    Reply   Amplifier mission Bordeaux, posted by Loïc Amoudry at Other about mechanics | lasers and optics Ampli_ThomX.PNGM2_ThomX.png
M² mesuré à 10W.
M²x = 1.17
M²y = 1.14
Entry   Polarization, posted by Loïc Amoudry at Optical room about lasers and optics Polar_horiz_trans_P4.PNGPolar_vert_trans_P4.PNGPolar_vert_input.PNG
Polariztion measured with Input vertically/horizontally polarized (~100% DOLP)

- Transmission (P4) locked on cavity horizontal polarization is ~50% linearly polarized and ~50% unpolarized ?

- Transmission (P4) locked on cavity vertical polarization is ~50% linearly polarized and ~50% unpolarized ?
Entry   Onefive 33MHz unmodelocked, posted by Loïc Amoudry at Optical room about lasers and optics 
Oscillator randomly unmodelocked on 3rd july afternoon (during oscillator power measurement, maybe a reflection from the powermeter power filter
?)

Modelocked this afternoon by putting Onefive motor and phase at reference on the PTC software. 
Entry   2nd stage output power validated , posted by Loïc Amoudry at Optical room about lasers and optics 190704_2ndstage6A_spectrum.PNG
Onefive output power : 28mW
Power before fiber injection : 7.8mW
After EOM and 99% coupling fiber : 1.8mW
Entry   Spin coater air supply removed and front panel changed, posted by Loïc Amoudry at Optical room about mechanics | lasers and optics 1.jpg2.jpg3.jpgfront_panel.png
Spin coater firstly needed vacuum and air supply. The air supply being useless for our experiments, it has been disabled.

The process is the following and is reversible:

1)            Remove the hub from the top of the spin coater, (see picture 1), 4 screws
Entry   Mirrors sent to LMA, posted by Loïc Amoudry at Optical room about lasers and optics 
Mirrors have been sent today to LMA for cleaning and maybe annealing (recuit). 3 ULE of ThomX and the fused silicate for injection (trans @140ppm ).
Entry   Primary vacuum to check dust, posted by Loïc Amoudry at Optical room about mechanics | vacuum Image3.jpgImage6.jpg
The cavity has been cleaned then put under primary vacuum (primary pump without vacuum flow control). Dusts presence was checked at air and no significant
changes have been observed.

1ST image before cleaning
Entry   LMA cleaning technique, posted by Loïc Amoudry at Optical room about lasers and optics 
Christophe MICHEL told us more precise informations about spin coater cleaning.

They always clean with pur water and cotton tipped sticks.
First a spray of water, then they put the wet cotton tipped sitck onto the mirror from the center to the edge ~x3 while continuing to spread
Entry   Cavity dust source check, posted by Loïc Amoudry at Optical room about mechanics | lasers and optics 
Several experiments have been done in order to check the potential source of dust in the ThomX cavity. For each step, we look at a clean surface, put
the cavity under vacuum, go back at ambient pressure and check back the "clean surface".

1st: Primary pump on
    Reply   New Suprasil mirror from LMA, posted by Loïc Amoudry at Optical room about lasers and optics 
19/09/2019 : email from Chrisophe Michel about AR coating of LMA mirrors after reading that Ta2O5 layers can be damaged in vacuum if not protected by
a SiO2 layer :

"oui tous nos coating standards HR se terminent par une couche de protection SiO2 Lambda/2.
Entry   Diffusion ULE spherical mirror (S3) vs Fused Silicate injection planar mirror (P1), posted by Loïc Amoudry at Optical room about lasers and optics diffusion.jpg
Observation made with IR Beam Viewer: 

The observation of P1 and S3 simultaneously while locking shows much higher diffusion on the ULE mirror. The diffusion on the two other ULE mirrors
(S2 and P4) shows similar diffusion as S3.
Entry   Pneumatic valves, posted by Loïc Amoudry at Optical room about mechanics 
Frederic and Manu from vacuum group came this morning to fix again the pneumatic valves which had a leak again.
Entry   Cavity under vacuum , posted by Loïc Amoudry at Optical room about vacuum 
The cavity is right now at 6.5e-8 mbar (turbo pumps on for 1 night and ionic pumps for 3h), primary pumps and turbo pumps are cut, ionic pump are on
and the pressure level is still going down. 
Therefore there aren't any big leak in the cavity and we can expect a final vacuum level close to e-9 mbar.
Entry   Electrical trouble (disjunction), posted by Loïc Amoudry at Optical room about cabling 
The circuit breaker on ThomX cavity drops @1.5-1.8kW when we turn on 1/2nd stage of the amplifier or 3rd stage of the amplifier.
Amplifiers are now connected to K-BOX UPS.

We are buying a clamp ammeter for further investigations.
Entry   ThomX amplifier M2, posted by Loïc Amoudry at Optical room about lasers and optics Fit_matlab_M2.PNG
The ThomX M2 has been measured between 1.5-1.6 for x and y
Entry   Improvement holder amplifier fiber, posted by Loïc Amoudry at Optical room about lasers and optics 1.png2.png
We've added a clamp in the 3rd stage to prevent the pump fiber from moving and tilting (it was tilting to the left).
Entry   Free Spectral Range (FSR), posted by Loïc Amoudry at Optical room about lasers and optics 
FSR is 33.347 MHz @1e-8 mbar

 
Entry   Fiber injection and onefive output power, posted by Loïc Amoudry at Optical room about lasers and optics 
Fiber injection is finished with the new ThomX stretching CVBG in double pass (+50% injection power compared to K-BOX CVBG in simple pass).

- Output Onefive: 27 mW
- After Onefive + lambda/2 + isolator: 25.8 mW
Entry   Onefive spectrum and CVBG spectrum, posted by Loïc Amoudry at Optical room about lasers and optics 191008_spectrumbeforecvbg.PNG191008_spectrumaftercvbg.PNG191008_beamshapeaftercvbgthomx.PNG
The Onefive spectrum has shifted a little bit to lower lambda. It's still enough for the experiment (3mW injection of ampli intead of 1mW needed).
Entry   First mode degeneracy on ThomX, posted by Loïc Amoudry at Optical room about lasers and optics degenere.PNGdegenere2.PNGdegenere3.PNGtek0000.png100kWThomX.png
Yesterday, we've observed the first degeneracy on ThomX cavity at ~115 kW stored. The shape of the stored power on the oscilloscope is really close
to what has been published in the D-shape mirror's paper ("tek0000" transmission in yellow, piezoelectric activator in green, error
signal in blue).