933
|
Fri Oct 4 08:31:27 2024 |
vc, VM,VK, IC | Under Process | Shift summary | Linac Commissionning |
|
Shift summary | |
démarrage chauffage 8h30
9h45 demarrage faisceau
12h Ring studies
RF Cavity on. Turns off afre 1 min by it elf reduces power to 0
Several times press start - RF Cavity OK
Orbit correction.
Dispersion measurements.
Stable storage.
slooooow computer
18.05 End shift.
|
| Attachment 1: Screenshot_from_2024-10-04_14-53-14.png
|
 |
|
1015
|
Wed Feb 19 17:32:30 2025 |
shift screw | | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Rustine pour le probleme CEM kicker - ring storage - Xrays | |
Cable ventilo kicker debranche ==> aucun effet
Cable balise blinde ==> la balise redevient calme
Redemarrage
Stockage dans l'anneau (recette je ne sais pas laquelle) - Recherche synchro X ==> screenshot
* Fin de journee, pour la 3eme fois la communication avec l'ampli laser FPC fortement perturbee .....
* Probleme sur la voie 4 pico 3 (2diodes detector) ==> sceenshot |
| Attachment 1: storage_et_Xrays_2025-02-19_19-01-58.png
|
 |
| Attachment 2: det2diodes_pb_voie4_2025-02-19_19-16-07.png
|
 |
|
1017
|
Fri Feb 21 08:30:30 2025 |
shift crew | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 21 février 2025 | |
8h30 : démarrage machine en remote (modulateur, laser, chiller/frigo, cyclage)
Nouveau pb : variation du flux X lente
incomprehensible car cavite lockee et electrons stockes.
Le faisceau se deplace sur le dectris X_hutch lorsque le flux varie
Tests chqngement leger de frequence RF cavity :
- ** Avant 15h : 500.10045 MHz
- ** 15h : 500.1003 MHz ==> variation est devenue tres reguliere ...
- ** 15h26 : 500.100 MHz ==> idem, tres reguliere
Pas le meme comportement a 500.10045 MHz compare a 500.1003 et 500.100
On veut revenir a 500.10045
Miss triggers, puis juste apres plus de synchro du tout pour toute la machine !
Appel Vincent. Ronic teste la carte. Rien ne semble defectueux - Sur le gene 33 MHz, juste le fait d'appuyer sur le bouton ch1 ==> probleme resolu !
16h30 : Redemarrage faisceau
Retour a 500.10045 - Toukours pareil (fluctuation flux X)
17h23 "integrateur FPC" ==> BINGO !!!
17h45 : Optimisation position verticale table FPC
18h45 Scan flux 27000 pico ==> screenshot
19h20 fin de shift
|
| Attachment 1: pico_2025-02-21_15-35-28.png
|
 |
| Attachment 2: pico_freq500.10045_2025-02-21_15-25-03.png
|
 |
| Attachment 3: pico_freq500.1003_2025-02-21_15-27-07.png
|
 |
| Attachment 4: pico_freq500.100_2025-02-21_15-34-12.png
|
 |
| Attachment 5: pico_BINGO_2025-02-21_17-42-02.png
|
 |
| Attachment 6: TREND_pico_20minutes_2025-02-21_19-09-26.png
|
 |
|
939
|
Wed Oct 9 08:04:20 2024 |
shift team | Under Process | Shift summary | Linac Commissionning |
|
Production de rayons X | |
demarrage machine 8h
11h: modulateur passe sur "OFF" sans raison apparente.
12h: faisceau en route
Programme :
* injection faisceau dans l'anneau
Phase canon charge max (86°)
Energie Max (36°) avec 100pC
- On essaye d'optimiser l'injection et le stockage car le stockage n'est pas "bon" beaucoup de perte
* Stockage puissance Laser
* Recherche des rayons-X en phase (500MHz, 33MHz)
- Pas de rayons-X visible à première vue. On bouge la table hexapode pour trouve le faisceau
- On scan la table Optique en vertical (en mode désynchro). On trouve les rayonsX vers -1.85mm en Z
- On essaye de synchroniser
Phase 500MHz (ER/CA/RAC.05-API.AO1/A06), 6.2V
Phase 33MHz 265°
Delay scope Laser/Trig : 1.25ns
On fait un scan vertical de la table en désynchronisé (impossible en synchrone)
(~80 pC injecté et ~ 83kW dans la cavité)
* Mesure flux, stabilité spectre des rayons-X
Le flux est assez instable à cause de la machine et ou des jitters de synchronisation (on mesure ~ 0.6-0.7 10^10 ph/s : 15 - 20 10^4 pA)
Vers 18h :
La charge est devenue tres instable vers 18h car le feedback ne fonctionnait plus (etait coché pourtant). On l'a redémarré. Stabilité charge revenue apres.
Idem TBT sum trend plus stable après.
|
| Attachment 1: Scan_vertical_recherche_rayonsX.png
|
 |
| Attachment 2: Synchronized_Xray.png
|
 |
| Attachment 3: tbtsum_trend_all.png
|
 |
| Attachment 4: charge_18h.png
|
 |
|
501
|
Fri Jul 8 09:06:19 2022 |
mo | | Shift summary | RF D1 |
|
| |
9h05 remplissage réseau eau, mise en route modulateur et frigo-chillers
pB modulateur! chauffage redemarre à 50% (scandinova est contacté) constatation Courant chauffage filament Klystron a baissé (touche la limite basse)
arret de la machine!
|
|
449
|
Mon May 9 11:06:48 2022 |
maher | | Shift summary | Linac Commissionning |
|
| |
Après discusion avec Victor, j'arrete le modulateur et chillers, peut-etre re-démarrage en milieu de l'aprem! |
|
635
|
Tue Nov 29 18:43:58 2022 |
cb/ hg/sc/jnc | | Shift summary | Linac Commissionning |
|
run du 29 nov 2022 | |
On teste le modèle MML avec un seul quad : QP1 par exemple
conditions :
- Col -> 180A
- Alignement sur QP1 et QP3 : LI : STR1 H: -1.27 V : 0.35 TL_STR01 H : -4.30
- Phase Qmax : 200°
- Iris : 0.8
- Att : 300
SigX = SigY = 0.23 mm sans Qpole
BetaX = 5.7 BetaY = 3.6
EpsX = 1.1 EpsY = 1.40
Modèle concorde avec les mesures. Soft matrice épaisse sans MML.
--> Mesures sont @ 18h44 dans mesure du jour
Maintenant essais sur QP3 :
On retrouve les memes valeurs des émittances
EpsX = 1.1
EpsY = 1.3
Par contre pas les betas ...
BetaX = 3.96 et BetaY = 4.9
La reconstruction pour I=0 nous redonne les bonnes valeurs de taillle à l'écran.
|
|
777
|
Fri Jun 23 13:56:03 2023 |
all | | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
X detectes aujourd'hui | |
Aujourd'hui on a detecte des X en mode desynchro (notre signal correspond a ~ 3.10**6 ph/sec)
*** Pour :
- 100 pC stockee pendant 100 ms
- 30 kW dans la cavite
- mode desynch
- taille e- ~ 150 micons rms,
notre estimation du courant dans la p-diode det Fluo ligne X etait de ~ 25 pA
*** Trend de la p-diode ecran fluo ligneX en pj.
*** Tests realises pour etre surs :
On a delocke le laser : bruit laser ~ 20 pA sur notre pdiode
On a ferme puis ouvert le shutter e- laser locke : aucune difference de signal sur la p-diode (= aucun bruit venant du stockage des e-)
On a verifie qu'en bougeant "beaucoup" la table FPC en config shuter e- ferme, le signal du au laser FPC etait le meme
On a bouge la table en verticale et horizontal suffisamment pour identifier un maximum sur le signal.
Merci a tous et bon we
|
| Attachment 1: 2023-06-23-Shift.pdf
|
|
799
|
Mon Oct 2 17:18:39 2023 |
Vincent-Nicolas | Fixed | Other | SY |
|
Mode de fonctionnement en place pour la synchro | |
Nous avons déployé un déphaseur 500MHz vers la cavité Fabry Pérot (180° de phase) ER/CA/RAC.05-API.AO1/AO6
Un déphaseur 33MHz est déployé sur le 33MHz ri ER/CA/RAC.05-API.AO1/AO7
le systeme est revenu à un seul synthé coté Ring
le programme CPLD (sychro 500MHz OK) 33*41 1 coup /5 est chargé
le jitter entre les 500MHz Li et Ri est de l'ordre de 15ps sDev (très grand pour cette configuration)
le jitter entre le 41.6MHz li et le 500MHz li est mesuré à 10ps sDev en entrée du chassis synchro (c'est beaucoup trop) ==> à vérifier
|
|
659
|
Tue Jan 3 09:30:12 2023 |
Vincent Maher Sophie | Fixed | Linac | Linac Commissionning |
|
Demarrage machine | |
8h15
modulateur en local pas possible de démarrer à distance.
chauffages canon et section démarrés
9h30
arret chauffage => pB pression dans circuit refroidissement (pression à 0Bar)
Maher remet en pression (4 bars) il y a peu etre une fuite sous la pompe principale
9H45
demarrage modulateur à distance
demarrage chilliers et frigo
résistivité baie 16 5.6 MOhms
pression d'eau pompe en route 3.6Bars
ATTENTION: le vase d'expension a été changé (inspection de Jean Noel) la pression était à 0 Bar et la pompe a fonctionné toute la nuit!!!!!!
demarrage trigger klystron => OK HT 1090
scan charge phase done
Charge max 236° 125pC
attention on observe un pic en fin de signal sur Pigun et PiLIL
arret à 12h
redemarrage 13H30
HT1090V
optimisation du laser sur la photocathode (position iris H4.59 V2.75)
Q max 135pC iris 1.3mm
attention relecture courant TL/PSDP.01 dans IHM powersupply ne se fait pas
16h
Arret machine: pB réseau d'eau: la vanne de remplissage du réseau est restée ouverte toute la journée ! la résistivité de l'eau est à 4.6MOhms on arrete les alimentations et la machine
|
| Attachment 1: scan_charge_phase_min_180.0_max_260.0_11_5_33.png
|
 |
| Attachment 2: Screenshot_from_2023-01-02_16-17-36.png
|
 |
|
566
|
Mon Sep 26 16:30:56 2022 |
Vincent Chaumat | Under Process | Linac | LI | Linac Commissionning |
|
Mesure puissance Canon et section | |
Mesure de la puissance dans la bouble (cristal + redpitaya)
mesure sur les 20 derniers points de l'impulsion RF
la variation de la mesure (en tension) est inférieure à 2mV peak to peak ie 1% de la mesure
Mesure de la puissance incident section (cristal + redpitaya) (atténuateur guide -10dB)
mesure sur les 20 derniers points de l'impulsion RF
la variation de la mesure (en tension) est de 4mV peak to peak ie 12% de la mesure
|
| Attachment 1: pBoucle.png
|
 |
| Attachment 2: Pisection.png
|
 |
|
1239
|
Mon May 11 09:33:17 2026 |
Vincent | Under Process | Linac | LI | TL |
|
Manip Gplast | |
9h30 test radioprotection OK (mesure en dessous du bruit de fond)
13h30 fenetre installée pompage en cours
14h fin de l'intervention
|
|
1065
|
Tue May 6 11:38:24 2025 |
VS, AG, KD | New Solution | Info | LI | Laser | Opt | Linac Commissionning |
|
changement PhotoCathode |
|
lundi 5 mai : remise à l'air et démontage de l'ancienne cathode (Cu)
- Le faiscea laser est remis sur les réferences et le faisceau passe au travers de la cathode trouée (OK pour le Mg). NB. Le trou de la cathode trouée fait la taille de la pastille de Mg. (cf. Photos)
- démontage et inspection du hublot et miroir de renvoie sous vide (démontage de l'ICT pour accéder au miroir de renvoie) :
* le Hublot semble ok mais il est salle sur la face à l'air ==> nettoyage
* le miroir de renvoie est piqué (impacts laser) de plus il est éclaté (casse du substrat sûrment dû à des arcages) ==> changement du miroir
** Impossibilité de le mettre sans réhausse en fasse arrière (clinquants).
** Les griffes de maintien sont mises plus fortement en appuis sur le miroir.
** Contact électrique vérifié entre la face avant (dépôt argent) et le support.
mardi 6 : alignement laser sur la cathode trouée
- le faisceau est réaligné au centre de la cathode trouée. Nouvelle position de référence sur la caméra PhotoCathode [H,V] = [5.55, 3.35]
- mesure de puissance laser Photocathode :
sortie Iris :
@1.3mm 20uJ
@3mm 57uJ
@7mm 93uJ
injection canon atténuateur @420pas :
@1.3mm 18uJ
@3mm 48uJ
@7mm 78uJ
sortie canon (sur la cathode Mg) atténuateur @420pas :
@1.3mm 14uJ
@3mm 40uJ
@7mm 63uJ
mercredi 7 mai : remise sous vide du canon (~12h), cathode installée depuis 16h la veille
- mesure/calibration atténuateur pour limiter l'énergie laser à 5-10uJ (pour débuter) |
| Attachment 1: 2025-05-06_11_33_33_li_op_las_02_RAW.png
|
 |
| Attachment 2: 20250505_144041.JPG
|
 |
| Attachment 3: 20250505_144600.JPG
|
 |
| Attachment 4: 20250505_144453.JPG
|
 |
| Attachment 5: cathode_Mg_polie.jpg
|
 |
| Attachment 6: Anicen_miroir_1.jpg
|
 |
|
Draft
|
Fri Jun 13 08:41:04 2025 |
VM,IC | Under Process | Shift summary | Linac Commissionning |
|
| |
08h40 ThomX was started: Modulator, Frig, Laser
08h45 Chillers were started, cycling all magnets
09h56 HV is 'ON'
10h14 There is problem with Wavecatchers (see screenshot). Even dark current is absent
Wave catcher power supply 2 (5V) is dead... changed temporaly with a spare. (solved)
There is problem with the section phase shifter
12h10 All problem fixed, beam in the ring 50 MeV
Going to 40 MeV
13h25 Sect. Att. 4.03 dB, Phase 203 dg., RF Gun phase 166 dg. Charge -85 pC, receipt 20250613_13_25
Going to 43.7 MeV
14h20 Sect. Att. 3.5 dB, Phase 210 dg., Gun phase 162 dg TL/BPM2 X=-1.5 mm, Receipt 20250613_14_19_57
16h00 35 MeV. Sect Att. 4.98 dB, phase 202 dg. Receipt for the linac
16h10 HV on standby Access to the bunker |
| Attachment 1: health_check_Diag_charge_wavecatcher_2025_06_13_10_13.png
|
 |
| Attachment 2: Screenshot_from_2025-06-13_11-11-22.png
|
 |
| Attachment 3: Screenshot_from_2025-06-13_14-31-57.png
|
 |
| Attachment 4: Screenshot_from_2025-06-13_14-31-45.png
|
 |
|
977
|
Tue Dec 10 11:35:16 2024 |
VM,HG,SC | Under Process | Shift summary | LI | TL | LE | Ring | Linac Commissionning | Ring Commissioning |
|
50 and 70 MeV Emittance, and transport | |
Intervention chiller (Maher) : maintenance nécessaire à prévoir (clé outil clignote)
Problème de fermeture casemate : bouton rouge de la grille de sortie enfoncée
11h36 Démarrage faisceau
11h42 HV is 'On'
12h52 RF Gun phase is 154 dg.; Att. sect. is 0.176 dB; Sect. Phase is 244 dg. TL/BPM02 X=-4 mm; Charges 89; 93
Linac steerers: H [1.17 -3.35]; V [-2.26 2.18]
Emittance measurements at 70 MeV
15h10 Set to 50 MeV; Gun Phase is 154 dg., Sect. Att. is 2.62 dB; Receipt from 28/11/2024 17h51
16h10 : loaded good storage for x rays from recepies to check 50 MeV . From this setting lets check back alignment in quads from the quand alignment script.
Before alignment : AL1
Str01-H01 : 2.69
Str01-V01 : -2.14
Str01-H02 : -4.46
Str01-V02 : 2.32
After alignment: AL2
Str01-H01 : 2.89
Str01-V01 : -1.92
Str01-H02 : -4.44
Str01-V02 : 2.33
But : transmission (charge) : drop by 40%
Let's do soléno scan to check transmission : Quand alignment not very good for charge transmission, see attched plots.
Let's check alignment on the section for the 2 alignments. We change the section phase by 50° and see displacement (Yag and BPM). For this, Quads should be off.
Alignement : AL2
Phase start : 217
------------- TL -------------------
------ YAG LimaBPM Pixels -----
YAG X : 303.48206851 +/- 2.53475464631
YAG Y : 248.17574592 +/- 3.09361246552
------ YAG Max proj. Pixels -----
YAG X : 311.225 +/- 1.65056808402
YAG Y : 247.15 +/- 2.8332843133
------ BPMs en mm -----
BPM X : -0.280208425 +/- 0.0363865736831
BPM Y : 0.328087125 +/- 0.0522391011486
Phase end : 260
------------- TL -------------------
------ YAG LimaBPM Pixels -----
YAG X : 580.056498553 +/- 3.23802401848
YAG Y : 262.888974065 +/- 4.1652343396
------ YAG Max proj. Pixels -----
YAG X : 580.5 +/- 4.28368999812
YAG Y : 257.5 +/- 3.69459064038
------ BPMs en mm -----
BPM X : 4.87663125 +/- 0.0575652671525
BPM Y : 0.096524675 +/- 0.0720854637695
Alignement : AL1
------------- TL -------------------
------ YAG LimaBPM Pixels -----
YAG X : 262.601980531 +/- 19.0243746195
YAG Y : 332.053127301 +/- 1.57943041905
------ YAG Max proj. Pixels -----
YAG X : 281.125 +/- 2.59987980491
YAG Y : 327.075 +/- 1.9797411447
------ BPMs en mm -----
BPM X : -0.97775805 +/- 0.0424827626514
BPM Y : -1.10375235 +/- 0.0278375257903
Phase end : 260
------------- TL -------------------
------ YAG LimaBPM Pixels -----
YAG X : 488.638304627 +/- 2.94860256378
YAG Y : 369.841993906 +/- 2.4681240712
------ YAG Max proj. Pixels -----
YAG X : 492.675 +/- 2.89298721048
YAG Y : 371.25 +/- 3.34477204006
------ BPMs en mm -----
BPM X : 3.5390905 +/- 0.0500967083465
BPM Y : -1.860907325 +/- 0.0472255884105
some tries to enter the ring, by using same recipe than last friday. But someting changed, not possible to get back to the same storage. May be beam quality has changed from last run.
--> We need to find a set of observables to be checked to get back to the same beam quality for injection !
18h30 : Tchuss
|
| Attachment 1: Q_vs_SolenoScan_at_16-52-02_Q1_Off.png
|
 |
| Attachment 2: Q_vs_SolenoScan_at_16-39-39_recette_good_xrays.png
|
 |
|
Draft
|
Thu Mar 13 08:29:34 2025 |
VM, VC, RC, IC | Under Process | Shift summary | Ring Commissioning |
|
| |
08h27 Start ThomX: Modulator, Laser, Frig
08h34 Chillers were started, cycling al magnets
12H ready to start beam ( 13H30)
alignement laser done (alignement to do)
13h20 HV is 'ON'
13h31 RF Gun phase is 95 dg. the laser iris is 1.3 mm, the laser att. 340, RF Gun charge is -120 pC (the laser spot position was Hor. 4.282 mm, Vert. 3.327 mm ), screenshots of Li/SST1
13h35 laser spot alighment started at RF gun phase of 145 dg.
13h36 New position of the laser spot is: Hor. 4.282 mm, Vert. 3.327 mm
13h44 the modulator was put into standby mode, access to the bunker
14h13 HV is 'ON'
Two plots beam on LI STT 0.1
new receipe all 2025 03 13 14 46 52
Charge 120pC
RF power 150KV
17h12 RF gun phase 92 dg., Sect. phase 211 dg. I TL DP =159.3 A, TL/BPM X=4 mm, RF cav. 150 kV, phase -15 dg. Sum of TBTSum =1.8e11, Charges: -142 pC,-140 pC, -152 pC, I3 25000 pA
17h31 Adjusting ring lattice to rise X rays. I3 max was 45000 pA
18h29 Stop thomX
|
| Attachment 1: 2025-03-13_13_29_10_li_dg_sst_01-ccd_01_RAW.png
|
 |
| Attachment 2: 2025-03-13_13_27_49_li_dg_sst_01-ccd_01_RAW.png
|
 |
| Attachment 3: Screenshot_from_2025-03-13_18-06-54.png
|
 |
| Attachment 4: Screenshot_from_2025-03-13_18-06-43.png
|
 |
| Attachment 5: Screenshot_from_2025-03-13_18-06-32.png
|
 |
| Attachment 6: Screenshot_from_2025-03-13_18-06-19.png
|
 |
| Attachment 7: Screenshot_from_2025-03-13_18-06-05.png
|
 |
| Attachment 8: Screenshot_from_2025-03-13_17-52-35.png
|
 |
| Attachment 9: Screenshot_from_2025-03-13_17-49-56.png
|
 |
| Attachment 10: Screenshot_from_2025-03-13_17-49-22.png
|
 |
| Attachment 11: Screenshot_from_2025-03-13_17-49-09.png
|
 |
| Attachment 12: Screenshot_from_2025-03-13_17-48-41.png
|
 |
|
1028
|
Wed Mar 5 08:53:34 2025 |
VM, VC, RC, DN | Under Process | Shift summary | Ring Commissioning |
|
| |
08h53 Start ThomX
11h10 The oscilloscope installed in the bunker
11h11 HV is 'On'
11h45 The beam is in the ring
12h10 The modulator set to the Standby mode. Access to the bunker
12h24 HV is 'On'
12h30 RF Gun Phase is 15 dg., Sect. phase is 204 dg., Att. is 2.503 dB, TL/BPM2 X= 4 mm, Charges: -108 pC, -108 pC, -120 pC
12h35 Feedback on linac injection was started
13h00 Measurement of the stability of the temporal position of electron and photon bunches at the IP. RF Cav. at 200 kV, Phase 35 dg.
13h07 The linac was adjusted: RF Gun phase 10 dg., Sect phase 199 dg. Charges: -100 pC,-99 pC, -110 pC, Inj. qual. 0.965, Storage qual. 0.802
14h26 The linac was adjusted: RF Gun phase 11 dg., Sect phase 203 dg. Charges: -99 pC,-99 pC, -109 pC, Inj. qual. 0.984, Storage qual. 0.747, X ray flux I3=25000 pA
Phase between electron beam and FP photon have been done (attachements will come later) (Electron beam is a pickup (150ps fall time) at the IP and Photon beam is a photo diode (300ps rise time) at the FP cavity output).
time jitter is measured as the time difference between the two ulses at a fixed treshhold of 10mV)
measurements show a 33ps FWHM jitter (15ps) as long as the FPC is locked on the 500MHz . the jitter mainly come from FPC (see post FPC : https://elog.lal.in2p3.fr/FPC/THOMX+commissioning/416)
15h35 The linac was adjusted: RF Gun phase 19 dg., Sect phase 212 dg. Charges: -105 pC,-104 pC, -115 pC, Inj. qual. 0.988, Storage qual. 0.786,
17h45 Stop ThomX
|
| Attachment 1: JItter_laserFP-Ebeamring-4.png
|
 |
| Attachment 2: JItter_laserFP-Ebeamring.png
|
 |
| Attachment 3: 2025-03-05_15_11_40_li_dg_sst_01-ccd_01_RAW.png
|
 |
| Attachment 4: 2025-03-05_14_17_36_tl_dg_sst_03-ccd_01_RAW.png
|
 |
| Attachment 5: 2025-03-05_14_14_49_tl_dg_sst_01-ccd_01_RAW.png
|
 |
| Attachment 6: 2025-03-05_14_14_19_tl_dg_sst_01-ccd_01_RAW.png
|
 |
| Attachment 7: 2025-03-05_14_13_20_tl_dg_sst_02-ccd_01_RAW.png
|
 |
| Attachment 8: 2025-03-05_14_13_01_tl_dg_sst_02-ccd_01_RAW.png
|
 |
| Attachment 9: 2025-03-05_11_31_26_tl_dg_sst_02-ccd_01_RAW.png
|
 |
| Attachment 10: 2025-03-05_11_18_31_li_dg_sst_01-ccd_01_RAW.png
|
 |
| Attachment 11: Screenshot_from_2025-03-05_16-56-31.png
|
 |
| Attachment 12: Screenshot_from_2025-03-05_16-55-08.png
|
 |
| Attachment 13: Screenshot_from_2025-03-05_16-52-56.png
|
 |
| Attachment 14: Screenshot_from_2025-03-05_16-52-45.png
|
 |
| Attachment 15: Screenshot_from_2025-03-05_16-52-33.png
|
 |
| Attachment 16: Screenshot_from_2025-03-05_16-52-19.png
|
 |
|
Draft
|
Wed Jan 14 08:38:33 2026 |
VM, RC, MJ, IC | Under Process | Shift summary | LI | TL | LE | Ring |
|
Test Soleno=245, optic issue de la simu Julien Matching | |
08h36 Warm-up ThomX: Modulator, Laser, Fridge
8h41 Chillers were started, cycling all magnets.
09h40 HV is ON
** 10h38 recipe_recipe_LI_TL_RI_all_Sol245_20260113_17_50_09.txt loaded, RCDS on injection11h23
RF 100 kV, Phase -4 dg. Manual 1179. RF gun phase 168 dg., Sect Att. 2.53 dg., Phase 214 dg., Charges (BPMs): -185, -177, -182, -181 pC, Linac steerers H [0.75 -2.95], V [-2.64 3.14] ,
MRSV FWHM about 50, sigma down to 22 pix
Acquisition d'un SPECTRE "on-axis a l'oeil" (Hm3_Vm10p2) - "Nominal ring QUADs"
** 11h36 Set charge to 100 pC, Laser Att. 329, RF gun phase ==> 171 dg.
- Acquisition d'un SPECTRE "on-axis a l'oeil" (Hm3_Vm10p2) - "Nominal ring QUADs"
- Scan vertical FPC (~11h50)
- Mesure Taille source fente 1 (images wiite beam + image fente source)
** 12h21 recipe_recipe_LI_TL_RI_all_20260109_14_44_42.txt loaded, then receipts for the linac and the transfer line recipe_recipe_TL_all_20260114_12_20_00.txt, recipe_recipe_LI_TL_straight_all_20260114_12_19_54.txt
RCDS on injection. Sometimes MRSV FWHM ==>40 and less.
- 13h51 : Acquisition d'un SPECTRE "on-axis a l'oeil" (Hm3_Vm10p2) - "NOT nominal ring QUADs"
- 14h : Scan FPC
** 14h55 : Discussion Marie/Iryna/Viktor ==> Retour a la recette "nominal ring QUADs" (recipe_recipe_LI_TL_RI_all_Sol245_20260113_17_50_09.txt)
PUIS, a 15h10 : recipe_recipe_LI_TL_RI_all_20260114_12_31_30.txt reloaded .... Pourquoi ? je ne sais pas ... Je ne l'ai su qu'a 16h30, donc :
- Tous les spectres_vs_position_CdTe mesures ensuite (necessaires pour retrouver la divergence e-) sont acquis en fait avec "NOT nominal ring QUADs" au lieu de de la recette SOL_245 isuue de la simu Julien (recipe_recipe_LI_TL_RI_all_Sol245_20260113_17_50_09.txt)
- Mesure Taille source fente 1 (15h14-15h18)
** 17h30 : recherche de la cause "spectres dromadaires"
- Visualisation de tout le tube ==> rien dans le trajet du faisceau
- Spectre en desynchro toute fentes ouvertes : meme effet dromadaire
- Mouvements HORIZONTAUX de la cavite FP et/ou Phase : Variations claires de la forme du dromadaire (spectres pris pour pos Horiz FPC -1.8, -1.3 -2.3 mm) ==> Effet dromadaire sans doute lie au faisceau d'e- qui est courbe entre les 2 dipoles (==> 2 interactions ?) . Effet a quantifier/simuler, puis, si ca se confirme, il faudra trouver une solution pour que l'IP soit absolument sur la tangeante de la courbure des e-
18h05 Stop ThomX
|
|
1058
|
Thu Apr 17 08:16:04 2025 |
VM, RC, DN, ND | Under Process | Shift summary | Ring Commissioning |
|
| |
08h15 Start Thomx: modulator, frig, laser
08h21 Chillers started, all magnets cycling
Filesystem very slow
Allarm vacuum valve are in alarm
RAC.17-RDP.01 still faulty
09h38 HV is 'ON'
10:15 Calc DS for attenuators was crashed. It restarted at 0dB attenuation...
12:43 SR on target with Iris closed
Alignemnt...
17:30 Measurement of the bunch length in the ring ~140ps |
| Attachment 1: health_check_Vide_Jauge_2025_04_17_09_25.png
|
 |
| Attachment 2: health_check_RF_Redpitaya_2025_04_17_09_27.png
|
 |
| Attachment 3: bpm_1_vs_kicker_second.png
|
 |
| Attachment 4: viewer_2025_04_17_12_44_06.png
|
 |
| Attachment 5: 20250417_175615.jpg
|
 |
|
Draft
|
Tue Jan 20 08:35:56 2026 |
VM, ND, VC | Under Process | Shift summary | |
|
| |
08h35 Warm-up ThomX: Modulator, Laser, Fridge
08h41 Chillers were started, cycling all magnets.
09h40 HV is ON
10h12 The receipt loaded: recipe_recipe_LI_TL_RI_all_20260116_14_22_26.txt. Beam is in the ring W/O RF
RF gun phase 40 dg., Sect. Att. 2.556 dB, Sect. phase 207 dg., Linac steerers: H [0.58 -2.83], V [-2.48 2.94], charges (BPMs): -125, -119, -121, -122, -119 PC, the laser att. 359
10h38 RF 100 kV, phase -4 dg., manual phase shifter was adjusted.
10h54 RI_C1 Quads were stoped to chec dispersion at injection
13h00 Triggers stoped, after that was fixed the laser phase jumped to 202 dg. sect. phase 206 dg.
15h39 Mod. standby
17h20 HV is on
18h01 Stop ThomX |