Thu Nov 28 08:19:05 2024 |
VM, IC, VK | Under Process | Info | Ring Commissioning |
|
| |
08h18 Start ThomX
10h00 HV is 'ON'
10h35 RF Gun phase is 174 dg. Section Phase is 209 dg. Sect. Att. is 2.70 dB TL/BPM2 X=0, Charge is -127 pC
Linac steerers H [2.66 -4.46], V [-2.00 2.41]
10h40 Start Ring RF 100 kV, TL/BPM2 X=0,5 mm
Ring Studies
12h30 Stop HV and ring RF
12h40 Access: JN went to exchange the shunt resistors
13h26 HV iand ring RF are 'ON'
15h18 RF Gun phasee is 178 dg., Sect. phase is 215 dg.
18h10 Stop ThomX
|
|
969
|
Wed Nov 27 08:04:44 2024 |
VC | Under Process | Shift summary | Linac Commissionning |
|
Shift summary 27/11 | |
8h : mise en chauffe (laser, modulateur, frigo, chiller, cyclage)
9H30 y'a eu une intervention non signalée dans les fosses toutes les rondes sont tombées! (Maher referme)
recette # operation_feedback_et_LE 20241126_17_43_31(faisceau non centré sur TL/QP.01)
Q max ICT1 120pC (att 340 iris 1.3mm)
Phase Emax 178°
Phase section 209°
Esectionkin 51.25MeV
Recette Operation_500_0913MHz241116_10_07_15
test quad scan
le soft matlab QP1_TLSST1_thomx_dark_dim n'est pas fiable
=> nouveau script python Quad scan (dans commintionning scrits\linac\aimants )
Isoleno : 220 et 235A : data à analyser
Test aimant néodynium sur tube faisceau :
Qmax pas de soléno pas de steerer
mesure 1
sans aimant
------ YAG Max proj. Pixels -----
YAG X : 503.4 +/- 0.48989794855663565
YAG Y : 314.5 +/- 2.29128784747792
------ BPMs en mm -----
BPM X : 1.8827291000000002 +/- 0.058164067948261663
BPM Y : 0.44133750000000005 +/- 0.021049867535212655
On a vérifé la deviation du faisceau avec l'aimant placé sur la bride avec COL2. trop puissant mais on a le principe. |
| Attachment 1: QP1_scan.png
|
 |
| Attachment 2: QP2_scan.png
|
 |
| Attachment 3: QP3_scan.png
|
 |
|
Draft
|
Tue Nov 26 07:53:39 2024 |
MJ RC KD | Under Process | Shift summary | Laser | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 26 novembre 2024 | |
8h : mise en chauffe en remote (laser, modulateur, frigo, chiller, cyclage)
10h48 : mise en route du feedback sur l'injection dans la section (1essai = erreur de signe sur le signal d'erreur), 2e essai (1min plus tard) semble ok, on laisse le feedback pour la stat.
Remarques :
** Kicker d'extraction instable. (extraction après stockage ok), sans steerer
** faisceau de rayons-X bouge en fonction de la phase e-/laser CFP
*** Programme ***
* mise en place feedback injection linac
10h48 : mise en route du feedback sur l'injection dans la section (1essai = erreur de signe sur le signal d'erreur), 2e essai (1min plus tard) semble ok, on laisse le feedback pour la stat.
Avec feedback injection linac position bpm et charge beaucoup plus stables (data dans repertoire TRENDS)
* trend de flux avec asservissement du pointé d'injection
(fait vers 13h30, data a retrouver dans le trend generale fluo_diode ...)
* affinement de la position du 0 du faisceau X et mesure spectre angulaire
Fait
Spectres acquis:
** Avec ecran fluo dans le faiscau (ca ne saturait donc pas, mais spectres tres elargiS par diffusion multiples)
** Ecran fluo retracte + desynchronisation pour ne pas que le det Amptek CdTe sature
spectre enregistres
* prise d'une image du faisceau de rayons X
Fait
Remarques :
** Kicker d'extraction instable. (extraction après stockage ok), sans steerer
** Le centre du faisceau de rayons X bouge de plusieurs centimetres (sur la camera dans la X-hutch) en fonction de la phase e-/laser CFP
|
| Attachment 1: 2024-11-26_12_22_06_el_dg_sst_01-ccd_01_RAW_1.png
|
 |
|
967
|
Fri Nov 22 11:18:28 2024 |
KD, RC | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
shift du 22 novembre 2024 | |
9h30 : mise en chauffe
intervention casemate pour alignement laser et nettoyage optique.
11h : démarrage, charge énergie max 100pC pour atténuateur à 330pas, phase 187°
On charge la recette et on règle le linac (energie et phase); position TL/BPM.02 à 0, et min de dispersion (tout allumé)
11h34 : stockage immédiat dans l'anneau ! C'est TOP !
Après midi compliqué pour trouver les rayons-X et avoir un cavité stable.
synchronisation X :
* delay 33MHz/Trig ~ 2-4ns
* phase 500MHz CFP: 6.45V
prise de spectres X :
* déplacement du faisceau de rayonx X (à gauche et en bas) du à la nouvelle orbite
* spectro déréglé + trop de flux (saturation de l'acquisition)
Mise en place d'un "asservisement" du pointé d'injection dans l'anneau. Semble bien fonctionner (cf. screenshot), meme avec des variations d energie etc. Script dans : data/shared/commissioning_scripts/Linac/Alignements
18h30 : Stop ThomX
*** Programme prochain ***
* trend de flux avec asservissement du pointé d'injection
* affinement de la position du 0 du faisceau X
* mesure spectre angulaire
* prise d'une image du faisceau de rayons X
|
| Attachment 1: TL_BPM4_locked.dat
|
|
966
|
Fri Nov 22 11:04:39 2024 |
KD | New Solution | Linac | LI |
|
laser PC | |
Mesure de ce matin et réalignement:
sortie laser : 298uJ
sortie ligne de transport : 209uJ
sortie iris 1.3mm: 80uJ
Injection canon: 60uJ@420pas
voir image faisceau |
| Attachment 1: 2024-11-22_11_07_23_li_op_las_02_RAW.png
|
 |
| Attachment 2: 2024-11-22_11_07_57_li_op_las_02_RAW.png
|
 |
|
965
|
Thu Nov 21 08:27:15 2024 |
VM Entered by Super Team from 134.158.195.141 on Thu Nov 21 08:26:43 2024 | Under Process | Info | Ring Commissioning |
|
| |
08H25 Start ThomX
09H45 HV is 'ON'
09h49 Breakdown in the RF Gun
09h45 Restart HV
Linac steerers H [2. 66 -4.45]; V [-2.00 2.31]
RF Gun Phase is 223 dg. Att. is 0.0, Charge is -84 pC, Sect. Phase 193 dg., Att. is 2.6 dB TL/BPM02 X 1mm
10h35 Ring Injection
11h00 Change RF to 500.0913
Tune 0.17
11h35 RF Gun Phase is 228 dg. Att. is 0.0, Charge is -50 pC, Sect. Phase 196 dg., Att. is 2.65 dB TL/BPM02 X 1mm
There was problem with section temperature. Fixed, Phases adjusted.
12h40 RF Gun Phase is 227 dg. Att. is 0.0, Charge is -40 pC, Sect. Phase 201 dg., Att. is 2.70 dB TL/BPM02 X =0 mm
17h15 STOP THOMX |
|
964
|
Tue Nov 19 08:20:29 2024 |
MJ VC KD RC DN | Under Process | Shift summary | Linac Commissionning |
|
Shift summary 19/11/2024 |
|
8h20 demarrage machine
iris 1.3mm
att 440
phase Qmax 280 110pC
QEmax 90pC Ekin 4.6MeV Etot 5.1MeV
arret pour cause d'alarme sf6 sur le MPS - cle thomx 0 pour verif pression : 2.4 mBar
Redemarrage
ph ch max 273
ph energie max -50
Recette 20241115_16_28_32
passage section
passage dipole - phase section disp min 207
Mesure energie YagTL1 Ekin=51.0
Faisceau sur Yag_TL3
Injection anneau
Relock de la cavite apres changement freq cavite RF
IP retrouvee - scan FPC pour mesure taille electrons : le flux X voit les kicks faisceau
Data a mettre en mode presentable ...
fin de shift 18h30
|
| Attachment 1: YAG_TL3_beam.png
|
 |
| Attachment 2: injection_ring.png
|
 |
| Attachment 3: Fluo_det.png
|
 |
|
963
|
Fri Nov 15 12:13:42 2024 |
Entered by Nicolas Delerue from 134.158.195.144 on Fri Nov 15 12:13:26 2024 | Not Fixed | Info | TL |
|
Charge excess in the TL | |
By looking at the BPM transmission tool one can see that there is more charge on TL/BP.03 than on TL/BPM.02 (see attached image).
The BPM seetings have been checked and they are similar.
One can see a similar effect when comparing TL/ICT.01 and TL/ICT.02.
Possible interpretation: the beam is scrapping the beam pipe and creating a shower of secondaries. |
| Attachment 1: Screenshot_from_2024-11-15_12-12-55.png
|
 |
| Attachment 2: Screenshot_from_2024-11-15_12-12-46.png
|
 |
|
Draft
|
Fri Nov 15 07:56:03 2024 |
IC, VK, VM, ND | | Shift summary | |
|
Ring studies, MRSV | |
07h50 Start ThomX
09h20 HV is 'ON'
09h25 HV 1215 V
09h52 RF Gun phase 234 dg. Att. 0.0 dB, Charge -110.0 pC; Sect. phase 208 dg., Att. 2.566 dB, TL/BPM2 X +2 mm
10h00 injection to the ring TL/BPM2 X -2 mm
10h02 Ring RF 100 kV
Today compared to yesterday shift the synchrotron oscillation amplitude is very unstable. Phase ? To be investigated.
First beam imaging with the MRSV.
BBA studies
Horizontal plane
BPM3 (BPM.04-Lib.03) dX=1.1 mm
BPM9 (BPM.04-Lib.05) dX=0.8 mm
BPM5 (BPM.06-Lib.04) dX=0.2 mm
BPM11 (BPM.06-Lib.05) dX=-0.3 mm
BPM4 (BPM.05-Lib.04) dX=-0.3 mm
BPM10 (BPM.05-Lib.05) dX=1.2 mm
Set offsets on X in Liberas (OffX)
BPM.01-Lib.03, 130000+1800000 = 1930000
BPM.02-Lib.03, 70000+400000 = 470000
BPM.04-Lib.03, 40000+1100000 = 1140000
BPM.06-Lib.04, 30000+200000 = 230000
BPM.03-Lib.03, 60000+100000 = 160000
BPM.05-Lib.04, 130000-300000 = -170000
BPM.01-Lib.04, 300000+400000 = 700000
BPM.02-Lib.04, 70000+200000 = 270000
BPM.05-Lib.05, 140000+1200000 = 1340000
BPM.06-Lib.05, -20000-300000 = -320000
BPM.04-Lib.04, -50000+800000 = 750000
BPM.03-Lib.03, 60000+100000 = 160000
Vertical plane
BPM12 ri-c1/dg/bpm.01-lib.03 dY = -2.4 mm
BPM1 ri-c1/dg/bpm.02-lib.03 dY = - 0.1 mm
BPM2 ri-c1/dg/bpm.03-lib.03 dY = - 0.5 mm
BPM3 ri-c1/dg/bpm.04-lib.03 dY = -0.2 mm
BPM4 ri-c1/dg/bpm.05-lib.04 dY = -1.0 mm
BPM5 ri-c1/dg/bpm.06-lib.04 dY = - 0.7 mm
BPM6 ri-c2/dg/bpm.01-lib.04 dY = - 1 mm
BPM7 ri-c2/dg/bpm.02-lib.04 dY = - 0.1 mm
BPM8 ri-c2/dg/bpm.03-lib.05 dY = -0.3 mm
BPM9 ri-c2/dg/bpm.04-lib.05 dY = -0.6 mm
BPM10 ri-c2/dg/bpm.05-lib.05 dY = + 0.3 mm
BPM11 ri-c2/dg/bpm.06-lib.05 dY = +0.5 mm
Set offsets on Y in Liberas (OffY)
BPM12 ri-c1/dg/bpm.01-lib.03 dY_new = -300000 -2.4 mm = -2700000
BPM1 ri-c1/dg/bpm.02-lib.03 dY_new = - 10000 - 0.1 mm = -110000
BPM2 ri-c1/dg/bpm.03-lib.03 dY_new = 105000 - 0.5 mm = -395000
BPM3 ri-c1/dg/bpm.04-lib.03 dY_new = 190000 -0.2 mm = -10000
BPM4 ri-c1/dg/bpm.05-lib.04 dY_new = - 110000 -1.0 mm = -1110000
BPM5 ri-c1/dg/bpm.06-lib.04 dY_new = -100000 - 0.7 mm = -800000
BPM6 ri-c2/dg/bpm.01-lib.04 dY_new = -20000 - 1 mm = -980000
BPM7 ri-c2/dg/bpm.02-lib.04 dY_new = 150000 - 0.1 mm = 50000
BPM8 ri-c2/dg/bpm.03-lib.05 dY_new = 0 - 0.3 mm = -300000
BPM9 ri-c2/dg/bpm.04-lib.05 dY_new = - 90000 -0.6 mm = -690000
BPM10 ri-c2/dg/bpm.05-lib.05 dY_new = 70000 + 0.3 mm = 370000
BPM11 ri-c2/dg/bpm.06-lib.05 dY_new = 10000 +0.5 mm = 510000
Studies in single trigget mode. See screenshots.
Beam is stored (sligth decay) in the ring around 15 minutes without touching anything. This opens way for beam dynamics studies and for better understanding of machine. Need to find a way to have diagnostics data (trigger only diag) in such mode.
17h50 Stop ThomX
|
| Attachment 1: Screenshot_from_2024-11-15_17-28-09.png
|
 |
| Attachment 2: Screenshot_from_2024-11-15_17-14-46.png
|
 |
| Attachment 3: Screenshot_from_2024-11-15_17-14-38.png
|
 |
| Attachment 4: Screenshot_from_2024-11-15_17-13-08.png
|
 |
| Attachment 5: Screenshot_from_2024-11-15_17-12-53.png
|
 |
| Attachment 6: Screenshot_from_2024-11-15_17-10-09.png
|
 |
| Attachment 7: Screenshot_from_2024-11-15_17-10-00.png
|
 |
| Attachment 8: Screenshot_from_2024-11-15_17-06-09.png
|
 |
| Attachment 9: Screenshot_from_2024-11-15_17-04-24.png
|
 |
| Attachment 10: Screenshot_from_2024-11-15_16-43-47.png
|
 |
| Attachment 11: Screenshot_from_2024-11-15_16-42-08.png
|
 |
| Attachment 12: Screenshot_from_2024-11-15_16-41-59.png
|
 |
| Attachment 13: Screenshot_from_2024-11-15_16-40-52.png
|
 |
| Attachment 14: Screenshot_from_2024-11-15_16-40-44.png
|
 |
| Attachment 15: 1HzOscScreenshot_from_2024-11-15_16-32-30.png
|
 |
| Attachment 16: Screenshot_from_2024-11-15_17-33-43.png
|
 |
| Attachment 17: Screenshot_from_2024-11-15_17-33-35.png
|
 |
| Attachment 18: Screenshot_from_2024-11-15_17-28-09.png
|
 |
| Attachment 19: Screenshot_from_2024-11-15_17-14-46.png
|
 |
| Attachment 20: Screenshot_from_2024-11-15_17-14-38.png
|
 |
| Attachment 21: Screenshot_from_2024-11-15_17-12-53.png
|
 |
| Attachment 22: Screenshot_from_2024-11-15_17-10-09.png
|
 |
| Attachment 23: Screenshot_from_2024-11-15_17-38-16.png
|
 |
| Attachment 24: Screenshot_from_2024-11-15_12-12-55.png
|
 |
| Attachment 25: Screenshot_from_2024-11-15_12-12-46.png
|
 |
| Attachment 26: Screenshot_from_2024-11-15_12-11-23.png
|
 |
| Attachment 27: Screenshot_from_2024-11-15_12-03-43.png
|
 |
| Attachment 28: Screenshot_from_2024-11-15_11-55-01.png
|
 |
| Attachment 29: Screenshot_from_2024-11-15_11-52-36.png
|
 |
| Attachment 30: Screenshot_from_2024-11-15_11-47-59.png
|
 |
| Attachment 31: Screenshot_from_2024-11-15_11-47-39.png
|
 |
| Attachment 32: Screenshot_from_2024-11-15_11-21-31.png
|
 |
| Attachment 33: Screenshot_from_2024-11-15_11-16-37.png
|
 |
| Attachment 34: Screenshot_from_2024-11-15_10-59-46.png
|
 |
| Attachment 35: Screenshot_from_2024-11-15_17-35-21-2.png
|
 |
| Attachment 36: Screenshot_from_2024-11-15_17-36-04-2.png
|
 |
|
961
|
Thu Nov 14 09:21:51 2024 |
Entered by Viktor Soskov from 134.158.195.153 on Thu Nov 14 09:21:36 2024 | Fixed | Info | Laser |
|
Etat laser | |
Bonjour, rien n'a change au faisceau laser (distribution reste le meme,l'energie sur la cathode =60mkJ, Iris = 1.3mm, Att =420).
J'ai termine les mesures. On peut demarrer.
Viktor. |
|
960
|
Thu Nov 14 08:33:34 2024 |
Entered by Super Team from 134.158.195.141 on Thu Nov 14 08:33:03 2024 | Under Process | Info | Linac Commissionning |
|
| |
08h30 Start ThomX
10h00 HV is 'ON'
11h03 RF Gun phase 230 dg. Att. 0.0 dB, Laser Att. 360.00, Charge -145 pC, Section Att. 2.59 dB, Phase 207 dg.
Linac steerers: H [2.69 -4.45]; V [-2.14 2.32],
11h20 Ring injection, Orbit studies
11h25 RF gun breakdowns, HV is 'OFF'
11h28 Restart HV, Problems with the Shutter,
11h36 Fixed
Frequent interlocks on V1
Set RF Gun temperature to 31.7 dg. (Clarinette temperature 31.5 -31.6)
11h40 Ring RF is 'ON'
15h43 Freaq. RF=500.1003
16h20 RF GUN Phase 229 dg., Charge -88 pC, Sect. Phase 213 dg. TL/BPM2 X=-2, Att. 2.703
17h00 Trying BBA
QP02 Ri-C2 BPM.01-Lib.04, 0.4 mm on X
QP02 Ri-C1 BPM.01-Lib.03, 1.8 mm on X
QP03 Ri-C1 BPM.02-Lib.03, 0.4 mm on X
QP03 Ri-C2 BPM.02-Lib.04, 0.2 mm on X
17h50 Stop ThomX |
| Attachment 1: TL_SST3Screenshot_from_2024-11-14_16-10-34.png
|
 |
| Attachment 2: 2024-11-14_16_10_01_tl_dg_sst_03-ccd_01_RAW_16bits.tiff
|
| Attachment 3: 2024-11-14_16_10_01_tl_dg_sst_03-ccd_01_RAW.png
|
 |
| Attachment 4: 2024-11-14_16_10_01_tl_dg_sst_03-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
|
 |
| Attachment 5: TL_SST2Screenshot_from_2024-11-14_16-06-27.png
|
 |
| Attachment 6: 2024-11-14_16_05_27_tl_dg_sst_02-ccd_01_RAW.png
|
 |
| Attachment 7: 2024-11-14_16_05_27_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
|
 |
| Attachment 8: 2024-11-14_16_05_27_tl_dg_sst_02-ccd_01_RAW_16bits.tiff
|
| Attachment 9: Screenshot_from_2024-11-14_15-35-17.png
|
 |
| Attachment 10: Screenshot_from_2024-11-14_15-31-58.png
|
 |
| Attachment 11: Screenshot_from_2024-11-14_15-30-14.png
|
 |
| Attachment 12: Screenshot_from_2024-11-14_15-29-27.png
|
 |
| Attachment 13: Screenshot_from_2024-11-14_15-29-15.png
|
 |
| Attachment 14: Screenshot_from_2024-11-14_15-29-02.png
|
 |
| Attachment 15: Screenshot_from_2024-11-14_12-33-27.png
|
 |
|
959
|
Wed Nov 13 08:26:05 2024 |
VC | Under Process | Shift summary | Linac Commissionning |
|
Shift summary 13/11/24 | |
demarrage machine 8h30
demarrage puissance RF
Phase charge max 286° Qmax 103pC sDev 13pC
Température canon pas optimale: 31.6°C le reflichi cann remonte en fin de pulse nouvelle consigne à 31.8°
Etude transmission charge à travers section en fonction de Col02n
( Q_transport_vs_Soleno.png =>faisceau non centré dans la section (recette # good_injection_no_good_storage )
Centrage faisceau dans la section ref Elog Commitionning 917_1
srt1 [H,V] 1.50 , -1.57
srt2 [H,V] -3.83 , 2.37
Etude transmission charge à travers section en fonction de Col02n (Q 50pC 100pC 205pC 280pC)
Centrage faisceau dans la section ref Elog Commitionning 917_2
srt1 [H,V] 2.26 , -3.30
srt2 [H,V] -4.42 , 4.16
Etude transmission charge à travers section en fonction de Col02n (Q 180pC, 100pC)
Attention alignement 917_2 très mauvais du point de vue de la charge
comparaison charge BPM ICT ==> gros probleme de lecture sur les BPMs somme....
Voir trends en pj dans lesquels on fait varier l'atténuation du laser, et on regarde les variations de charge et du signal Spsum.
Autour de 80pC de charge le signal Spsum fait des sauts pour ensuite à environ 90 pC de charge baisser d'environ 50% ...
Note : la charge a diminué pendant le shift passant de 300 pC à 420 degrés d'atténuation sur le laser à 160 pC .... Il faut monitorer l'energie du Laser ...
Mesures de la taille en fonction du Soleno : /data/shared/mesure/today/Taille_Soleno/
|
| Attachment 1: Q_transport_vs_Soleno.png
|
 |
| Attachment 2: Q_transport_vs_Soleno_Align_917_1.png
|
 |
| Attachment 3: Q_transport_vs_Soleno_Align_917_2.png
|
 |
| Attachment 4: ICT_Att_320_to_400.png
|
 |
| Attachment 5: SPSum_LI_Att_320_to_400.png
|
 |
|
958
|
Tue Nov 12 10:36:39 2024 |
Entered by Viktor Soskov from 134.158.195.153 on Tue Nov 12 10:36:24 2024 | Fixed | Info | Laser |
|
Salle laser ThomX | |
Bonjour , l'intervention du Dalkia sur le CTA de la salle laser est terminee.
Viktor. |
|
957
|
Tue Nov 12 08:12:06 2024 |
MJ KD VC | Under Process | Shift summary | Linac Commissionning |
|
shift du 12 novembre 2024 | |
8h10 : mise en chauffe en remote (modulateur, laser, chillers).
redemarrage serveur camera UV
vide canon à sauté
Arret synchro (Dialkia a coupé le courant des ampli 41.6MHz)
intervention dans la fosse (infra)
11H nouvelle ronde
Programme journée
Mesure dans LI pour Kick faisceau
(+Passage LE direct puis par anneau si ya le temps)
Mesure dans LI pour Kick faisceau
- Donnees prises (fichier de mesures dans datashared, a traiter)
Mesures test Alignement DPI et SEPTUM
- SCAN du premier bpm anneau (ri-ci_bpm02) en fonction du courqnt DPI puis courqat SEPTUM
- Fichier dans /data/shared dans repertoire Scan_ring_injection
Passage LE direct puis par anneau --> pas eu le temps
|
|
956
|
Fri Nov 8 09:35:41 2024 |
IC, VK, JN | Under Process | Shift summary | Ring |
|
ring studies | |
8h50 Start of the modumator and all subsystems
Beam studies.
Orbit Correction.
Transport only with dipoles - turn at 161.4A
Frequency from 500.0853 change to 500.0913
Tries BBA
16h12 Problem with sudden change of params.
Recepies did nopt store corrected orbit: due to erro in EL steerer.
In continuation to yesterday study Jean Noel soldered in parallel 33 ohm : effect on orbit visible . Need to find correct shunt resistance (temperature) and power > 10 W.
Power supply does not show any sign of problem.
18.40 End of shift |
| Attachment 1: scan_charge_phase_min_0.0_max_360.0_10_11_13.png
|
 |
| Attachment 2: Screenshot_from_2024-11-08_12-01-54.png
|
 |
| Attachment 3: Screenshot_from_2024-11-08_12-10-59.png
|
 |
| Attachment 4: Screenshot_from_2024-11-08_12-31-24.png
|
 |
| Attachment 5: Screenshot_from_2024-11-08_12-31-48.png
|
 |
| Attachment 6: Screenshot_from_2024-11-08_12-38-19.png
|
 |
| Attachment 7: Screenshot_from_2024-11-08_12-42-58.png
|
 |
| Attachment 8: Screenshot_from_2024-11-08_13-16-14.png
|
 |
| Attachment 9: Screenshot_from_2024-11-08_13-49-36.png
|
 |
| Attachment 10: Screenshot_from_2024-11-08_14-34-45.png
|
 |
| Attachment 11: Screenshot_from_2024-11-08_16-12-07.png
|
 |
| Attachment 12: Screenshot_from_2024-11-08_18-26-43.png
|
 |
| Attachment 13: withWORF5000913Screenshot_from_2024-11-08_12-11-51.png
|
 |
|
955
|
Thu Nov 7 08:53:22 2024 |
IC, VK, VM, JN | Under Process | Shift summary | Ring |
|
| |
8h50 Start of the modumator and all subsystems
PC client 1 was frozen => we restarted
10h20 HV on 1215 V
RF gun phase 28 dg., Att. 0.0 dB, Charge -106 pC
The beam shape at screen TL/DG/SST.01 is very strange. Big change. Try to allign the QP1 QP3
Steerers: H [2.48 -4.46]; V [-1.86 2.29]
Section Att. 2.77 dB, Phase 208, TL/BPM2 X= 0.1
11h45 Ring injection. Ri-c2/ps/str.06-h.01 and Ri-c2/ps/str.06-v.01 tango servers were off
12h59 Measure Beem energy with TL Steerer: 53.2 MeV (screenshot), TL/BPPM2 X about zero.
12h53 Start ring RF
14h0 Section chiller 'off' (unknown reason), Energy start to drop . Switch to 'on'.
15h27 Modulator on Standby
16h30 HV on.
16h37 Modulator 'off' voluntary. Unknown reason.
17h55 HV 'on' 1215 V, Section Phase 217, -125 pC
18h30 'access controle' to install shunt resistances of 33 Ohm at four magnets (close placed).
18h55 HV 'on' 1215 V, Section Phase 217, -125 pC
Orbit at straight sections goes down on 2 mm.
19h13 Stop ThomX
|
| Attachment 1: Screenshot_from_2024-11-07_10-57-55.png
|
 |
| Attachment 2: TL_SST1_QP1QP3ZeroScreenshot_from_2024-11-07_10-58-30.png
|
 |
| Attachment 3: TLSST1QP1QP3onScreenshot_from_2024-11-07_11-00-47.png
|
 |
| Attachment 4: Screenshot_from_2024-11-07_19-09-59.png
|
 |
| Attachment 5: Screenshot_from_2024-11-07_19-01-44.png
|
 |
| Attachment 6: Screenshot_from_2024-11-07_18-56-43.png
|
 |
|
954
|
Wed Nov 6 08:06:51 2024 |
VC MJ | Under Process | Shift summary | Linac Commissionning |
|
shift | |
demarrage chauffage 8h
autorisation PSS zone modulateur interdite => il faut venir valider la zone
PB MPS appel nourredine
plus les bouton mode de tir (solution mode expert/tir/forçage choix tir)
acquitement defaut vide: (solution mode expert /vide/validation)
pb MPS regle
shutter orange - on laisse refroidir 10 min - shutter vert
camera laser a bouge le point cathode est perdu
phase ch max = 58
charge = 180 pC avec att laser = 320
Essai de Realignement point cathode
Script alignement_photocathode_BPM (phase_max -5) --> va completement dans le decor (pos x=21 et posy=-6 !!) ... cf screenshot signal BPMLI
Je relance le script en partant d'une autre position depart pour M4 (13h56)
script arreté à pos (pos x=31 et posy=-17 !!)
Viktor réaligne le laser PC sur les références physiques
M4.01 (Cathode H) 470
M4.02 (Cathode V) 5488
On retroouve le faisceau sur YAGLI pour
M4.01 (Cathode H) 800
M4.02 (Cathode V) 5120
Mais le faisceau n'est plus sur la camera
Viktor acces casemate pour rerentrer le faisceau image laser sur la camera UV avec les miroirs de renvoie (16h19)
on regle à la main alignement laser sur cathode
optimisation sur BPM
M4.01 (Cathode H) 880
M4.02 (Cathode V) 5133
réaligneent avec script BPM
pos asservissement
H iris pos 6.33 mm (855)
V iris pos 3.56 mm (5133)
Point cathode realigne pour prochain shift
Prise de donnees rapide a la fin (note sur une feuille papier pour l'instant)
(Une belle journee de mer ...)
|
| Attachment 1: BPMLI_align_photocathode_13h15.png
|
 |
| Attachment 2: BPMLI_align_photocathode_13h56.png
|
 |
| Attachment 3: Laser_sur_cameraUV_16h19.png
|
 |
|
953
|
Tue Nov 5 17:30:10 2024 |
Entered by Viktor Soskov from 134.158.195.153 on Tue Nov 5 17:29:48 2024 | Fixed | Info | Laser |
|
Laser-cathode | |
Bonjour, le laser (miroirs du parcours optique) a ete realigne.
L'etat actuel: l'enrgie sur la cathode ~ 80µJ ( Iris 1.3mm, Att 420)
Viktor. |
|
952
|
Tue Nov 5 10:09:35 2024 |
SC VC | Under Process | Shift summary | Linac Commissionning |
|
shift linac | |
demarrage modulateur 9H
erreur vanne acquitée
10H intervention Viktor sur le laser PC
alignement laser en cours => pB de passage dans atténuateur (at least)
il faudra vérifier le point de référence alignement faisceau dans COL2 par rapport à la position
11h15 machine éteinte
priorité à Viktor pour alignement du laser PC;;; aujourd'hui et demain si nécessaire
dossier : /data/shared/Trend_scripts
changer environement : opt
choisir le script : ./trend.sh "nom script"
|
|
951
|
Thu Oct 31 08:19:25 2024 |
KDn Dupraz from 109.222.35.58 on Thu Oct 31 08:19:12 2024 | Under Process | Shift summary | Ring Commissioning |
|
shift du 31 octobre 2024 | |
8h15: mise en chauffe en remote (modulateur, laser, chiller, Cycling)
Tuning of the linac and injection to the ring
Goal: Search for the non-dispersive orbit and proper RF frequency
We started from F =500.059 MHz
Frequency change from 500.05 to 500.0853 MHz
We stopped at 500.0853 MHz and proceeded with the orbit correction
3 steereres are at max values. Studies continue to understand the other possibilities of corection.
18h Stop ThomX
|