  969   Wed Nov 27 08:04:44 2024 VCUnder ProcessShift summaryLinac Commissionning Shift summary 27/11 

8h : mise en chauffe (laser, modulateur, frigo, chiller, cyclage)

9H30 y'a eu une intervention non signalée dans les fosses toutes les rondes sont tombées! (Maher referme)
recette # operation_feedback_et_LE 20241126_17_43_31(faisceau non centré sur TL/QP.01)
Q max ICT1 120pC (att 340 iris 1.3mm)

Phase Emax 178°
Phase section 209°

Esectionkin 51.25MeV

Recette Operation_500_0913MHz241116_10_07_15

test quad scan

le soft matlab QP1_TLSST1_thomx_dark_dim  n'est pas fiable
=> nouveau script python Quad scan (dans  commintionning scrits\linac\aimants )

Isoleno : 220 et 235A : data à analyser

Test aimant néodynium sur tube faisceau :

Qmax pas de soléno pas de steerer

mesure 1
sans aimant 

------ YAG Max proj. Pixels -----
YAG X : 503.4 +/- 0.48989794855663565
YAG Y : 314.5 +/- 2.29128784747792
------ BPMs en mm -----
BPM X : 1.8827291000000002 +/- 0.058164067948261663
BPM Y : 0.44133750000000005 +/- 0.021049867535212655

On a vérifé la deviation du faisceau avec l'aimant placé sur la bride avec COL2. trop puissant mais on a le principe.

  Draft   Tue Nov 26 07:53:39 2024 MJ RC KDUnder ProcessShift summaryLaser | Opt | Linac Commissionning | Ring Commissioning shift du 26 novembre 2024 

8h : mise en chauffe en remote (laser, modulateur, frigo, chiller, cyclage)

10h48 : mise en route du feedback sur l'injection dans la section (1essai = erreur de signe sur le signal d'erreur), 2e essai (1min plus tard) semble ok, on laisse le feedback pour la stat.

Remarques :

** Kicker d'extraction instable. (extraction après stockage ok), sans steerer

** faisceau de rayons-X bouge en fonction de la phase e-/laser CFP

*** Programme ***

* mise en place feedback injection linac

10h48 : mise en route du feedback sur l'injection dans la section (1essai = erreur de signe sur le signal d'erreur), 2e essai (1min plus tard) semble ok, on laisse le feedback pour la stat. 
Avec feedback injection linac position bpm et charge beaucoup plus stables (data dans repertoire TRENDS)

* trend de flux avec asservissement du pointé d'injection

(fait vers 13h30, data a retrouver dans le trend generale fluo_diode ...)

* affinement de la position du 0 du faisceau X et mesure spectre angulaire

Fait 

Spectres acquis:

** Avec ecran fluo dans le faiscau (ca ne saturait donc pas, mais spectres tres elargiS par diffusion multiples)
** Ecran fluo retracte + desynchronisation pour ne pas que le det Amptek CdTe sature
spectre enregistres

* prise d'une image du faisceau de rayons X

Fait

Remarques :

** Kicker d'extraction instable. (extraction après stockage ok), sans steerer

** Le centre du faisceau de rayons X bouge de plusieurs centimetres (sur la camera dans la X-hutch) en fonction de la phase e-/laser CFP

  967   Fri Nov 22 11:18:28 2024 KD, RCUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 22 novembre 2024 

9h30 : mise en chauffe

intervention casemate pour alignement laser et nettoyage optique.

11h : démarrage, charge énergie max 100pC pour atténuateur à 330pas, phase 187°

On charge la recette et on règle le linac (energie et phase); position TL/BPM.02 à 0, et min de dispersion (tout allumé)

11h34 : stockage immédiat dans l'anneau ! C'est TOP !

Après midi compliqué pour trouver les rayons-X et avoir un cavité stable. 

synchronisation X :

* delay 33MHz/Trig ~ 2-4ns

* phase 500MHz CFP: 6.45V

prise de spectres X :

* déplacement du faisceau de rayonx X (à gauche et en bas) du à la nouvelle orbite

* spectro déréglé + trop de flux (saturation de l'acquisition)

 

Mise en place d'un "asservisement" du pointé d'injection dans l'anneau. Semble bien fonctionner (cf. screenshot), meme avec des variations d energie etc. Script dans : data/shared/commissioning_scripts/Linac/Alignements

18h30 : Stop ThomX

*** Programme prochain ***

* trend de flux avec asservissement du pointé d'injection

* affinement de la position du 0 du faisceau X

* mesure spectre angulaire

* prise d'une image du faisceau de rayons X

 

 

 

 

  966   Fri Nov 22 11:04:39 2024 KDNew SolutionLinacLI laser PC  

Mesure de ce matin et réalignement:

sortie laser : 298uJ

sortie ligne de transport : 209uJ

sortie iris 1.3mm: 80uJ

Injection canon: 60uJ@420pas

voir image faisceau

  965   Thu Nov 21 08:27:15 2024 VM Entered by Super Team from 134.158.195.141 on Thu Nov 21 08:26:43 2024Under ProcessInfoRing Commissioning   

08H25 Start ThomX

09H45 HV is 'ON'

09h49 Breakdown in the RF Gun

09h45 Restart HV

Linac steerers H [2. 66 -4.45]; V [-2.00 2.31]

RF Gun Phase is 223 dg. Att. is 0.0, Charge is -84 pC,  Sect. Phase 193 dg., Att. is 2.6 dB TL/BPM02 X 1mm

10h35  Ring Injection

11h00 Change RF to 500.0913

Tune 0.17

11h35 RF Gun Phase is 228 dg. Att. is 0.0, Charge is -50 pC,  Sect. Phase 196 dg., Att. is 2.65 dB TL/BPM02 X 1mm

There was problem with section temperature. Fixed, Phases adjusted.

12h40 RF Gun Phase is 227 dg. Att. is 0.0, Charge is -40 pC,  Sect. Phase 201 dg., Att. is 2.70 dB TL/BPM02 X =0 mm  

 

17h15 STOP THOMX

  964   Tue Nov 19 08:20:29 2024 MJ VC KD RC DNUnder ProcessShift summaryLinac Commissionning Shift summary 19/11/2024 icon3.gif 

8h20 demarrage machine

iris 1.3mm
att 440
phase Qmax 280   110pC
QEmax 90pC Ekin 4.6MeV  Etot 5.1MeV
arret pour cause d'alarme sf6 sur le MPS - cle thomx 0 pour verif pression : 2.4 mBar

Redemarrage

ph ch max  273
ph energie max -50
Recette 20241115_16_28_32
passage section
passage dipole - phase section disp min 207
Mesure energie YagTL1 Ekin=51.0
Faisceau sur Yag_TL3
Injection anneau

Relock de la cavite apres changement freq cavite RF

IP retrouvee - scan FPC pour mesure taille electrons : le flux X voit les kicks faisceau
Data a mettre en mode presentable ...

fin de shift 18h30

 

 

 

 

 

 

 

 

 


 

 

  963   Fri Nov 15 12:13:42 2024 Entered by Nicolas Delerue from 134.158.195.144 on Fri Nov 15 12:13:26 2024Not FixedInfoTL Charge excess in the TL 

By looking at the BPM transmission tool one can see that there is more charge on TL/BP.03 than on TL/BPM.02 (see attached image).

The BPM seetings have been checked and they are similar.

One can see a similar effect when comparing TL/ICT.01 and TL/ICT.02.

Possible interpretation: the beam is scrapping the beam pipe and creating a shower of secondaries.

  Draft   Fri Nov 15 07:56:03 2024 IC, VK, VM, ND Shift summary  Ring studies, MRSV 

07h50 Start ThomX

09h20 HV is 'ON'

09h25 HV  1215 V

09h52 RF Gun phase 234 dg. Att. 0.0 dB, Charge -110.0 pC; Sect. phase 208 dg., Att. 2.566 dB, TL/BPM2 X +2 mm

10h00 injection to the ring TL/BPM2 X -2 mm

10h02 Ring RF 100 kV

Today compared to yesterday shift the synchrotron oscillation amplitude is very unstable. Phase ? To be investigated.

First beam imaging with the MRSV.

 BBA studies

Horizontal plane

BPM3 (BPM.04-Lib.03) dX=1.1 mm

BPM9 (BPM.04-Lib.05) dX=0.8 mm

BPM5 (BPM.06-Lib.04) dX=0.2 mm

BPM11 (BPM.06-Lib.05) dX=-0.3 mm

BPM4 (BPM.05-Lib.04) dX=-0.3 mm

BPM10 (BPM.05-Lib.05) dX=1.2 mm

Set offsets on X in Liberas (OffX)

BPM.01-Lib.03, 130000+1800000 = 1930000

BPM.02-Lib.03, 70000+400000 = 470000

BPM.04-Lib.03, 40000+1100000 = 1140000

BPM.06-Lib.04, 30000+200000 = 230000

BPM.03-Lib.03, 60000+100000 = 160000

BPM.05-Lib.04, 130000-300000 = -170000

BPM.01-Lib.04, 300000+400000 = 700000

BPM.02-Lib.04, 70000+200000 =  270000

BPM.05-Lib.05, 140000+1200000 = 1340000

BPM.06-Lib.05, -20000-300000 = -320000

BPM.04-Lib.04, -50000+800000 = 750000

BPM.03-Lib.03, 60000+100000 = 160000

Vertical plane

BPM12 ri-c1/dg/bpm.01-lib.03 dY =  -2.4 mm

BPM1 ri-c1/dg/bpm.02-lib.03 dY = - 0.1 mm

BPM2 ri-c1/dg/bpm.03-lib.03 dY = - 0.5 mm

BPM3 ri-c1/dg/bpm.04-lib.03 dY = -0.2 mm

BPM4 ri-c1/dg/bpm.05-lib.04 dY = -1.0 mm

BPM5 ri-c1/dg/bpm.06-lib.04 dY = - 0.7 mm

BPM6 ri-c2/dg/bpm.01-lib.04 dY = - 1 mm

BPM7 ri-c2/dg/bpm.02-lib.04 dY = - 0.1 mm

BPM8 ri-c2/dg/bpm.03-lib.05 dY = -0.3 mm

BPM9 ri-c2/dg/bpm.04-lib.05 dY = -0.6 mm

BPM10 ri-c2/dg/bpm.05-lib.05 dY = + 0.3 mm

BPM11 ri-c2/dg/bpm.06-lib.05 dY = +0.5 mm

Set offsets on Y in Liberas (OffY)

BPM12 ri-c1/dg/bpm.01-lib.03 dY_new  = -300000 -2.4 mm  = -2700000

BPM1 ri-c1/dg/bpm.02-lib.03 dY_new = - 10000 - 0.1 mm = -110000

BPM2 ri-c1/dg/bpm.03-lib.03 dY_new = 105000 - 0.5 mm = -395000

BPM3 ri-c1/dg/bpm.04-lib.03 dY_new = 190000 -0.2 mm = -10000

BPM4 ri-c1/dg/bpm.05-lib.04 dY_new = - 110000  -1.0 mm =  -1110000

BPM5 ri-c1/dg/bpm.06-lib.04 dY_new = -100000 - 0.7 mm = -800000

BPM6 ri-c2/dg/bpm.01-lib.04 dY_new = -20000 - 1 mm = -980000

BPM7 ri-c2/dg/bpm.02-lib.04 dY_new = 150000 - 0.1 mm = 50000

BPM8 ri-c2/dg/bpm.03-lib.05 dY_new = 0 - 0.3 mm = -300000

BPM9 ri-c2/dg/bpm.04-lib.05 dY_new = - 90000 -0.6 mm =  -690000

BPM10 ri-c2/dg/bpm.05-lib.05 dY_new = 70000 + 0.3 mm =  370000

BPM11 ri-c2/dg/bpm.06-lib.05 dY_new = 10000 +0.5 mm = 510000

 

Studies in single trigget mode. See screenshots.

Beam is stored (sligth decay) in the ring around 15 minutes without touching anything. This opens way for beam dynamics studies and for better understanding of machine. Need to find a way to have diagnostics data  (trigger only diag) in such mode.

17h50 Stop ThomX

 

 

 

 

 

 

 

  961   Thu Nov 14 09:21:51 2024 Entered by Viktor Soskov from 134.158.195.153 on Thu Nov 14 09:21:36 2024FixedInfoLaser Etat laser 

Bonjour, rien n'a change au faisceau laser (distribution reste le meme,l'energie sur la cathode =60mkJ, Iris = 1.3mm, Att =420).

J'ai termine les mesures. On peut demarrer.

Viktor.

  960   Thu Nov 14 08:33:34 2024 Entered by Super Team from 134.158.195.141 on Thu Nov 14 08:33:03 2024Under ProcessInfoLinac Commissionning   

08h30 Start ThomX

10h00 HV is 'ON'

11h03 RF Gun phase 230 dg. Att. 0.0 dB, Laser Att. 360.00, Charge -145 pC, Section Att. 2.59 dB, Phase 207 dg.

Linac steerers: H [2.69 -4.45]; V [-2.14 2.32],

11h20 Ring injection, Orbit studies

11h25 RF gun breakdowns, HV is 'OFF'

11h28 Restart HV, Problems with the Shutter,

11h36 Fixed

Frequent interlocks on V1

Set RF Gun temperature to 31.7 dg. (Clarinette temperature 31.5 -31.6)

11h40 Ring RF is 'ON'

15h43 Freaq. RF=500.1003

16h20 RF GUN Phase 229 dg., Charge -88 pC, Sect. Phase 213 dg. TL/BPM2 X=-2, Att. 2.703

17h00 Trying BBA

QP02 Ri-C2 BPM.01-Lib.04, 0.4 mm on X

QP02 Ri-C1 BPM.01-Lib.03, 1.8 mm on X

QP03 Ri-C1 BPM.02-Lib.03, 0.4 mm on X

QP03 Ri-C2 BPM.02-Lib.04, 0.2  mm on X

17h50 Stop ThomX

  959   Wed Nov 13 08:26:05 2024 VCUnder ProcessShift summaryLinac Commissionning Shift summary 13/11/24 

demarrage machine 8h30
demarrage puissance RF
Phase charge max 286° Qmax 103pC sDev 13pC
Température canon pas optimale: 31.6°C  le reflichi cann remonte en fin de pulse nouvelle consigne à 31.8°

Etude transmission charge à travers section en fonction de Col02n
( Q_transport_vs_Soleno.png   =>faisceau non centré dans la section (recette # good_injection_no_good_storage )

 

Centrage faisceau dans la section ref Elog Commitionning 917_1
    srt1 [H,V] 1.50 , -1.57
    srt2 [H,V] -3.83 , 2.37

Etude transmission charge à travers section en fonction de Col02n (Q 50pC  100pC 205pC 280pC)

 

Centrage faisceau dans la section ref Elog Commitionning 917_2

  srt1 [H,V] 2.26 , -3.30
    srt2 [H,V] -4.42 , 4.16

Etude transmission charge à travers section en fonction de Col02n (Q 180pC, 100pC)

Attention alignement 917_2 très mauvais du point de vue de la charge

 

 

comparaison charge BPM ICT   ==> gros probleme de lecture sur les BPMs somme....
Voir trends en pj dans lesquels on fait varier l'atténuation du laser, et on regarde les variations de charge et du signal Spsum.
Autour de 80pC de charge le signal Spsum fait des sauts pour ensuite à environ 90 pC de charge baisser d'environ 50% ...

Note : la charge a diminué pendant le shift passant de 300 pC à 420 degrés d'atténuation sur le laser à 160 pC .... Il faut monitorer l'energie du Laser ... 

Mesures de la taille en fonction du Soleno : /data/shared/mesure/today/Taille_Soleno/

 

 

  958   Tue Nov 12 10:36:39 2024 Entered by Viktor Soskov from 134.158.195.153 on Tue Nov 12 10:36:24 2024FixedInfoLaser Salle laser ThomX 

Bonjour , l'intervention du Dalkia sur le CTA de la salle laser est terminee.

Viktor.

  957   Tue Nov 12 08:12:06 2024 MJ KD VCUnder ProcessShift summaryLinac Commissionning shift du 12 novembre 2024 

8h10 : mise en chauffe en remote (modulateur, laser, chillers).

redemarrage serveur camera UV
vide canon à sauté
Arret synchro (Dialkia a coupé le courant des ampli 41.6MHz)
intervention dans la fosse (infra)

11H nouvelle ronde

Programme journée
Mesure dans LI pour Kick faisceau
(+Passage LE direct puis par anneau si ya le temps)

 

Mesure dans LI pour Kick faisceau

  • Donnees prises (fichier de mesures dans datashared, a traiter)

Mesures test Alignement DPI et SEPTUM

  • SCAN du premier bpm anneau (ri-ci_bpm02) en fonction du courqnt DPI puis courqat SEPTUM
  • Fichier dans /data/shared dans repertoire Scan_ring_injection

Passage LE direct puis par anneau --> pas eu le temps

 


 

 

 

 

 


 


 

 

 

  956   Fri Nov 8 09:35:41 2024 IC, VK, JNUnder ProcessShift summaryRing ring studies 

8h50 Start of the modumator and all subsystems

Beam studies.

Orbit Correction.

 

Transport only with dipoles -  turn at 161.4A

Frequency from 500.0853 change to 500.0913

Tries BBA

 

16h12 Problem with sudden change of params.

Recepies did nopt store corrected orbit: due to erro in EL steerer.

 

In continuation to yesterday study Jean Noel soldered in parallel 33 ohm : effect on orbit visible . Need to find correct shunt resistance (temperature) and power > 10 W.

Power supply does not show any sign of problem.

 

 

 

 

 

 

 

 

18.40 End of shift

  955   Thu Nov 7 08:53:22 2024 IC, VK, VM, JNUnder ProcessShift summaryRing   

8h50 Start of the modumator and all subsystems

PC client 1 was frozen => we restarted

10h20 HV on 1215 V

RF gun phase 28 dg., Att. 0.0 dB, Charge -106 pC

The beam shape at screen TL/DG/SST.01 is very strange. Big change. Try to allign the QP1 QP3

Steerers: H [2.48 -4.46]; V [-1.86 2.29]

Section Att. 2.77 dB, Phase 208,  TL/BPM2 X= 0.1

11h45 Ring injection. Ri-c2/ps/str.06-h.01 and   Ri-c2/ps/str.06-v.01 tango servers were off

12h59 Measure Beem energy with TL Steerer: 53.2 MeV (screenshot), TL/BPPM2 X about zero.

12h53 Start ring RF

14h0 Section chiller 'off' (unknown reason), Energy start to drop . Switch to 'on'.

15h27 Modulator on Standby

16h30 HV on.

16h37 Modulator 'off' voluntary. Unknown reason.

17h55 HV 'on' 1215 V, Section Phase 217, -125 pC

18h30 'access controle' to install shunt resistances of 33 Ohm at four magnets (close placed).

18h55 HV 'on' 1215 V, Section Phase 217, -125 pC

Orbit at straight sections goes down on 2 mm.

19h13 Stop ThomX

 

 

 

  954   Wed Nov 6 08:06:51 2024 VC MJUnder ProcessShift summaryLinac Commissionning shift  

demarrage chauffage 8h
autorisation PSS zone modulateur  interdite => il faut venir valider la zone
PB MPS  appel nourredine
plus les bouton mode de tir (solution mode expert/tir/forçage choix tir) 
acquitement defaut vide:  (solution mode expert /vide/validation)
pb MPS regle
shutter orange - on laisse refroidir 10 min - shutter vert

camera laser a bouge le  point cathode est perdu

phase ch max = 58
charge = 180 pC avec att laser = 320

Essai de Realignement point cathode

Script alignement_photocathode_BPM (phase_max -5) --> va completement dans le decor (pos x=21 et posy=-6 !!) ... cf screenshot signal BPMLI
Je relance le script en partant d'une autre position depart pour M4 (13h56)
script arreté à  pos (pos x=31 et posy=-17 !!)

Viktor réaligne le laser PC sur les références physiques 
M4.01 (Cathode H) 470
M4.02 (Cathode V) 5488

On retroouve le faisceau sur YAGLI pour
M4.01 (Cathode H) 800
M4.02 (Cathode V) 5120
Mais le faisceau n'est plus sur la camera
Viktor acces casemate pour rerentrer le faisceau image laser sur la camera UV avec les miroirs de renvoie (16h19)

on regle à la main alignement laser sur cathode
optimisation sur BPM
M4.01 (Cathode H) 880
M4.02 (Cathode V) 5133

réaligneent avec script BPM

pos asservissement 
H iris pos 6.33 mm (855)
V iris pos 3.56 mm (5133)

Point cathode realigne pour prochain shift 

Prise de donnees rapide a la fin (note sur une feuille papier pour l'instant)

(Une belle journee de mer ...)

 

 

 

 

 

 

 

  953   Tue Nov 5 17:30:10 2024 Entered by Viktor Soskov from 134.158.195.153 on Tue Nov 5 17:29:48 2024FixedInfoLaser Laser-cathode 

Bonjour, le laser (miroirs du parcours optique) a ete realigne.

L'etat actuel: l'enrgie sur la cathode ~ 80µJ ( Iris 1.3mm, Att 420)

Viktor.

  952   Tue Nov 5 10:09:35 2024 SC VCUnder ProcessShift summaryLinac Commissionning shift linac 

demarrage modulateur 9H
erreur vanne acquitée
10H intervention Viktor sur le laser PC

alignement laser en cours => pB de passage dans atténuateur (at least)

il faudra vérifier le point de référence alignement faisceau dans COL2 par rapport à la position 

11h15 machine éteinte

priorité à Viktor pour alignement du laser PC;;; aujourd'hui et demain si nécessaire

 

dossier :  /data/shared/Trend_scripts
changer environement : opt
choisir le script : ./trend.sh "nom script"


 

 

  951   Thu Oct 31 08:19:25 2024 KDn Dupraz from 109.222.35.58 on Thu Oct 31 08:19:12 2024Under ProcessShift summaryRing Commissioning shift du 31 octobre 2024 

8h15: mise en chauffe en remote (modulateur, laser, chiller, Cycling)

Tuning of the linac and injection to the ring

Goal: Search for the non-dispersive orbit and proper RF frequency

We started from F =500.059 MHz

Frequency change from 500.05 to 500.0853 MHz

We stopped at 500.0853 MHz and proceeded with the orbit correction

3 steereres are at max values. Studies continue to understand the other possibilities of corection.

18h Stop ThomX

 

  950   Wed Oct 30 11:33:04 2024 VM, IC, VKUnder ProcessInfoLI | TL | LE | Ring   

9h25 Start ThomX

11h20 HV on, linac RF OK, but there is no laser on the cathode. Trying to fix.

The problem was with the M4 position. initial positions now are: M4 mot.01 2855.00,  M4 mot.02 4631.00,

15h25 HV is on.

problems with changing Ring RF frequency. Kevin helped.

With frequency chnge, the trigger stability changes. The rigole phase should be adjusted.

Problem with steerer in the TL TL/PS/STR.03-H.O1 Impossible to set the current. It goes to error.

Looking for solution to compensate its effect. Email to jeabn Noel is sent

 

Search for non dispersive orbit and frequency. F =500.059 looks good. With RF and without RF orbit is the same.

 

Further studies ongoing.

 

End of shift. 1906 

 

 

 

 

 

 

 