  Status of commissioning, report also here plots are reports., Page 21 of 24  Not logged in ELOG logo
ID Date Author Status Type Category Locationdown Title Text Attachments
  68   Wed Oct 9 10:08:24 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomImprovement holder amplifier fiberWe've added a clamp in the 3rd stage
to prevent the pump fiber from moving and
tilting (it was tilting to the left).
 1.png2.png 
  69   Wed Oct 9 10:10:01 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomFree Spectral Range (FSR)FSR is 33.347 MHz @1e-8 mbar

 
  
  70   Wed Oct 9 10:16:24 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomFiber injection and onefive output powerFiber injection is finished with the new
ThomX stretching CVBG in double pass (+50%
injection power compared to K-BOX CVBG in
  
  71   Wed Oct 9 11:41:11 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomOnefive spectrum and CVBG spectrumThe Onefive spectrum has shifted a little
bit to lower lambda. It's still enough
for the experiment (3mW injection of ampli
 191008_spectrumbeforecvbg.PNG191008_spectrumaftercvbg.PNG191008_beamshapeaftercvbgthomx.PNG 
  72   Thu Oct 10 17:51:26 2019 Ronic ChicheFixedissuelasers and optics | detectors and electronicsOptical roomFirst Lock with 2nd satge of amplifier : Finesse issue ?1st lock today with the second stage of
the amplifier.
~ 300mW of injected power (but which
  
  73   Thu Oct 10 18:03:10 2019 Ronic ChicheFixedissuemechanicsOptical roomFirst Lock with 2nd satge of amplifier : Motor issue ? Global locking almost clean : tranmission
and reflection are quite noiseless except
the peaks at every 500ms.
 Image1.png 
  74   Fri Oct 11 18:42:32 2019 Ronic ChicheFixedissuelasers and optics | detectors and electronicsOptical roomFirst Lock with 2nd satge of amplifier : Finesse issue ?First of all, we used and optical spectrometer
to determine which proportion of pump and
signal is in the injected beam.
  
  75   Fri Oct 11 18:49:00 2019 Ronic ChicheFixedinfodetectors and electronicsOptical roomNew locking schemeBefore, the locking scheme was to produce
an error signal with the PDH box, send its
output to the electronic amplifier box and
  
  76   Tue Oct 22 09:10:45 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomFirst mode degeneracy on ThomXYesterday, we've observed the first
degeneracy on ThomX cavity at ~115 kW stored.
The shape of the stored power on the oscilloscope
 degenere.PNGdegenere2.PNGdegenere3.PNGtek0000.png100kWThomX.png 
  77   Wed Nov 6 16:11:12 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomSpherical mirrors at closest position. FSR, finesse and beam size.The spherical mirrors are at the closest
position to get a FSR ~=33.3435 MHz. Planar
mirrors are at the largest position.
 data_finesse.isffit_finesse_17000.pngbeamsize.PNGfit.PNG 
  78   Wed Nov 13 14:44:56 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomAmplifier output power The ouput power of the ThomX amplifier
has been measured as a function of the 3rd
stage pumps current (0A is 1st and 2nd stage
 dichroic.PNGcourbe.PNGpower.xlsx 
  79   Wed Nov 13 15:05:18 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomAmplifier output power  




 courbedichro.PNG 
  80   Thu Nov 21 11:37:13 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomOnefive Origami 33MHz specsBeam Size Onefive added




 beam_size.xlsxBeam_size_Onefive_33.rar 
  81   Fri Nov 22 17:56:56 2019 Ronic ChicheFixedissuelasers and optics | detectors and electronicsOptical room30Hz noise issuesince some days, we observe the cavity
is difficult to lock and a strange 30Hz noise
has appeared on the PZT signal which normally
  
  82   Tue Nov 26 16:11:52 2019 Ronic ChicheFixedissuemechanicsOptical roomFirst Lock with 2nd satge of amplifier : Motor issue ? The 500 ms noise disapeared. We had to
disable the "power save" mode of
the smaract translation stage. AND turn OFF
  
  83   Tue Nov 26 16:21:27 2019 Loïc AmoudryFixedissuevacuumOptical roomPneumatic valvesThe pneumatic valves are now plugged on
the university air network.
The air valve is fully openned for
  
  84   Tue Nov 26 16:35:39 2019 Ronic ChicheFixedissuelasers and optics | detectors and electronicsOptical room30Hz noise issueThe 30 Hz noise issue has been solved !

It came from translation stage
of P1 and/or P4.
  
  85   Wed Nov 27 13:53:57 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomOnefive output powerThe pump voltage has been increased few
days ago when looking for a modlock of the
laser.
  
  86   Thu Nov 28 10:40:29 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomCVBG reference and Eric Cormier calculationThe Stretcher is the "D 24-02-II",
it must be used in double path before the
amplifier injection.
 compresseurs.jpgEtireur.jpgcalcul_Eric.jpg 
  87   Tue Feb 4 14:39:56 2020 Loïc AmoudryFixedinfolasers and opticsOptical roomOnefive output powerOnefive output power measured today. 3.52
mW with OD1 filter ==> ~35mW.

  