HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of commissioning, report also here plots are reports., Page 24 of 24  Not logged in ELOG logo
Entry   telescope for Koheras, posted by Huan Wang at Optical room about lasers and optics 2019.06.18_telescope_of_Koheras.jpg
telescope of Koheras is removed, information record here:

- distance between collimator edge and -50 lens mount edge is 14.7cm,

- distance between another edge of -50 lens mount and +250 lens mount edge is 14.3cm,
Entry   Characterizing Focus Tunable Lens, posted by Fatematuj Johora at Optical room about lasers and optics Updates_of_Focus_Tunable_lenses.pdf
Yesterday Ronic and I worked on the high laser power measurements with the Vertical set-up of the Focus Tunable Lens. We went upto 38W@4 dpt at the begining
and then also changed the focal power at 38W.

Observation:
Entry   Laser FP operation, posted by Daniele Nutarelli at Optical room about lasers and optics IMG_20230922_105006_resized_20230922_111612040.jpg
This morning FP Laser was operating well locked at 30 KWatts in stable vay.

There are some fluctuations due tu pointing instabilities probably dues to temperature fluctuations in de bunker.

In the attacced picture are reported the lock parameters and signals.
Entry   Tests of pointing stability of the laser CFP, posted by Daniele Nutarelli at ThomX igloo about lasers and optics IMG_20231003_155009_resized_20231009_103610100.jpgIMG_20231003_155458_resized_20231009_103610449.jpg
Last monday with Victor we have cheked the stability of de pointing of the laser FP.

The climatisation was operating since 3 days in satble way. The laser pointing was very stable before to inejct in to the cavity (picture 1)
and also for the reflexion from the cavity (picture 2).
ELOG V3.1.4-395e101