  1008   Tue Feb 11 10:31:57 2025 ND, Marie LabatUnder ProcessShift summaryDiag Streak camera 9:20 Start aligning

12:40 Alignement done for both
linac and ring.
 20250211_173802.jpg20250211_174708.jpg 
  945   Fri Oct 25 14:44:05 2024 ND, Manon Philit, Janine IssaUnder ProcessShift summaryLI Shift summary 25/10 9 : 34 Mise en chauffe

Health check OK (a part les Redpitaya)

10:25 démarrage faisceau
 2024-10-25_12_25_26_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_100.pngscan_2024_10_25_16_36.pngscan_2024_10_25_16_41.pngscan_2024_10_25_16_51.png 
  857   Tue May 14 11:12:18 2024 ND, MEKUnder ProcessShift summaryRF D1 Conditionnement section 8:45 Impossible de passer le modulateur
en standby.

Probleme d'eau.
 condj1.pdf 
  773   Thu Jun 22 09:26:38 2023 ND, LS, MB, DN, MA, IC, VK, MEK, JNC, MJ, RCUnder ProcessShift summaryRing | Ring Commissioning X-rays attempt 22/06 9:23: Mise en chauffe

9:29 Cycle magnets

10:20 Acces casemate cavite CFP
 10x 
  744   Fri Apr 28 09:20:00 2023 ND, LS, IC, VM, VKNew SolutionShift summaryRing Prise de donnee 27/4/2023 9:19: Mise en chauffe

10:24 Cycling magnets

10:50 Demarrage faisceau
 10x 
  751   Mon May 15 11:31:43 2023 ND, LS, IC, VK, VM, SWUnder ProcessShift summaryRing Commissioning Ring operation 15/5 10:00 Machine warm up

Magnets cycling

11:00 Start machine
 7x 
  760   Wed May 31 14:46:21 2023 ND, LS, IC, VK, VM Shift summaryRing Commissioning Studies on the Ring revolution frequency Goal: understanding of teh beam natural
revolution frequency. Study the effect of
the dipoles.
 8x 
  761   Wed May 31 21:36:49 2023 ND, LS, IC, VK, VM Shift summaryRing Commissioning RE: Studies on the Ring revolution frequency Bonjour,

Pouvez vous enregistrer les images
de l'oscilloscope et le donnée
  
  743   Thu Apr 27 09:24:26 2023 ND, LSNew SolutionShift summaryRing | Diag Prise de donnee 26/4/2023 9:24 Mise en chauffe

9:30 Cyclage des aimants

11h44 Démarrage faisceau
 2023-04-27_14_41_46_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png2023-04-27_14_43_34_el_dg_sst_01-ccd_01_RAW.png 
  778   Mon Jun 26 09:27:46 2023 ND, LSNew SolutionShift summaryDiag ThomX operations 26/6 9:26 Mise en chauffe

9:40 Cycling the magnets

11:45 Beam ON
  
  647   Thu Dec 8 10:05:38 2022 ND, IC, VK, VM, MEUnder ProcessShift summaryRing | Ring Commissioning Shift 8/12 9h: Mise en Chauffe modulateur + Frigo
+ Laser
Il n'y a plus de perte de pression
 14x 
  622   Thu Nov 3 09:18:49 2022 ND, IC, VK, VMNew SolutionShift summaryRing Shift àf 3/11/2022 9:10 Air pressure: 8 bars, water resistivity
6,33Mohm

9:15 Modulator warm-up
 9x 
  662   Fri Jan 6 09:17:54 2023 ND, IC, VK, VMUnder ProcessShift summaryRing Prise de donnee 6/01 9:15 Mise en chauffe modulateur

10:23 Temperature chiller incorrecte

11h Optilization of the beam for
 9x 
  992   Thu Jan 9 16:03:52 2025 ND, IC, VK, VMUnder ProcessShift summaryLE Optimisation LE 15h Scan extraction kicker vs EL/BPM.01.

See attached plots.

Some interferences with ring storage.
 scan_ext_kicker_from_-8150_to_-8050_step_5.pngscan_ext_kicker_from_-8100_to_-8080_step_1_v2.pngscan_EL_PS_DP_01.pngScreenshot_from_2025-01-09_17-49-53.pngScreenshot_from_2025-01-09_17-52-20.png 
  716   Thu Mar 16 10:15:13 2023 ND, Enzo Crou, Noé Idesheim, Jean-Nicolas QuenotNew SolutionShift summaryRing Commissioning Prise de donnee 16/3/2023 9:15 Mise en chauffe

10:30 Ronde casemate

10:40 Start beam
 17x 
  657   Thu Dec 15 23:59:29 2022 ND, Camille Cheney, Mohamed Under ProcessShift summaryRing | Ring Commissioning Prise de donnees 16/12 9h15 Les comptes operateurs etaient restes
allumes avec un message d'erreur indiquant
que la machine n'etait pas totalement
 9x 
  841   Mon Feb 5 09:13:15 2024 ND, Anna K, Elene K, Marie LNew SolutionShift summaryLI Prise de donneees 5/02 Coordinator: ND

9h12: Modulator start

PSS: Default centrale SSI
 mrsv_nobeam.pngmrsv_beam.png 
  835   Fri Jan 26 09:36:01 2024 ND, Anna K, Elene K Shift summaryLI | TL | LE Data taking 26/01 9:30 Warm-up

11:00 Modulator OFF => restart
warm-up
 7x 
  547   Wed Sep 14 23:06:40 2022 ND, AM, VC, ML, SCUnder ProcessShift summaryDiag | Ring Commissioning Programme faisceau 15/9 15-09-2022:

Marie Labat, VC, ND, AM

9h30 Mise en chauffe modulateur
 2022-09-15_scan_charge_phase.png 
  1133   Fri Oct 3 09:08:29 2025 ND VCUnder ProcessShift summaryLinac Commissionning Shift summary Demarrage machine 9H

test cyclage: OK (relecture courant
parfois NAN)
  