  Notes concernant la preparation du Commissionning, Page 1 of 3  Not logged in ThomX    logo
ID Date Author Status Type Category Importantdown Subject Icon Text Attachments
  14   Wed Mar 3 10:49:14 2021 HaygUnder ProcessInfoproblemes WC tests TANGO 
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.03_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.01_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch3_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch4_chargeMean


 

Dans les variables MeanStd :


Charge 1 :

er_ca_rac.05-elr.01-wac.01_Ch0_chargeMean 


Charge
  
  15   Wed Mar 3 11:30:46 2021 HaygUnder ProcessInfoproblemes RE: WC tests TANGO  




 Screenshot_from_2021-03-03_11-29-57.png 
  28   Fri Sep 23 09:44:14 2022 IC, VK, AM, VC, NDUnder ProcessInfodocs Beam requirements for the ring The following parameters are required for
ring operations:

- At least 50pC on TL/DG/ICT.01
  
  31   Tue Sep 27 17:45:54 2022 NDUnder ProcessInfodocs RE: Beam requirements for the ring An IHM to check some of these parameters
has been created (git/panneaux/StatusInfoIHM_ring_vars.py)
and added to Plateforme_IHM...
  
  1   Tue Nov 19 11:16:39 2019 Entered by Hayg Guler from 134.158.195.145 on Tue Nov 19 11:16:25 2019Under ProcessShift summaryPrise de donnees   Salle de controle :


installer Xlib pour tout
le monde
mettre les environnements
  
  2   Tue Jul 7 14:25:15 2020 Entered by bruni from 134.158.195.142 on Tue Jul 7 14:24:55 2020Under ProcessShift summaryPrise de donnees test régulation températures canon/section Ouverture des chillers et du frigo sur
place.

Ouverture de l'IHM plateforme
 screenshotIHM_RF.png 
  Draft   Wed Jul 8 14:33:04 2020 Entered by bruni from 134.158.195.142 on Wed Jul 8 14:32:48 2020Under ProcessShift summaryPrise de donnees test moteur solénoide en charge Prise de mesure relative entre les deux
bobines : 18.7cm avec les alimentations éteintes
mais du refroidissement.
  
  4   Thu Jul 16 09:50:37 2020 Entered by Sophie Chance from 134.158.195.143 on Thu Jul 16 09:50:21 2020Under ProcessInfoetc demarrage à blanc debut du démarrage à blanc
9h45. Démarrage prévu par étape.
  
  Draft   Tue Dec 1 14:35:01 2020 Entered by Hayg Guler from 134.158.195.145 on Tue Dec 1 14:34:08 2020      Laser :

Camera : mettre le temps d'exposition
à 0.2 secondes
  
  6   Thu Dec 3 10:58:11 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 10:57:47 2020FixedInfodocs demarrage a blanc 3 dec 2020 Bilan démarrage à blanc 3
dec 2020 : (H Monard, S Cavalier)

but : verification etat IHM pour
  
  7   Thu Dec 3 13:45:13 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:44:55 2020FixedInfodocs signal photodiode laser    photodiode-laser2.png 
  8   Thu Dec 3 13:50:27 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:50:13 2020FixedInfoPrise de donnees signal photodiode 03-12-20    plot.pdf 
  9   Thu Dec 3 15:17:04 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:16:48 2020FixedInfoPrise de donnees   Signaux RF - REdPitaya 03-12-20

Photodiode laser - RP.04 A

QS RP.04 B
  
  10   Thu Dec 3 15:26:22 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:26:07 2020FixedInfoPrise de donnees   signaux photodiode PrC Qs test avec generateur
impulsion ! 2 V , 3 µs (bleu ciel) 
et signal avec rampe, 1V (moire), photodiode
 photodiode-Prc_Qs.pdf 
  11   Wed Dec 9 14:26:35 2020 Entered by Hugues Monard from 134.158.195.145 on Wed Dec 9 14:26:20 2020FixedInfoetc re-organisation PC-client en SdC suite à la discussion de lundi 7
/12/20, les PC clients en SdC ont été
déplacés et re-organisé
  
  12   Wed Dec 9 14:33:08 2020 HaygUnder ProcessInfoetc RE:  Pour info :


client 1 ne fonctionne
pas encore. Il n'a pas été
  
  13   Thu Dec 10 14:43:07 2020 Entered by Nicolas Delerue from 193.55.29.171 on Thu Dec 10 14:42:53 2020Not FixedProblemproblemes Clients 1, 4 et 5 non fonctionnels En complément du message de Hayg,
client 4 et 5 ne fonctionnent pas non plus
(en plus de client 1).
  
  16   Thu Mar 4 16:36:12 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:35:53 2021Under ProcessShift summaryPrise de donnees Tests IHM RF  De nouveaux tests ont été
fait sur l'IHM RF amélioré
(M. Omeich, H. Guler, S. Chance, JN. Cayla)
 IHM_RF.png 
  17   Thu Mar 4 16:46:04 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:45:48 2021Under ProcessShift summaryPrise de donnees   Test du repitaya 1 voie 1 (Pi section)
et 2 (Pr section)

 
 RDP.01_voie1.pngRDP.01_voie2.png 
  18   Thu Mar 4 16:56:19 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:56:07 2021Under ProcessShift summaryPrise de donnees redpitaya 2 Tests du redpitaya 2 voie 1 (Boucle section)
voie 2 est libre
 RDP.02_voie1.png 