HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of installation, including shipping and de-installation of test setups., Page 2 of 3  Not logged in ELOG logo
    Reply   Pressure On mirror Chambers, posted by Manar Amer at ThomX igloo about vacuum 19102021_vacuum_pressure_on_mirrorsChambers_15h30.jpg
At 15h30 in the afternoon, the pressure on the mirror chambers is:


on the left                
   :  2.0*10^-9 mbar
on the right (sortie X)  :  1.4*10^-8 mbar


    Reply   Pressure On mirror Chambers, posted by Manar Amer at ThomX igloo about vacuum 20102021_vacuum_pressure_on_mirrorsChambers_10h10.jpg
At 10h in the morning, the pressure on the mirror chambers is:


on the left                
   :  1.9*10^-9 mbar
on the right (sortie X)  :  1.0*10^-8 mbar


    Reply   Pressure On mirror Chambers, posted by Manar Amer at ThomX igloo about vacuum 21102021_vacuum_pressure_on_mirrorsChambers_9h30.jpg
At 9h30 in the morning, the pressure on the mirror chambers is:


on the left                
   :  1.6*10^-9 mbar
on the right (sortie X)  :  6.5*10^-9 mbar


Entry   Power supplies switched off, posted by Ronic Chiche at ThomX igloo about cabling 
This afternoon, an electrical operation will be done in ThomX, impacting possibly the casemate power supplies.

Then we shut down all the equipment.
Entry   Operations before moving the optical table, posted by Ronic Chiche at Optical room about mechanics | vacuum | utilities 
Operations before moving the optical table from the optical room to the Igloo.

— the cavity has been filled with clean nitrogen to reach ambient pressure.
— the two valves have been closed using 5 bar air pressure to properly clamp them.
Entry   Opening of the FP cavity valves, posted by Ronic Chiche at ThomX igloo about vacuum IMG_20211104_112239.jpg
as the vacuum level was good enough, I asked Eric Mistretta to open the 2 valves of the FP cavity.

He said the vacuum group made several tests during the last days, opening and closing these valves!
I asked him to not open and close them as it could release some dust on the mirrors.
    Reply   Opening of the FP cavity valves, posted by Ronic Chiche at ThomX igloo about vacuum 
On Friday the 5th of November, ThomX suffered again from a power breakdown.

all the pumping systems had to be restarted.
this produced a vacuum level increase and the FP-cavity valves shut off for security reasons.
Entry   One Five laser moved , posted by Manar Amer at ThomX igloo about lasers and optics 
The One Five laser and its controller have been moved from PLIC to ThomX Iglo.

In preparation to Install the Amplifier from Alphanov
Entry   New valves cabling, posted by Ronic Chiche at Optical room about mechanics | vacuum 
Today, Manu and Eric changed the cavity valves pressure system to open and close them.

during the lock of the OneFive+Amp or of the Koheras, we saw a very noisy PZT signal at 30Hz with increasing/decreasing amplitude very slowly.
this noisy signal was not seen at the begining of the experiment.
Entry   New valve cabling and 30Hz noise PZT, posted by Loïc Amoudry at Optical room about lasers and optics | vacuum Noise_with_all_flow_off.pngNoise_with_room_flow_on.pngNoise_30Hz.png
The Pneumatic valves are still coming back to "close" position.
Now the air bottle is always "open" to keep the valves "open".

The 30Hz noise is still here. We tried to cut off all the air flows. It only decreased the noise intensity but didn't change its shape.
Entry   Moving the optical table to the Igloo, posted by Ronic Chiche at ThomX igloo about mechanics 9x
This morning the Bovis company moved the optical table from the optical room to the Igloo without any problem.

The table is now stored inside the Igloo, just after the large entrance doors, on the right side.
It has been covered with plastic blankets.
Entry   Motors Controler and Software, posted by Manar Amer at ThomX igloo about cabling | software ConnectEthernetToDesignatedOutlet_marked.jpgMototControlerws.jpgPositionOnMoniter.jpeg

When connecting the Ethernet cable from the hub to the computer, it must be connected to the correct one (shown in green
arrow in photo), it is not the usual internet 
the Motor controllers are under the Cavity table.
The last image
shows the positions of each mirror (To be checked if they are actual readings)


 
Entry   Iris Mounts on Cavity Windows, posted by Manar Amer at ThomX igloo about utilities Iris_Mounts_On_Windows.jpgP1_Injection_Mirror_Window_Iris_Mount.jpgInkedS3_Mirror_Window_Outside_LI.jpg
In order to find the Alignment of the ThomX cavity, Yann built mounts that could be placed directly on the windows outside the cavity, where we can place
an iris at the center.

The center of the iris on the mount corresponds to the center of the mirror.
    Reply   Iris Mounts on Cavity Windows, posted by Manar Amer at ThomX igloo about utilities Iris_Mounts_On_small_Windows.pngIris_Mounts_Fixed_On_small_Windows.png
The new iris mounts fixed on the small cavity windows.

Need additional 2 irises.




Manar
Entry   Installation update, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | vacuum | detectors and electronics | cabling | software 
This afternoon with Manar, we finished connecting FP-cavity mirrors motors and alignment mirrors motors to their 3 ISP controllers.
We also added an Ethernet hub on top of these controllers to merge the controller's connections to the computer.
We added some cable extensions to the alignment mirrors motors.
    Reply   Installation update, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | vacuum | detectors and electronics | cabling | software 
after the WE, the right vessel vacuum level is 1.7e-7 mbar (primary + turbo pumps)

and the left vessel vacuum level is 1.8e-9 mbar (primary + turbo + ionic pumps)

I will ask Frederic to start the right vessel ionic pump.
    Reply   Installation update, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | vacuum | detectors and electronics | cabling | software 
Now, both vessels are pumped by an ionic pump (both Turbo pumping entrances have been closed).
the primary pump has been removed from the left vessel.
we kept the primary pumping on the right part "in case of".
Entry   Edge installation, posted by Ronic Chiche at Optical room about mechanics | vacuum 
19/06/2020

The first part of the edge installation was on done by Yann and Ronic
- close the 2 valves of the cavity
Entry   Connecting the optical table to the ThomX ring, posted by Ronic Chiche at ThomX igloo about mechanics Image1.jpgImage2.jpgImage3.png
On the 19th of May, the optical table has been moved inside the ThomX concrete housing and connected to the Symetrie hexapod and to the electron ring.

Symetrie guys started to test the hexapod and they put some software limits around the predefined zero position.
Entry   Cleaning, Motors Controllers mini-rack, hexapod controller, chiller and vacuum, posted by Ronic Chiche at ThomX igloo about detectors and electronics | utilities 
This morning with Manar, we started to clean the floor around the cavity, the outside part of the panels of the housing, and the optical table.
we will continue this afternoon and, in the end, we will make some dust measurements.
do we know who in ThomX is in charge of the cleanness of the casemate (bringing overshoes, sticky floor, cleaning company for the floor,...)?
ELOG V3.1.4-395e101