  465   Wed Apr 22 09:52:40 2026 Ronic ChicheUnder Processreportlasers and opticsThomX iglooIncreasing the FP-cavity power Last Friday, we tried to increase the FP-cavity
power by just increasing the amplifier ratio
from 35% to 70%.
 8x 
  466   Mon Apr 27 16:55:15 2026 Ronic ChicheUnder Processreportlasers and opticsThomX iglooIncreasing the FP-cavity power today with Alice and Daniele,

we checked the distance of the
optical setup :
  
  467   Wed Apr 29 09:38:20 2026 Ronic ChicheUnder Processreportlasers and opticsThomX iglooIncreasing the FP-cavity power new power increase after alignment of the
waveplates and iris.

amplifier ratio (%) => FPC cavity
 Measured_data_v2.png 
  468   Wed Apr 29 15:31:06 2026 Ronic ChicheUnder Processreportlasers and opticsThomX iglooIncreasing the FP-cavity power I installed a stronger optical filter on
the reflection photodiode and loaded it on
1kOhms.
 Sans_titre.png 
  469   Mon May 18 11:33:46 2026 Ronic ChicheUnder Processreportlasers and opticsThomX iglooIncreasing the FP-cavity power this morning with Daniele, we set the amplifier
ratio to 33% => 97kW

then, we set the amplifier ratio
  
  470   Thu May 28 10:31:23 2026 Ronic ChicheUnder Processreportlasers and opticsThomX iglooIncreasing the FP-cavity power Last friday, with Daniele, we did some
realignement on the 2nd CVBG of the compressor
: the beam shape seems better, now.
  
  471   Wed Jun 10 16:16:33 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | vacuumThomX iglooremoving of the M1 mirrorafter trying to increase the power and
after moving S3 to try to change the size
of the beam on the mirrors, the FPC power
  
  472   Thu Jun 11 11:16:55 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | vacuumThomX iglooremoving of the M1 mirrorthis morning, with Daniele, we took some
images of the M1 mirror HR surface :

1- large image span of the mirror
 6x 
  473   Thu Jun 11 17:11:02 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | vacuumThomX iglooremoving of the M1 mirrorThis afternoon, we installed a new M1 mirror,
the only one for which the box was not already
opened.
  
  98   Fri Feb 28 09:20:37 2020 Ronic ChicheNot Fixedissuelasers and opticsOptical roomAmplifier laser diodes issueThis is a long time issue for the ThomX
amplifier : on the 4 pumping diodes available,
the 1st diode has a higher temperature than
 Problem_TEC.PNGparam_diode_1.csvparam_diode_2.csv 
  232   Wed Aug 2 13:07:59 2023 Ronic ChicheNot Fixedissuedetectors and electronicsThomX iglooThomX ring injection kicker noise => USB communication issue with Alphanov amplifierseveral times already, when the electrons
ring injection kicker is running @10Hz, we
observed peaks at the same frequency on reflected
  
  1   Tue Sep 25 19:17:43 2018 Loïc AmoudryFixedinfolasers and opticsOptical roomOnefive Origami 33MHz specsPower during ~20h, power after turn on,
spectrum image and excel datas, polarisation
and pulse length.
 6x 
  2   Thu Sep 27 15:43:48 2018 Ronic ChicheFixedinfolasers and opticsOptical roomOnefive Origami 33MHz specs - Polarisationone rotate a lambda/2 before a PBS and
meausure the refected power:

Pmax=35.6 mW
 polar_onefive_33MHz_polarisation.jpg 
  3   Tue Oct 2 16:23:54 2018 Ronic ChicheFixedissuemechanics | cabling | softwareOptical roomtest des vérins ISP * les vérins de 20mm (axe Z) ont
été testés sur table
grace à une rallonge SUB-C - DB9,
  
  4   Tue Oct 2 18:00:36 2018 Ronic ChicheFixedissuemechanics | cabling | softwareOptical roomtest des vérins ISP  




 CABLAGE_VERINS.pdf 
  5   Wed Oct 3 11:28:46 2018 Ronic ChicheFixedreportmechanics | cablingOptical roomtest des vérins ISP 20mm et 6mmAprès avoir utilisé la chaine
: driver ISP - cable ISP DB9 - Feedthrough
enceinte DB9-DB9 - cable perlé DB9-SUB-C
  
  6   Fri Oct 5 10:17:30 2018 Ronic ChicheFixedreportmechanics | cablingOptical roomtest des vérins ISP 20mm et 6mm 




  
  7   Mon Oct 22 11:03:22 2018 Ronic ChicheFixedinfovacuumOptical roomDétection de fuiteMail de Bruno Mercier du 18/10/2018 :

Un petit CR
de la journée:
  
  8   Mon Oct 22 11:27:35 2018 Ronic ChicheFixedinfomechanicsOptical roomRemontage mécaniqueMail de Yann du 12/10/2018 :

Je vous fais le bilan des actions
effectuées :
  
  9   Mon Oct 22 11:29:41 2018 Ronic ChicheFixedinfomechanicsOptical roomRemontage des vérinsMail de Yann du 8/10/2018 :

Bonjour,
Tous les vérins sont maintenant
  