  1043   Fri Mar 21 07:43:44 2025 KD, VM, IC, RC, VC, SC, MJUnder ProcessShift summaryLaser | Opt | Linac Commissionning | Ring Commissioning shift du 21 mars 2025 

7h40: mise en chauffe de la machine en remote (modulateur, frigo/chiller, laser, cyclage aimants)

 

*** Programme de fin de semaine ***

matin : finalisation de la prise de donnée de la session imageries X

après-midi : libre pour continuer les actions sur la machine (passage 61.5MeV ?)

08h58 HV is 'On'

 RF Cav at 100 kV, phase is -39 dg.09h30 Beam is in the ring. RF gun phase is 240 dg. Sect phase is 206 dg. Att. sect. is 2.51 dB, TL/BPM2 x=2 mm, charges: -110 pC, -109 pC, -120 pC,

Linac steerers: H [0.75 -2.81], V [-2.46 2.89]

09h38 Vertical scan by FPC table

10h45 RF cav. at 200 kV, phase is -39 dg.

13h17 RF cav. at 200 kV, phase is -42 dg. RF gun phase is 235 dg. Sect phase is 209 dg. Att. sect. is 2.55 dB, TL/BPM2 x=3 mm, charges: -110 pC, -110 pC, -121 pC,

14h00 Problems (micro blackout). Modulator turned off, dipoles turned off, RF resonator turned off, 500 MHz signal missing. Trying to restart.

15h03 HV is 'ON'

16h46 Stop ThomX

  1042   Thu Mar 20 18:41:55 2025 Entered by Marie Jacquet from 134.158.205.16 on Thu Mar 20 18:41:39 2025 Shift summaryLI | Ring | Linac Commissionning | Ring Commissioning 19 et 20 mars - Mesures X-rays - Bravin & co 

19 mars 2025

Photonic juste derriere hexa échantillon 

  • Lag time
  • PMMA
  • 2D : Resolution detecteur - To-MTFHexa échantillon
  • 2D : TOR-MAM off-axis (énergie 42 keV - cf spectre) – Hexa échantillon
  • Tomo : Micro-CT-bar-pattern Hexa échantillon
  • Tomo : Micro-CT-contraste-scaleHexa échantillon

20 mars 2025

Contraste de phase : Photonic au fond de la X-Hutch

  • 2D : Fil pêche - Hexa mono
  • 2D : Fleur - Hexa mono
  • Tomo : micro-CT-bar-patternHexa échantillon
  • Tomo : FleurHexa échantillon
  • Vers 14h30 : 2D : File de pêcheHexa monosingle shot
  • 2D : AraignéeHexa mono
  • Tomo : plusieurs piments dans une boite – Hexa échantillon
  • 2D : TOR_MAMHexa mono - Images du bas du phantom, tous les 10 mm Tx.
  • 2D : Fil de pêcheHexa monoPlusieurs single shots

 

  1041   Thu Mar 20 07:39:28 2025 KDUnder ProcessShift summaryLaser | Opt | Linac Commissionning | Ring Commissioning shift du 20 mars 2025 

7h40: mise en chauffe de la machine (modulateur, laser, frigo/chiller, cyclage aimants)

 

*** Programme imagerie X ****

- radiographie en contraste de phase

- Tomographie en contraste de phase

8h40 HV is 'On'

10h13 Beam in the ring. RF Gun phase is 233 dg., Sect. phase is 209 dg. Att. sect. is 2.54 dB, TL/BPM2 x=1.5 mm. RF Cav at 200 kV , phase -38.5 dg.

The FPC phase was adjusted to maximize I3 current (between 25000 and 30000).

10h46 Charges: -145 pC, -145 pC, -160 pC. Have a growing trend.

10h50 The RF gun phase was set to 226 dg. to restore storage and x-ray. The injection is very unstable.

11h43 RF gun phase 219 dg. Sect. phase 209 dg. RF cav. phase -43.5 dg. I3 curr. from 40000 to 50000

12h27 RF gun phase 218 dg. Sect. phase 207 dg. Att. 2.48 dB, TL/BPM2 X=1.5 mm to 2 mm, RF cav. phase -43.5 dg., 200 kV, I3 curr. around 40000 pA

16h45 RF gun phase 215 dg. Sect. phase 209 dg. Att. 2.51 dB, TL/BPM2 X= 2 mm, RF cav. phase -46.5 dg., 200 kV, I3 curr. around 40000 pA

17h28 RF gun phase 214 dg. Sect. phase 211 dg. Att. 2.56 dB, TL/BPM2 X= 2 mm, RF cav. phase -46.5 dg., 200 kV, I3 curr. around 40000 pA

18h57 Stop ThomX

  1040   Wed Mar 19 07:52:46 2025 KD, IC, RC, HG, DNUnder ProcessShift summaryLaser | Opt | Linac Commissionning | Ring Commissioning shift du 19 mars 2025 

7h50: mise en chauffe de la machine en remote (modulateur, frigo/chiller, laser, cyclage aimants)

 

*** Programme de la 2e semaine de prise de données imagerie X ***

REPEAT
. Lag time measure with different exposure time, last time we did 200ms, go lower.
. Noise Power Spectrum, acquire 20 images with 2 thickness, for example 0 and 3 cm plexi.
. MTF one acquisition 
.Tomography
 
NEW
. Wire
. Wedge Phantom
10h44 Beam is in the ring. RF Gun phase 10 dg., Sect. phase 207 dg., Sect. Att. 2.59 dB, Charges: -137pC, -135 pC, -147 pC
Linac steerers: H [0.55 -2.82], V [-2.62 2.86], TL/BPM2 X=4 mm -> 3 mm
11h09 RF Gun phase 11 dg., Sect. phase 208 dg., Sect. Att. 2.53 dB,
12h15 RF Gun phase 2 dg., Sect. phase 207 dg., Sect. Att. 2.61 dB, TL/BPM2 X=3 mm, RFCav. 150 kV Phase -19.5 dg.
13h49 Linac was readjusted: Gun phase -2 dg., Sect. phase 212 dg., Sect. Att. 2.53 dB, TL/BPM2 X=4.3 mm, RFCav. 150 kV Phase -19.5 dg.
14h07 Linac was readjusted: Gun phase -4 dg., Sect. phase 216 dg., Sect. Att. 2.53 dB, TL/BPM2 X=4.3 mm, RFCav. 150 kV Phase -19.5 dg. I3 current around 40000 pA
17h04 Linac was readjusted: Gun phase -6 dg., Sect. phase 217 dg., Sect. Att. 2.55 dB, TL/BPM2 X=3.7 mm,
18h51: stop thomx

  Draft   Tue Mar 18 07:56:38 2025 KD, IC, RC, DN, VMUnder ProcessShift summaryLaser | Opt | Linac Commissionning | Ring Commissioning shift du 18 mars 2025 - Mesure tailles transverses H et V de la source 

7h55: mise en chauffe en remote (modulateur, laser, frigo/chiller, cyclage)

*** programme ***
     - préparation de la machine pour la seconde session d'imagerie (du 19 au 21 mars)
     - mesure et optimisation de la longueur de paquet dans le linac

-----------------------------------------------------------------------------

09h20 HV is 'ON'
09h30 RF gun phase is 10 dg., Sect Phase is 209 dg. Sect Att. is 2.57 dB, Charges: -107 pC
09h45 the modulator was set to the standby mode. Access to the bunker

Mesures X-rays in X-Hutch

 ** Verification Photonic Science avec le cable "Soleil" : ok

 ** Mesures tailles transverses source (H et V):
      Fermeture partielle des fentes 1
      Det Photonic sur bras detecteur (a 280 mm du zero hexapode)
      Prise d'images des bords de la fentes (a differents voltages cavite RF, de 50 a 280 kV)

19h10 Stop ThomX

  1038   Fri Mar 14 08:31:19 2025 VM Entered by Super Team from 134.158.195.142 on Fri Mar 14 08:31:03 2025Under ProcessShift summaryLI | Diag Streak camera measurements 

08h28 Start Thomx: Modulator, Laser, Frig

08h33 Chillers were started, cycling al magnets

9h00 MPS affichage: Arret d'urgence... Appel Nourredine, probleme resolu.

9h30 Laser aligned on streak camera

Fix technical issues.

11:00 First measurements with streak camera

13:00 Viktor repotimizes the linac.

New measurements.

Measured length 9.2ps, including ~1ps due to spot size.

Shot to shot jitter ~2.9ps (over 100 shots).

16h10 Vacuum interlocks V1

New measurments, the phase has drifted. Bunch is longer.

17h00 Stop ThomX

  1037   Thu Mar 13 11:57:19 2025 Entered by Viktor Soskov from 134.158.195.153 on Thu Mar 13 11:57:03 2025FixedInfoLaser Etat laser 

Voici les distibutions UV laser sur lacathode avant et apres l'alignement

  1036   Thu Mar 13 11:25:29 2025 Entered by Viktor Soskov from 134.158.195.153 on Thu Mar 13 11:25:13 2025FixedLinacLaser Etat laser 

Bonjour, le parcours optique a ete realigne.

L'enegie UV sur la cathode = 48uJ , Iris = 1.3mm, Att = 410

  Draft   Thu Mar 13 08:29:34 2025 VM, VC, RC, ICUnder ProcessShift summaryRing Commissioning   

08h27 Start ThomX: Modulator, Laser, Frig

08h34 Chillers were started, cycling al magnets

12H ready to start beam ( 13H30)

alignement laser done (alignement to do)

13h20 HV is 'ON'

13h31 RF Gun phase is 95 dg. the laser iris is 1.3 mm, the laser att. 340, RF Gun charge is -120 pC (the laser spot position was Hor. 4.282 mm, Vert. 3.327 mm ), screenshots of Li/SST1

13h35 laser spot alighment started at RF gun phase of 145 dg.

13h36 New position of the laser spot is: Hor. 4.282 mm, Vert. 3.327 mm 

13h44 the modulator was put into standby mode, access to the bunker

14h13 HV is 'ON'

Two plots beam on LI STT 0.1

new receipe all 2025 03 13  14 46 52 

Charge 120pC

RF power 150KV

17h12 RF gun phase 92 dg., Sect. phase 211 dg. I TL DP =159.3 A, TL/BPM X=4 mm, RF cav. 150 kV, phase -15 dg. Sum of TBTSum =1.8e11, Charges: -142 pC,-140 pC, -152 pC, I3 25000 pA

17h31 Adjusting ring lattice to rise X rays. I3 max was 45000 pA

18h29 Stop thomX

 

 

 

 

  1034   Wed Mar 12 16:50:29 2025 Entered by Super Team from 134.158.195.143 on Wed Mar 12 16:50:08 2025 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Spectres X (positions fentes 2 et temps d'extraction) 

IP-Fente2 : 8835 mm
IP-capteur_CdTe: 10460

Calib ouverture Fentes2 : +0.1 en H / -1 en V

Fentes2 ouvertes a 0.5x0.5 mm ( ==> 0.6 H -0.5 V)

SPECTRES pour positions Fente2 (mm) : H Fente2 (H hexa ech) / V Fente2 (V hexa ech)

** V fentes2 = 27.5 mm

H fentes2
7.5 mm (-9.6)
5.5
3.5
1.5
Viktor reajuste electrons
-1.5
-6.5
7.5bis
9.5(-12.0)
11.5(-14.4)
13.5(-16.8)
15.5(-19.2)
18.5
21.5
25.5(-31.2)
30.5(-37.2)
35.0
45.0
Kevin reajuste laser and electrons
11.5bis
Fentes1 fermees a 5x5 mm (fentes2 11.5/27.5)
Fentes1 reouvertes

** V fentes2 = 29.5 mm (hexa 142.4)  vers ~15h

H fentes2
11.5
13.5
15.5
9.5
7.5
2.5(-3.6)
20.5(-25.2)

** V fentes2 = 31.5 mm (hexa 144.8)  vers ~15h30

H fentes2
20.5
15.5
13.5
11.5
9.5
7.5
2.5

** V fentes2 = 36.5 mm (hexa 150.8)  vers ~15h50

H fentes2
2.5
9.5
11.5
13.5
20.5

** V fentes2 = 45.0 mm (hexa 161.0)  vers ~16h10

H fentes2
20.5
11.5
2.5
-20(23.4)

** V fentes2 = 25.5 mm (hexa 161.0)  vers ~16h25

H fentes2
2.5
11.5
20.5

** V fentes2 = 20.5 mm (hexa 131.6)

H fentes2
20.5
11.5
2.5

========================================

Spectres a differents temps d'extraction

Extraction electrons a 5 ms, 10, 15, 20, 1, 50, et 100=recette Kev

=======================================

fin de shift 19h

 

 

  1033   Wed Mar 12 07:52:55 2025 KD, VM, MJ, DN, RC, ICUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 12 mars 2025 

7h50 : mise en chauffe machine (modulateur, frigo/chillers, laser, cyclage aimants)

 

**** Programme de la journée ****

- Mesure spectre angulaire (déplacement spectromètre dans le faisceau de rayons-X)

- Mesure spectre sur l'axe à différentes longueur de stockage

12h38 Beam is in the ring. X ray spectrum measurements. Parameters:

RF gun phase is 103 dg., Sect phase is 219 dg., Att. is 2.499 dB, TL/BPM2 X=+3 mm, Charges; -106 pC, -103 pC,-114 pC, the ring RF 150 kV, Phase -13 dg. 

12h45 Vacuum interlock V1

13h12 RF gun phase is 97 dg., Sect phase is 212 dg., Att. is 2.449 dB, TL/BPM2 X=+3 mm, Charges; -104 pC, -105 pC,-115 pC, the ring RF 150 kV, Phase -13 dg. TBTSum=1.4e11

  1032   Tue Mar 11 14:31:06 2025 VMUnder ProcessShift summaryLinac Commissionning   

14h31 Start ThomX/ Modulator, Frig, Laser

14h37 Cycling all magnets, Chillers started

15h34 HV is 'On'

There are problems with the servers. Therefore, some tools are not working: Trends,  Camera Laser and so on.
Servers restarted, we also used script from Kevin to restart properly DSs.
Beam Charge : 70 pC !!! RF gun phase is set to 109 dg.

17h30 Linac steerers H [0.67 -2.77], V [-2.95 3.19], RF Gun phase   214 dg. Att. 2.47 dB.

Measure dispersion in the TL

18h45 QP4 - QP7 set to 0

Screenshots of TL orbit for different Att.

18h53 HV is 'OFF', Stop thomX

 

  1031   Fri Mar 7 11:03:20 2025 Entered by Super Team from 134.158.195.141 on Fri Mar 7 11:03:05 2025Under ProcessShift summaryLI | Diag Test streak camera 7/03 

9:10 Debut alignement

10:30 Mise en chauffe machine

10:45 Fin alignement

11:30 Demarrage

Puisance reflechie tres forte... On redescend en tension.

Pas de laser sur la camera. Le voyant "Danger laser" n'est pas allum'e en salle laser.

12:45 Toujours pas de laser, machine mise en standby.

Probleme gate_int?

13h50 Laser is back!

On parvient a transporter jusqu'a la camera streak mais on ne voit pas le signal sur la camera...

Realignement...

Toujours rien...

16h50 Arret faisceau

 

 

  1030   Thu Mar 6 10:38:31 2025 Entered by Marie Jacquet from 134.158.205.25 on Thu Mar 6 10:37:50 2025 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Programme de la journee : preparation des valeurs a remplir  

1 : Alignement Axe Q1-Q3 avec SCRIPT - Conditions : 5Hz et Q2 = 0

Str1_H =0.49
Str1_V =-3.10
Str2_H =-2.85
Str2_V =3.29

Feedback linac mis sur ON
Mesure avec Q1 Q3 ON

bpmTL1_X =-0.56 / -0.50 / -0.54
bpmTL1_Y =0.02 / 0.04 / 0.01
YagTL1_X =338 / 348 / 347
YagTL1_Y =268 / 269 / 264

2 : Determiner StrTL1_V pour passer au centre de Q4

StrTL1_V=0

Repasser en Linac

bpmTL1_X = pas remesure
bpmTL1_Y =   ¨
YagTL1_X =    ¨
YagTL1_Y =    ¨

3 : Determiner StrTL2_V pour passer au centre de Q5

StrTL2_V = -8.10

4 : Determiner StrTL2_V pour passer au centre de Q6 - Condition : eteindre Q5

StrTL2_V = -7.90

5 : Determiner StrTL2_V pour passer au centre de Q7 - Condition : eteindre Q5 et Q6

Pas possible d'eteindre Q5 et Q6 a la fois. On se met a Q5 =0 et Q6=-4
150 microns de variations avec +/-3 ampere sur Q7

==> centre Q7 ok avec la valeur str de Q6

Courbe ROSE sur la pj

--------------------------------------------------------------------------------------------------------

6 : Refaire de 2. a 5. avec un autre axe LI en modifiant StrLI1_V et/ou StrLI2_V (la position faisceau doit etre bien differente sur YagTL1, autant qu faire se peut)

Str1_H =
Str1_V = -2.60
Str2_H =
Str2_V = 3.29

6/2 : Determiner StrTL1_V pour passer au centre de Q4

StrTL1_V= -5.6

Repasser en Linac

bpmTL1_X = -0.38 / -0.40
bpmTL1_Y = 1.98 / 2.07
YagTL1_X =  402 / 402
YagTL1_Y = 275 / 274

6/3 : Determiner StrTL2_V pour passer au centre de Q5

StrTL2_V = + 8.7

Courbe BLEUE CLAIRE sur la pj

--------------------------------------------------------------------------------------------------------

On recommence encore avec un autre axe

7 : Refaire de 2. a 5. avec un autre axe LI en modifiant StrLI1_V et/ou StrLI2_V (la position faisceau doit etre bien differente sur YagTL1, autant qu faire se peut)

Str1_H =
Str1_V = -3.2
Str2_H =
Str2_V = 3.29

6/2 : Determiner StrTL1_V pour passer au centre de Q4

StrTL1_V= +2.3

Repasser en Linac

bpmTL1_X = -0.34 / -0.33
bpmTL1_Y = -1.19 / -1.18
YagTL1_X =  403 / 403
YagTL1_Y =
256 / 256

6/3 : Determiner StrTL2_V pour passer au centre de Q5

StrTL2_V = ¨-15 ... 17¨ estime car en bout de course

Courbes ROUGE sur la pj (2 courbes pour 2 steerers StrTL2_V differents , mais ca ne change presaue rien)

==> On ne comprend rien (bug code reconstruction peut-etre?)

==================================================

18h Etude kicks faiscau sur LI (Yag et BPM)

Steerers OFF
Soleno 200

Kicks visibles sur Yag (cf screenshot)
Correles avec jauge 2 et jauge 3
Kicks declenches par la jauge 3 (puis la jauge 2 se declenche juste apres) - Vu en direct - Data sauvees

19h fin de shift

===================================================

Post shift : autre reconstruction des axes Quads, avec un code "Marie" - Cf pj

 

 

 

 

  1028   Wed Mar 5 08:53:34 2025 VM, VC, RC, DNUnder ProcessShift summaryRing Commissioning   

08h53 Start ThomX

11h10 The oscilloscope installed in the bunker

11h11 HV is 'On'

11h45 The beam is in the ring

12h10 The modulator set to the Standby mode. Access to the bunker

12h24 HV is 'On'

12h30 RF Gun Phase is 15 dg., Sect. phase is 204 dg., Att. is 2.503 dB, TL/BPM2 X= 4 mm, Charges: -108 pC, -108 pC, -120 pC  

12h35 Feedback on linac injection was started

13h00 Measurement of the stability of the temporal position of electron and photon bunches at the IP. RF Cav. at 200 kV, Phase 35 dg.

13h07 The linac was adjusted: RF Gun phase 10 dg., Sect phase 199 dg. Charges: -100 pC,-99 pC, -110 pC, Inj. qual. 0.965, Storage qual. 0.802

14h26 The linac was adjusted: RF Gun phase 11 dg., Sect phase 203 dg. Charges: -99 pC,-99 pC, -109 pC, Inj. qual. 0.984, Storage qual. 0.747, X ray flux I3=25000 pA

Phase between electron beam and FP photon have been done (attachements will come later) (Electron beam is a pickup (150ps fall time) at the IP and Photon beam  is a photo diode (300ps rise time) at the FP cavity output).

time jitter is measured as the time difference between the two ulses at a fixed treshhold of 10mV)

measurements show a 33ps FWHM jitter (15ps)   as long as the FPC is locked on the 500MHz . the jitter mainly come from FPC (see post FPC : https://elog.lal.in2p3.fr/FPC/THOMX+commissioning/416)

15h35 The linac was adjusted: RF Gun phase 19 dg., Sect phase 212 dg. Charges: -105 pC,-104 pC, -115 pC, Inj. qual. 0.988, Storage qual. 0.786,

17h45 Stop ThomX

 

  1027   Tue Mar 4 18:42:57 2025 Entered by Super Team from 134.158.195.141 on Tue Mar 4 18:42:42 2025Under ProcessLinacLI | TL Conditionnement Canon 

1- Conditionnement du Canon à 16 dB, on gagne un peu en vide. 

2- sautes du faisceau : vérification du signal avant la section. 

Signal visible sur les positions, voir les 2 images, avec ou sans steerer. 
hypothèse :

- si pas de saute sur le BPM-LI : le soucis est après le BPM, ou bien au niveau du BPM 
- sauf si le BPM n'est pas assez sensible, ou bien pas assez de recul pour un signal perturbé en amont. 

l'amplitude du signal semble aussi varier avec la taille faisceau. Pas de mesure systématique. 

 

18h45 : On ferme  

  1026   Tue Mar 4 11:49:34 2025 KDReference SolutionInfoLaser | Opt realignement laser PhotoCathode 

Sortie laser 260 - 265uJ

Injection ligne de transport 240uJ

point initial : 
Sortie ligne de transport 140uJ
Sortie iris 1.3mm 42uJ
Sortie iris full 124uJ

Injection canon (420 pas), 1.3mm 40uJ
Injection canon (420 pas), full 110uJ

Nettoyage optique :
Injection canon (420 pas), 1.3mm 40uJ
Injection canon (420 pas), full 107uJ

Déplacement M5 + réalignement :
Sortie ligne de transport 140uJ
Sortie iris 1.3mm 50uJ
Sortie iris full 130uJ

Injection canon (420 pas), 1.3mm 40uJ
Injection canon (420 pas), full 110uJ

 

Image faisceau avant et après intervention.

  1025   Tue Mar 4 09:03:11 2025 KDUnder ProcessShift summaryLI | Laser | Opt | Linac Commissionning shift du 4 février 2025 

7h40: mise en chauffe en remote laser PC

9h : mise en chauffe modulateur, chiller/frigo

9h10 :  accès casemate pour réalignement laser PC

  1024   Fri Feb 28 00:32:21 2025 Entered by Marie Jacquet from 134.158.205.38 on Thu Feb 27 23:45:19 2025 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning 27 fevrier (visite Alberto Paola Luca)  

** Nouvelle prise d'images pour determiner les distortions du det :
        Ouverture fentes de 300 x 300 microns. Fentes fixes. Balayage du Photonic installe sur l' hexapode echantillon
        Manip tres longue ... (pb de script, pb avec le DS Hexapode qui bloque tout le temps, pas d'X-ray, etc, etc).
        Fin de manip vers 16h15  ....

** 16h15 : installation du Photonic tout au fond de la X-Hutch sur le support "Denis D." pour manip contraste de phase

** Deux Manips Contraste de phase :

1) Echantillon : 2 fils de peche tires horiz et verti sur une diapo (fil de peche : seulement 1% d'absoption) - Positionne sur l'hexa monochromateur -
    Distance echantillon-detecteur ~  4.5 m
    Prise d'images ==> il semble qu'on voit les fils - Data a traiter
    Remarque : on a oublie d'aligner le centre de la croix sur la partie basse du Photonic (la seule partie qui ne "saute" pas) ==> Manip a refaire 

2) Fantome TO_MAM - Positionne sur l'hexa echantillon
    Distance echantillon-detecteur ~  3.7 m
    Meme remarque : det non positionne partie basse ==> Manip a refaire
    Prise d'image ==> On ne voit rien - Data a traiter


 

  1023   Thu Feb 27 07:37:25 2025 KD, VM, SK, NDUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 27 février 2025 

7h45: mise en chauffe en remote (Frigo/chiller, laser, cyclage aimants)

Le Modulateur ne répond pas et ne veut pas passer en STANDBY ==> need to go on site

Problème d'intelock sur le refroidissement d'eau ==> redémarrage du PC modulateur ==> problème résolu ==> mise en chauffe à 8h30

9;35 Modulateur en trig

Receipt from 20250226_15_02_26

9:57 Beam in ring, Xray

RF Gun phase is 25 dg., Sect. phase is 206 dg., Att. 2.56 dB, TL/BPM2 SPx=2 mm. Charges from BPMs: -85 pC, -83 pC, -91 pC Linac steerers as in the receipt.

RF Cav. Volt. 200 kV, 35 dg.

11h45 Sum of the TBTSum =1.15e11, FPC power is 88 W, I3 current around 20000 pA, the kicker voltage was set to 9368 V (about 11h10) to rise X ray flux

12.30 RF Gun phase was set to 22 dg. to rise flux to 20000 pA, TL/BPM2 SPx=3 mm

15h42 The gun phase was set to 10 dg. sect phase 203 dg. with TL/SST2. TL/BPM2 SPx=2 mm

17:42 Stop ThomX