Entered by Marie Jacquet from 134.158.205.16 on Tue Dec 17 23:26:26 2024; shift 17/12 - scan vert FPC - 50 MeV 6x
|
8h10 : mise en chauffe de la machine (modulateur, laser, frigo et chiller)
9h30: faisceau dans anneau avec 100pC injecté
Problème modulateur (interlock tension) ==> attendre que la perverance déscende en trig à faible tension pendant 1h (Maher a augmenté la valeur du threshold, le problème ne devrait pas revenir)
9h35 HV is 1214 V, RF Gun phase is 176 dg. Sect. Att. 2.578 dB, Phase is 216 dg. Charges -84 pC, -72 pC, -76 pC
10h40 HV 1215 V
13h24 Linac steerers H [2.65 -4.29], V [-1.8 2.07] RF Gun Phase 175 dg. Sect. Att. 2.564, Phase 217 dg. Charges: -117 pC, -117 pC, -127 pC
synchronisation laser/electron autour de 4ns (trigger, 33MHz CFP).
** Scan FPC table vertical 50 MeV 10 Hz
aller : 10-57-18.csv ==> sigma_scan = 140 um ==> sigma_e ~ 124 um
retour : 11-09-47.csv ==> sigma_scan = 144 um ==> sigma_e ~ 128 um
** Scan one trig aller 11-19-31.csv ==> sigma_scan = 80 um ==> sigma_e ~ 47 um
** Mesure perte de charge avec BPM en mode one Trig
T_end-T0 ~ 11 minutes
charge T0 ~ 3.8 e^7
charge T_end ~ 4.0 e^6
Baseline ~ 2.8 e^6
--> Q(T0)/Q(T_end) ~ 30
** Viktor optimise l'injection - scan : scan 16-05-16.csv ==> sigma_scan = 133 um ==> sigma_e ~ 116 um
==> gain en flux (facteur 2-3, ~ 15-20 10³ pA à 40 -50 10³ pA)
** Beaucoup de steerers dans la ligne de transfert (~ 10A pour l'horizontal 2 et 3)
** 17h: Scan à "haute" charge (120pC --> 150pC) : scan 17-02-55 ==> sigma_scan = 165 um ==> sigma_e ~ 152 um
** 17h05 : Scan avec iris à 1.3mm --> 1mm (110pC) :
scan 17-13-04 ==> sigma_scan = 152 um ==> sigma_e ~ 137 um
** 17h15 : test single trigger
PS : les flux des 6 scan desynchro en pj sont encore a traiter/comprendre (selon taille e-, charge, iris, optim injection)
|
KD; shift du 17 décembre 2024
|
8h10 : mise en chauffe de la machine (modulateur, laser, frigo et chiller)
9h30: faisceau dans anneau avec 100pC injecté
Problème modulateur (interlock tension) ==> attendre que la perverance déscende en trig à faible tension pendant 1h (Maher a augmenté la valeur du threshold, le problème ne devrait pas revenir)
9h35 HV is 1214 V, RF Gun phase is 176 dg. Sect. Att. 2.578 dB, Phase is 216 dg. Charges -84 pC, -72 pC, -76 pC
10h40 HV 1215 V
13h24 Linc steerers H [2.65 -4.29], V [-1.8 2.07] RF Gun Phase 175 dg. Sect. Att. 2.564, Phase 217 dg. Charges: -117 pC, -117 pC, -127 pC
Several vertical scans were performed for different initial beam charge with X ray flux in async mode
Decay time data taken.
End of shift 18h.
|
VM, IC, VK;  
|
08h23 Start ThomX
09h40 HV is 'On'
10h24 RF Gun Phase 183 dg. Sect. Att. is 2.533, Phase 212 dg. Charges; -100.0 pC, -93.0 pC, -109.0 pC, Linac steerers H [2.68 -4.4], V [-2.0 2.19]
10h35 Loading receipt from 06/12/2024 11h30, Thereis storage at freq. 500.10045 MHz, 100 kV
12h34 RF Gun Phase 181 dg. Sect. Att. is 2.553, Phase 219 dg. Charges; -106.0 pC, -100.0 pC, -112.0 pC, Linac steerers H [2.68 -4.4], V [-2.0 2.19]
Adjusting the vertical orbit to BPM1 and BPM2 (-1 mm and -1.5 mm respectively) reduces the vertical spot size on the MSRV camera
Checking BBA
14h00 Controlled access to the bunker to check the X-line shutter
15h00 HV is 'ON'
17h15 Stop ThomX
|
KD, RC, MJ, VM, IC, VK; shift du 12 décembre 2024 7x
|
7h50: mise en chauffe en remote (chiller, frigo, laser, modulateur)
Demarrage alignement sur l'axe du CdTe pour prendre un spectre 70 MeV
12h20 HV is 'Off', Stop RF to go to bunker
- SHUTTER ligne X en defaut - Essai de resoudre le probleme, sans succes -
Appel Harold
13h20 HV is 'On'
Investigation on the X-rays
Several vertical scans
In the single trigger mode the vertical scans give sigma ~70-80 um while in the normal mode (10 Hz injection) the scan is very wide. The results are in agreement with the shape of the beam on MRSV. Should be understood.
The storage is good at 70 MeV
18h10 End of the shift
|
KD, VC, RC MJ; shift du 11 décembre 2024   
|
8h10 : mise en chauffe à distance de la machine (chiller, frigo, laser, modulateur).
/!\ La mesure SF6 faites par le MPS est décalée de 0.2bar (lectrure MPS 2.47bars, lecture manomètre 2.3bars) ==> remise SF6 à 2.6bars au manomètre (lecture MPS 2.84bars)
penser à ajouter dans les recettes la fréquence anneau et l'atténuation RF ring
50 MeV - chargement recette 20241126_17_43_31
frequence 500.09595 MHz
** Pos horiz table FPC -1.2 mm
11h56 - Scan vertical FPC diode fluo (500 ms acq - mode desynchro e-/laser) - Amplitude synchrotron anneau ~ 1-1.5 mm peak peak
mot vertical table FPC = -2.7 mm : hors faisceau a -1.5
12h05 scan dans l'autre sens (spyder plante au milieu --> gaussienne un peu plus large, pas exploitable)
12h23 nouveau scan FPC (mode desynchro e-/laser) apres augmentation amplitudes oscill synchr Amplitude synchrotron anneau ~ 5mm peak peak
** Pos horiz table FPC y=0 mm
12h40 scan vert FPC (mode desynchro e-/laser) - Amplitude synchrotron anneau ~ 1-1.5 mm peak peak
Gaussiennes meme largeur au premier ordre (= a l'oeil)
qq soit pos horiz table FPC
qq soit amplitude synchrotron
** pos vert = -1.6 (position max = IP)
scan horizontal FPC (desynchro e-/laser): change peu flux - change position faisceau sur dectris
FPC horiz = -1.55 --> faisceau au centre du tube faisceau X
(pause cause copil)
Passage a 70 MeV - pas possible de stocker !
Repassage 50 MeV
Avec Extraction faisceau apres 200 us - mode SYNCHRO e-/laser
** Scan vertical FP cavity avec 200 us kicker extraction (1 scan aller et 1 retour table FPC)
** Images pilatus prise (10 sec acqu)
Retour a 100 ms stockage
** Variation charge e- de 50 pC a 250 pC : flux pas lineaire avec la charge (donnees a mettre en forme)
** Variation SOLENO de 180A a 260A : optimum pour 220 A
Ces 2 etudes faites tres rapidement en fin de shift, juste "pour voir"
|
VM,HG,SC; 50 and 70 MeV Emittance, and transport 
|
Intervention chiller (Maher) : maintenance nécessaire à prévoir (clé outil clignote)
Problème de fermeture casemate : bouton rouge de la grille de sortie enfoncée
11h36 Démarrage faisceau
11h42 HV is 'On'
12h52 RF Gun phase is 154 dg.; Att. sect. is 0.176 dB; Sect. Phase is 244 dg. TL/BPM02 X=-4 mm; Charges 89; 93
Linac steerers: H [1.17 -3.35]; V [-2.26 2.18]
Emittance measurements at 70 MeV
15h10 Set to 50 MeV; Gun Phase is 154 dg., Sect. Att. is 2.62 dB; Receipt from 28/11/2024 17h51
16h10 : loaded good storage for x rays from recepies to check 50 MeV . From this setting lets check back alignment in quads from the quand alignment script.
Before alignment : AL1
Str01-H01 : 2.69
Str01-V01 : -2.14
Str01-H02 : -4.46
Str01-V02 : 2.32
After alignment: AL2
Str01-H01 : 2.89
Str01-V01 : -1.92
Str01-H02 : -4.44
Str01-V02 : 2.33
But : transmission (charge) : drop by 40%
Let's do soléno scan to check transmission : Quand alignment not very good for charge transmission, see attched plots.
Let's check alignment on the section for the 2 alignments. We change the section phase by 50° and see displacement (Yag and BPM). For this, Quads should be off.
Alignement : AL2
Phase start : 217
------------- TL -------------------
------ YAG LimaBPM Pixels -----
YAG X : 303.48206851 +/- 2.53475464631
YAG Y : 248.17574592 +/- 3.09361246552
------ YAG Max proj. Pixels -----
YAG X : 311.225 +/- 1.65056808402
YAG Y : 247.15 +/- 2.8332843133
------ BPMs en mm -----
BPM X : -0.280208425 +/- 0.0363865736831
BPM Y : 0.328087125 +/- 0.0522391011486
Phase end : 260
------------- TL -------------------
------ YAG LimaBPM Pixels -----
YAG X : 580.056498553 +/- 3.23802401848
YAG Y : 262.888974065 +/- 4.1652343396
------ YAG Max proj. Pixels -----
YAG X : 580.5 +/- 4.28368999812
YAG Y : 257.5 +/- 3.69459064038
------ BPMs en mm -----
BPM X : 4.87663125 +/- 0.0575652671525
BPM Y : 0.096524675 +/- 0.0720854637695
Alignement : AL1
------------- TL -------------------
------ YAG LimaBPM Pixels -----
YAG X : 262.601980531 +/- 19.0243746195
YAG Y : 332.053127301 +/- 1.57943041905
------ YAG Max proj. Pixels -----
YAG X : 281.125 +/- 2.59987980491
YAG Y : 327.075 +/- 1.9797411447
------ BPMs en mm -----
BPM X : -0.97775805 +/- 0.0424827626514
BPM Y : -1.10375235 +/- 0.0278375257903
Phase end : 260
------------- TL -------------------
------ YAG LimaBPM Pixels -----
YAG X : 488.638304627 +/- 2.94860256378
YAG Y : 369.841993906 +/- 2.4681240712
------ YAG Max proj. Pixels -----
YAG X : 492.675 +/- 2.89298721048
YAG Y : 371.25 +/- 3.34477204006
------ BPMs en mm -----
BPM X : 3.5390905 +/- 0.0500967083465
BPM Y : -1.860907325 +/- 0.0472255884105
some tries to enter the ring, by using same recipe than last friday. But someting changed, not possible to get back to the same storage. May be beam quality has changed from last run.
--> We need to find a set of observables to be checked to get back to the same beam quality for injection !
18h30 : Tchuss
|
VC MJ; Installation du PM dans la X-hucth
|
Le PM est installe dans la X-hutch (PM + gene + ocsillo), on a test que ca fonctionne -
Il manque juste un cable HT plus long pour positionner l'ampli de facon secure (Vincent lundi) |
VM, IC, VK, HG ; 8x
|
08h25 Start ThomX
09h55 HV is 'ON'
10h18 RF Gun Phase is 159 dg. Sect. Phase is 208 dg. Att. 2.66 TL/BPM2 X=-2mm, Isol =230 A, Charges: -115 pC, -95.7 pC, -100 pC
Beam injected to the Ring. There is storage there.
10h25 Ring RF is 'On', 100 kV. Storage OK
10h35 Extraction kicker is 'ON' del. is -12.4 us
10h37 TL/BPMé X=+1 mm to minimize synchrotron oscillations. Tune is 0.17
Response matrix measuring
11h45 70 MeV Receipt for 70 MeV with storage: Sect. Att is 0.204, Phase Sect is 237 dg.
12h00 RF 50 kV Beam is killed by RF
12h10 Change frequency to 500.08095 MHz
Many scans in Frequency- slow no result. Tune optics.
17h30 Hayg by scanning RF found correct frequency : 500.0325 . Recipie : Hayg 70.
Good storage!
|
VM Entered by Super Team from 134.158.195.141 on Thu Dec 5 08:31:12 2024;
|
08h28 Start ThomX
08h40 Some magnets remain switched off. Cycling was not performed
10h20 V is 'ON'
10h55 RF Gun Phase is 165 dg., Sect. Phase is 236 dg., Att. is 0.2 dB. Chargges: -105 pC, -108 pC, -114 pC I TL/DP =255.8 A (70 MeV)
12h40 Ring optic scaled to 70 MeV, there are two turns, start RCDS on injection
12h50 about 2000 turns without steerers and without RF at the Ring
14h13 Start ring RF
RF is killing beam at 70 MeV. No phase and energy compatible found. Studies ongoing.
15h57 Return to 50 MeV
16h20 Receipt from 28/11/2024 17h51 There is storage
18.05 Stop THOMX.
|
VC; Frequence anneau et systeme de synchro
|
Rappel:
la fréquence de l'anneau doit etre modifiée avec l'insterface RING RF cavity :
Ring RF doit etre divisible par 15 à 5 chiffres après la virgule (cela fait des pas de 150Hz sur le 500MHz) c'est la limite du matériel qui sert pour la synchro (toutes les solutions de fréquence ne répodant pas à cette limite ne sont pas des solutions viables pour la machine)
en cas de changement de fréquence il faut vérifier que le timing (répétion de la marchine 25 10 ou 1Hz )soit stable sur l'oscilloscope .
si ce n'est pas le cas il faut changer la phase du générateur Rigol 33MHz avec le script (commande) ./phase_shifter_rigol.py --phase "value" (value = nombre) (dans panneaux/synchro)
si cela ne fonctionne pas (pas de solution timing stable ) prévenir l'équipe synchro
Fréquence Ring actuelle 500.09595 MHz => /15= 33.33973MHz
|
SC, HG, VM; Passage à 61.5MeV et 70 MeV 
|
9h14 Mise en chauffe
Pas de camera laser qui s'ouvre sur PlateformeIHM
9h19 cyclage aimants LI, TL sur interface
soucis DS camera laser, impossible à redémarrer.
--> du coup impossible de démarrer le feedback du laser
Chargement recette good_20241114_15_27_46, optimized storage for X_rays (5/6)
Mesure energie : 48.34 MeV attenutation 2.7 dB
Energie = 54.21 MeV attenuation 1.7 dB
Energie = 58.77 MeV attenuation 1 dB
Energie = 60.29 MeV attenuation 0.5 dB
Passage à 61.5 MeV dans la TL --> recette enregistrée
Passage à 70 MeV dans la TL --> recette enregistrée, solenoide est à 210 A, dipole = 255.8A
Modification des steerers :
LI/PS/STR.01_H01 = 1.17A
LI/PS/STR.01_v01 = -2.16
LI/PS/STR.02_V01 = 2.32
LI/PS/STR.02_H01 = 1.17A
Images sauvegardées le long du transport
Après alignement quad sans le steerer TL :
LI/PS/STR.01_H01 = 1.18
LI/PS/STR.01_V01 = -220
LI/PS/STR.02_H01 = -2.97
LI/PS/STR.02_V01 = 2.34
Puis mesure transmission charge vs soleno
18h30 Arret
|
VC, Carlos Buitrago, Sudhanshu Thakur, ND; TP 29-11--2024
|
demarrage chauffage 8H20
test nouveau code synchro 50Hz => ne fonctionne pas
Le nouveau code 25Hz ne fonctionne pas => code installé 25Hz (juin 2024)
10:30 Beam ON
Loading recipe: LI_TL_RI_good_20241114_15_27_46
11:30 RF section phase: 191 deg, Att=2.56dB
Start position feedbacks...
Beam seen in the LE (but very weak).
Recipe saved as TL_test_20241129_12_06_24
12:15 Access in Fosse nord for ALTO => 1h30 break.
13:45 Restart beam
Difficulty to tune...
15:12 Extraction at t=92.3
LIB.01 was at -7.48 moved to -4
15:41 Ext kicker very stable
Beam seen in EL/DG/BPM.01
Beam intensity on the BPM is varying with a long period. We can not identify the source of the variation.
Transmission is about 20% but most of the losses probably occur in the EL.
17:00 Beam OFF
|
VM, IC, VK ;
|
08h18 Start ThomX
10h00 HV is 'ON'
10h35 RF Gun phase is 174 dg. Section Phase is 209 dg. Sect. Att. is 2.70 dB TL/BPM2 X=0, Charge is -127 pC
Linac steerers H [2.66 -4.46], V [-2.00 2.41]
10h40 Start Ring RF 100 kV, TL/BPM2 X=0,5 mm
Ring Studies
12h30 Stop HV and ring RF
12h40 Access: JN went to exchange the shunt resistors
13h26 HV iand ring RF are 'ON'
15h18 RF Gun phasee is 178 dg., Sect. phase is 215 dg.
18h10 Stop ThomX
|
VC; Shift summary 27/11  
|
8h : mise en chauffe (laser, modulateur, frigo, chiller, cyclage)
9H30 y'a eu une intervention non signalée dans les fosses toutes les rondes sont tombées! (Maher referme)
recette # operation_feedback_et_LE 20241126_17_43_31(faisceau non centré sur TL/QP.01)
Q max ICT1 120pC (att 340 iris 1.3mm)
Phase Emax 178°
Phase section 209°
Esectionkin 51.25MeV
Recette Operation_500_0913MHz241116_10_07_15
test quad scan
le soft matlab QP1_TLSST1_thomx_dark_dim n'est pas fiable
=> nouveau script python Quad scan (dans commintionning scrits\linac\aimants )
Isoleno : 220 et 235A : data à analyser
Test aimant néodynium sur tube faisceau :
Qmax pas de soléno pas de steerer
mesure 1
sans aimant
------ YAG Max proj. Pixels -----
YAG X : 503.4 +/- 0.48989794855663565
YAG Y : 314.5 +/- 2.29128784747792
------ BPMs en mm -----
BPM X : 1.8827291000000002 +/- 0.058164067948261663
BPM Y : 0.44133750000000005 +/- 0.021049867535212655
On a vérifé la deviation du faisceau avec l'aimant placé sur la bride avec COL2. trop puissant mais on a le principe. |
MJ RC KD; shift du 26 novembre 2024
|
8h : mise en chauffe en remote (laser, modulateur, frigo, chiller, cyclage)
10h48 : mise en route du feedback sur l'injection dans la section (1essai = erreur de signe sur le signal d'erreur), 2e essai (1min plus tard) semble ok, on laisse le feedback pour la stat.
Remarques :
** Kicker d'extraction instable. (extraction après stockage ok), sans steerer
** faisceau de rayons-X bouge en fonction de la phase e-/laser CFP
*** Programme ***
* mise en place feedback injection linac
10h48 : mise en route du feedback sur l'injection dans la section (1essai = erreur de signe sur le signal d'erreur), 2e essai (1min plus tard) semble ok, on laisse le feedback pour la stat.
Avec feedback injection linac position bpm et charge beaucoup plus stables (data dans repertoire TRENDS)
* trend de flux avec asservissement du pointé d'injection
(fait vers 13h30, data a retrouver dans le trend generale fluo_diode ...)
* affinement de la position du 0 du faisceau X et mesure spectre angulaire
Fait
Spectres acquis:
** Avec ecran fluo dans le faiscau (ca ne saturait donc pas, mais spectres tres elargiS par diffusion multiples)
** Ecran fluo retracte + desynchronisation pour ne pas que le det Amptek CdTe sature
spectre enregistres
* prise d'une image du faisceau de rayons X
Fait
Remarques :
** Kicker d'extraction instable. (extraction après stockage ok), sans steerer
** Le centre du faisceau de rayons X bouge de plusieurs centimetres (sur la camera dans la X-hutch) en fonction de la phase e-/laser CFP
|
KD, RC; shift du 22 novembre 2024
|
9h30 : mise en chauffe
intervention casemate pour alignement laser et nettoyage optique.
11h : démarrage, charge énergie max 100pC pour atténuateur à 330pas, phase 187°
On charge la recette et on règle le linac (energie et phase); position TL/BPM.02 à 0, et min de dispersion (tout allumé)
11h34 : stockage immédiat dans l'anneau ! C'est TOP !
Après midi compliqué pour trouver les rayons-X et avoir un cavité stable.
synchronisation X :
* delay 33MHz/Trig ~ 2-4ns
* phase 500MHz CFP: 6.45V
prise de spectres X :
* déplacement du faisceau de rayonx X (à gauche et en bas) du à la nouvelle orbite
* spectro déréglé + trop de flux (saturation de l'acquisition)
Mise en place d'un "asservisement" du pointé d'injection dans l'anneau. Semble bien fonctionner (cf. screenshot), meme avec des variations d energie etc. Script dans : data/shared/commissioning_scripts/Linac/Alignements
18h30 : Stop ThomX
*** Programme prochain ***
* trend de flux avec asservissement du pointé d'injection
* affinement de la position du 0 du faisceau X
* mesure spectre angulaire
* prise d'une image du faisceau de rayons X
|
KD; laser PC 
|
Mesure de ce matin et réalignement:
sortie laser : 298uJ
sortie ligne de transport : 209uJ
sortie iris 1.3mm: 80uJ
Injection canon: 60uJ@420pas
voir image faisceau |
VM Entered by Super Team from 134.158.195.141 on Thu Nov 21 08:26:43 2024;
|
08H25 Start ThomX
09H45 HV is 'ON'
09h49 Breakdown in the RF Gun
09h45 Restart HV
Linac steerers H [2. 66 -4.45]; V [-2.00 2.31]
RF Gun Phase is 223 dg. Att. is 0.0, Charge is -84 pC, Sect. Phase 193 dg., Att. is 2.6 dB TL/BPM02 X 1mm
10h35 Ring Injection
11h00 Change RF to 500.0913
Tune 0.17
11h35 RF Gun Phase is 228 dg. Att. is 0.0, Charge is -50 pC, Sect. Phase 196 dg., Att. is 2.65 dB TL/BPM02 X 1mm
There was problem with section temperature. Fixed, Phases adjusted.
12h40 RF Gun Phase is 227 dg. Att. is 0.0, Charge is -40 pC, Sect. Phase 201 dg., Att. is 2.70 dB TL/BPM02 X =0 mm
17h15 STOP THOMX |
MJ VC KD RC DN; Shift summary 19/11/2024  
|
8h20 demarrage machine
iris 1.3mm
att 440
phase Qmax 280 110pC
QEmax 90pC Ekin 4.6MeV Etot 5.1MeV
arret pour cause d'alarme sf6 sur le MPS - cle thomx 0 pour verif pression : 2.4 mBar
Redemarrage
ph ch max 273
ph energie max -50
Recette 20241115_16_28_32
passage section
passage dipole - phase section disp min 207
Mesure energie YagTL1 Ekin=51.0
Faisceau sur Yag_TL3
Injection anneau
Relock de la cavite apres changement freq cavite RF
IP retrouvee - scan FPC pour mesure taille electrons : le flux X voit les kicks faisceau
Data a mettre en mode presentable ...
fin de shift 18h30
|
Entered by Nicolas Delerue from 134.158.195.144 on Fri Nov 15 12:13:26 2024; Charge excess in the TL 
|
By looking at the BPM transmission tool one can see that there is more charge on TL/BP.03 than on TL/BPM.02 (see attached image).
The BPM seetings have been checked and they are similar.
One can see a similar effect when comparing TL/ICT.01 and TL/ICT.02.
Possible interpretation: the beam is scrapping the beam pipe and creating a shower of secondaries. |
|