersion
11.Régler l’atténuation section pour Idip= 162.3A (retoucher la phase pour le min de dispersion),
12.Focaliser sur l’écran avec QP1/2/3 seulement
13.Prendre une série de mesure (image écran SST2) en fonction de la phase de la section dans la gamme possible de la largeur de l’écran (noté I dip pour chaque)
14.Se remettre à la dispersion en énergie minimale, acquérir une centaine d’image pour en extraire la stabilités en énergie
15.faire mesure des 3 gradients à 208A (plusieurs fois) en resserrant le range et le nombre de points
16.Se mettre à la valeur de soléno et de iris fixé par les simulation pour le transport
17.Refaire 3 gradients plusieurs fois
18.Appliquer le transport, corriger l’orbite avec la TL si nécessaire
19.Noter les dimensions et comparer à ce qui était prévu
|
| Attachment 1: 2023-02-13_17_02_53_initial_VCathode_RAW.png
|
 |
| Attachment 2: 2023-02-13_16_47_18_courant_obscurite_RAW.png
|
 |
| Attachment 3: charge_phase__at_13-02-2023__17-05-06.jpg
|
 |
| Attachment 4: charge_phase__at_13-02-2023__17-27-57.jpg
|
 |
|
681
|
Thu Feb 16 11:31:36 2023 |
MJ, HG | Under Process | Shift summary | Linac Commissionning |
|
Faisceau LI/TL | |
Phase Qmax : 300 degres
--> Phase Emax = 250
Scan taille faisceau sur Yag_LI vs soleno
Données : /data/shared/Commissioning_tools/Mesure/20230216/Soleno_YagLI/
Intervention sur les BPMs
les bpm Li et tl1 ne fonctionne pas ; Rien de bouge quand on met des steerer et ils saturent completement
Nicolas intervient
Mesures alignement dans la section
on varie la phase dans la section et on mesure l'orbite (BPMs)
1) allignement LIL
fichiers : LI_STR_1H-2.11_LI_STR_1V-0.0_LI_STR_2H1.34__LI_STR_2V-0.0
2) Aligbnement 1 seul steerer
fichiers : LI_STR_1H-1.27_LI_STR_1V0.35_LI_STR_2H-0.0__LI_STR_2V-0.0
3) Alignement 2 steerers
fichiers : LI_STR_1H-2.11_LI_STR_1V-0.0_LI_STR_2H0.72__LI_STR_2V0.36
Mesures tailles TLSST1 vs Soléno
Soleno_YagTL_Section_Allignee
Soleno_YagTL_HaygAlign --> 1 steerer LI
Soleno_YagTL_KevAlign --> 2 steerer LI (KeV)
on part de 50 -> 250 (fig2)
Soleno_YagTL_CBAlignVeille --> 1 steerer LI (CB)
très peu différent de Kev Align.
Pour le moment les 2 ne collent pas bien à Astra. Comparaison a venir et affiner.
|
| Attachment 1: solenoscan11h25.png
|
 |
| Attachment 2: solenoscan13h18.png
|
 |
| Attachment 3: solenoscan13h29.png
|
 |
|
687
|
Mon Feb 20 08:30:57 2023 |
KD, MJ, HG | Under Process | Shift summary | LI | TL | LE | Vide | Linac Commissionning |
|
shift du 20 février 2023 | |
8h30 : Mise en chauffe de la machine (frigo, chiller, laser, modulateur)
fosse vidée + circuit d'eau re-remplis
problème jauge vide : pas de relecture (IHM canon et IHM vide)
14h : début du shift
phase ch max 287° valeurs BPM avant solénoid : xbpm=1mm, ybpm=0.7mm, charge max : 125pC
-50 de phase pour energie max (237°) isol 220A, Position BPM LI : xbpm=1.7mm ybpm=1mm
Mesure énergie avec calibration (K. Dupraz) écran du jour 4.6MeV
*** Passage section Solénoide 190A, atténuateur 1.48dB, phase section 110° :
- Alignement sur QP1 et QP3 : LI/STR1-H = -1.22A, LI/STR1-V = 0.47A, TL/STR1-H = -6.4A, TL/STR1-V = 0A
- Mesure énergie avec calibration (K. Dupraz) écran du jour 50.6MeV
- Quand tous les QP sont à 0A mesure Position TL/BPM01 : xbpm = -0.3mm, ybpm = -0.1mm (cf. screenshot)
- Quand QP1 = -0.9A, QP2 = +4.2A, QP3 = -3.7A (cf. recette du vendredi 20230217) mesure position TL/BPM01 : xbpm = -0.3mm, ybpm = -0.15mm (cf. screenshot + photo)
*** Passage dans la TL, TL/DP 159.3A, attenuation section 1.48dB, phase section dispersion min 107° :
- ralignement axe sur QP1 QP3 à 107° : LI/STR1-H = -1.17A, LI/STR1-V = 0.42A, TL/STR1-H = -5.2A, TL/STR1-V = 0A
- Solénoide à 223A (cf. shift vendredi 17 février) :
- QP4 est déjà aligné en vertical (position TL/BPM02, xbpm = 2mm, ybpm = 0.6mm)
- Alignement moyen QP5 à QP7 avec les courants de QP4 à QP7 du shift de vendredi 17 février, TL/STR2-V = -3A, TL/STR2-H = 0A
*** reprise de l'énergie section (1.50dB) pour centré sur TL/BPM02 ==> Ok pour injection (cf. screenshot)
==> recette sauvegardé sous : recipe_recipe_TL_good_20230220_17_07_34.txt
En fin de shift reprise de l'atténuation section pour garder à 0bpm le faisceau (1.48dB)
***** Le faisceau a sauté tout le temps du shift (cf Screenshot_BPMs_Trend_from_2023-02-20_18-14-59.png) ==> Des Mesures BPMTL2 et PIC redpyt ont ete faites.
- A mettre en forme pour voir si ya une correlation.
- Memes mesures a faire avec oscillo au lieu du redpy |
| Attachment 1: quad1_3_zero.png
|
 |
| Attachment 2: recette_20230217_quad1_3.png
|
 |
| Attachment 3: 2023-02-20_15_29_20_tl_dg_sst_01-ccd_01_RAW.png
|
 |
| Attachment 4: injection_RING_recette_20230220_17_07_34.png
|
 |
| Attachment 5: Screenshot_BPMs_Trend_from_2023-02-20_18-14-59.png
|
 |
|
Draft
|
Mon Feb 20 10:16:18 2023 |
ND | Under Process | Shift summary | LI | TL | LE | Vide | Linac Commissionning |
|
RE: shift du 20 février 2023 | |
Healthcheck signal effectivement un probleme sur toute les vannes... Et les atkpanels signalent un problème de communi
| KD wrote: |
|
8h30 : Mise en chauffe de la machine (frigo, chiller, laser, modulateur)
fosse vidée + circuit d'eau re-remplis
problème jauge vide : pas de relecture (IHM canon et IHM vide)
|
|
| Attachment 1: Capture_d’eÌcran_2023-02-20_aÌ€_10.15.37.png
|
 |
|
689
|
Mon Feb 20 10:19:56 2023 |
ND | Under Process | Shift summary | LI | TL | LE | Vide | Linac Commissionning |
|
RE: shift du 20 février 2023 | |
Healthcheck signal effectivement un probleme sur toute les vannes... Et les atkpanels signalent un problème de communication... Est-ce que l'expert correspondant a été prévenu?
| KD wrote: |
|
8h30 : Mise en chauffe de la machine (frigo, chiller, laser, modulateur)
fosse vidée + circuit d'eau re-remplis
problème jauge vide : pas de relecture (IHM canon et IHM vide)
|
|
| Attachment 1: pb_vide_hc.png
|
 |
| Attachment 2: pb_vide_atk.png
|
 |
|
692
|
Tue Feb 21 12:41:58 2023 |
ND, VK, VM, MJ | Under Process | Shift summary | LI |
|
Shift 21/2 | |
12:20 Mise en chauffe modulateur
13:44 Scan charge phase OK
Note: TL-V2 est fermee...
13:58 Chargement recette good_20230217_13_09_42
Pb vanne resolu
14:08 Temperature chiller elevee!
Chargement des valeurs de https://elog.lal.in2p3.fr/THOMX/Commissionning/687
Reglage de la machine par Marie
Scan emittance
Recette aligement dans les quads du linac sauvee dans Li+TL: good_20230221_15_37_29
17:58 Arret machine
Update: Emittance measurements postprocessing made by Victor are in the attached powerpoint document. Preliminary conclusion: bad emittance could be due to some problems in the photoinjector gun. |
| Attachment 1: scan_charge_phase_min_0.0_max_360.0_13_43_30.png
|
 |
| Attachment 2: scan_charge_phase_min_260.0_max_300.0_13_44_14.png
|
 |
| Attachment 3: health_check_2023_02_21_14_03.png
|
 |
| Attachment 4: quad_scan_tl_dg_sst.01_20230221_16_4_5-8_x.png
|
 |
| Attachment 5: Quad_scan_21.02.2023.pptx
|
|
Draft
|
Thu Feb 23 10:08:35 2023 |
ND, VK, VM | Under Process | Shift summary | Ring Commissioning |
|
Shift 23/2 | |
9h22 mise en chauffe
Pb site elog; autres sites web OK
Health check OK
10:00 Cyclage aimants 0K
10:59 Demarrage
12:00 Emittance scan
Transport beam through TL. Attenuator 1.6dB. Check that beam is similar in simulation and on the screens.
Beam image at each screen station for current transport (images to attach).
Transport till ring with nominal TL optics. All charge is transported.
Check dispersion to be nonzero for later compensation in dpi and septum.
TL QP5 changed to from 2.2 to 1.5. Impoved injection stability, this value is far from; the theoretical one. to be studied.
Optimisation of injection with RCDS.
Undure curernt conditions beam SPX = 2 and SpY = 1 @ ric1 / BPM.02 stable.
Libera 4 freezed. Restart did not helped to recover BPM05-Lib04; Others after restart working well. Sever restart with astor solved the problem.
Saved data to reconstruct orbit
17:00 Arrêt machine
|
| Attachment 1: health_check_2023_02_23_09_27.png
|
 |
| Attachment 2: scan_charge_phase_min_0.0_max_360.0_11_9_18.png
|
 |
| Attachment 3: scan_charge_phase_min_260.0_max_300.0_11_10_2.png
|
 |
| Attachment 4: Screenshot_from_2023-02-23_17-16-26.png
|
 |
| Attachment 5: Screenshot_from_2023-02-23_17-16-16.png
|
 |
| Attachment 6: ring_vars_2023_02_23_17_14.png
|
 |
| Attachment 7: Screenshot_from_2023-02-23_17-06-26.png
|
 |
| Attachment 8: Screenshot_from_2023-02-23_16-31-06.png
|
 |
| Attachment 9: Screenshot_2023-02-24_at_14.26.46.png
|
 |
|
704
|
Mon Mar 6 09:09:52 2023 |
VC | Under Process | Problem | Linac Commissionning |
|
pB synchro suite | |
Test des signaux de "Timing" en calle de controle
1- la communication avec l'IHM admin_delays est instable à chaque commande, l'IHM "plante" et je suis obligé de la fermer et de relancer pour pouvoir changer de valeur de retard et ou plus d'1 mn pour pouvoir à nouveau changer de valeur!
2- en sdc le signaux de "timing" sont en phase (DEG 1=> 4 2=>4 3=>4 sdev 140ps) avec une fréquence anneau de 500MHz (rappel fréquence linac 2998.55MHz)
3- changement de la fréquance anneau 500.5MHz (dans l'igloo... je n'ai pas acces au scryp en salle de controle) pas de changement de comportement (sdev 140ps) (fin de manip retour à 500MHz)
pB resolu:
c'est une perturbation de la PLL*24 dans la trigger box => elle doit renvoyer du bruit à travers le 3GHz dans ERL 1 à travers le mélangeur.
nous avons déconnecté (alimentation) la PLL.
|
|
705
|
Mon Mar 6 11:09:50 2023 |
MO VC | Under Process | Linac | Linac Commissionning | Ring Commissioning |
|
Commitionning | |
10 H demarrage chauffage modulateur et chillers (le pc modulateur était planté => Maher l'a redémarré)
11h20 chauffage Klystron terminé
pause repas
|
|
709
|
Thu Mar 9 00:55:10 2023 |
ND, Sandry Wallon | Under Process | Shift summary | Diag |
|
Programme prise de donnée 9/03/2023 | |
9h15 Les stations etaient laissees ouvertes
9h15 Mise en chauffe modulateur
9h30 PSS gele => Appel MO
10h15 PSS gele. MO non joignable=> Appel PCR.
10h30 Intervention PCR => PSS redemarre => Vannes et gauge du linac en erreur (pression a 10-3mbar)
10h45 Appel groupe Vide => Intervention Bruno Mercier (pb coupure courant ; au retour du courant, toutes les alim ne se remettent pas en fonctionnement) ; retour au vert après acquitemment sur MPS
10h51 : nombreuses erreurs dans health check
11h05 : Perte adresse IP icepaps ? => Alim icepaps off puis on ;
11h30 : Pb health check résolu
12h00 : phase réglée à 1 deg
15h00 Analyse stabilite BPM linac
16h45 Faisceau dans TL
Mesure position vs TL/DP.01
18h05 Stop ThomX
===
Programme de la prise de donnée:
1) Démarrage du faisceau, transport dans TL et si possible EL
2) Mesure bruit sur chaque BPM: acquisition avec faisceau stable, comparaison avec écran
a) LI+TL ligne directe
b) LI+TL+EL
3) Même mesure avec variation de la charge
a) Gain contrôlé manuellement
b) Changements de gain automatique
4) Mesure de la position mesurée en fonction du courant dans TL/PS/DP.01
5) Mesure de la position mesurée en fonction du courant dans les actuateurs de la TL puis du linac |
| Attachment 1: health_check_2023_03_09_10_51.png
|
 |
| Attachment 2: health_check_2023_03_09_11_30.png
|
 |
| Attachment 3: scan_charge_phase_min_20.0_max_60.0_12_2_35.png
|
 |
|
715
|
Tue Mar 14 12:10:25 2023 |
KD, SC | Under Process | Shift summary | LI | Laser | Linac Commissionning |
|
shift du 14 mars 2023 | |
12h10 : mise en chauffe modulateur + frigo/chillers
La cavité est intervenu le matin sur le laser CFP.
Viktor doit faire des mesures avec Ronic dans l'après midi pour améliorer le signal de la photodiode/PMT laser Photocathode.
Faisceau en main de Christelle et Sophie l'après midi.
14h Préparation des mesures du signal de la photodiode (VS, RC)
16h fin de la mesure du signal photodiode. Installation du phototube demain matin (VS)
Démarrage faisceau, scan charge phase
HT = 1090V, Att canon = 0DB, Att section = 1.92 dB, consigne canon = 31.75°, consigne section = 29.20°
COL2 = 225 A, COL1 = 65.02 A
Iris 1.3mm, Charge = 110 pC environ, phase = 240, Attenuation laser = 320
16h30 Chargement recette best injection du 1er mars pour la partie TL sans injection
Energie mesurée [52,47.9,51.88,52.25] MeV
Tests sur TL/PS/STR.01-V.01
Arret machine : 17h27
|
|
718
|
Thu Mar 23 15:15:56 2023 |
SC | Under Process | Problem | CC |
|
Tests CC apres re-démarrage | |
15h16 redémarrage de client 3
Problème avec le commutateur de la baie en salle de controle (celui qui gère les badges), action en cours pour le changer, Nouveau commutateur : thomx baie38-3, RES505
Client 1 ok
Client 2 ok
Client 3 ok
Client 4 ok
Client 5 ok
15h48 : Automate de la baie 5 ne redémarre pas
16h27 : Toujours pas d'automate dans la baie 5
ticket envoyé à CC pour savoir comment on fait quand le ping de automate-b5.thomx.fr donne un Destination Host Unreachable
16h50 Re-démarrage des serveurs pour essayer de relancer l'automate et arret des diags
17h25 Toujours pas d'automate b5, diags à l'arret
A suivre demain |
|
719
|
Fri Mar 24 08:52:49 2023 |
SC/JNC/VC | Under Process | Problem | CC |
|
Redémarrage ThomX | |
8h53 Serveur DNS et DHCP non redémarré, ping ne fonctionne pas, en attente d'une solution
Re-démarrage automate et cpci (JNC)
14h13 ping sur automate ok
15H
er/sy/rac.17-elr.01-rdp.03 dans IHM healthckeck remarrage impossible .. dans astor
Remise en route synchro et camera (ND)
Re-démarrage de tout dans astor
Reste à regarder : er/sy/rac.14-elr.01-rdp.03 en server off qui refuse de se mettre on
Allumer le laser photocathode.
pompage vide pompe ionique prévu pour lundi, pas de faisceau lundi. |
| Attachment 1: ping_automate.png
|
 |
| Attachment 2: camera_lidgsst.01.png
|
 |
| Attachment 3: rf_gun_ihm.png
|
 |
| Attachment 4: srv4_astor.png
|
 |
| Attachment 5: redpitaya_ihm.png
|
 |
|
720
|
Mon Mar 27 13:55:41 2023 |
Entered by Super Team from 134.158.195.141 on Mon Mar 27 13:55:24 2023 | Under Process | Info | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Etat ThomX | |
Cavité FP a terminé son intervention
Mise sous vide possible cette après-midi
14h Intervention IHM cavité RF
14h04 Fermeture casemate
Interruption possible pour mettre demi-anneau sous vide
Etude IHM cavité RF en cours (PG, ME)
14h45 Mise sous vide demi anneau, ouverture casemate
16h Fin d'intervention du vide, pompage turbo en cours
|