68
Wed Oct 9 10:08:24 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Improvement holder amplifier fiber
We've added a clamp in the 3rd stage
to prevent the pump fiber from moving and
tilting (it was tilting to the left).
69
Wed Oct 9 10:10:01 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Free Spectral Range (FSR)
FSR is 33.347 MHz @1e-8 mbar
70
Wed Oct 9 10:16:24 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Fiber injection and onefive output power
Fiber injection is finished with the new
ThomX stretching CVBG in double pass (+50%
injection power compared to K-BOX CVBG in
71
Wed Oct 9 11:41:11 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Onefive spectrum and CVBG spectrum
The Onefive spectrum has shifted a little
bit to lower lambda. It's still enough
for the experiment (3mW injection of ampli
72
Thu Oct 10 17:51:26 2019
Ronic Chiche
Fixed
issue
lasers and optics | detectors and electronics
Optical room
First Lock with 2nd satge of amplifier : Finesse issue ?
1st lock today with the second stage of
the amplifier.
~ 300mW of injected power (but which
73
Thu Oct 10 18:03:10 2019
Ronic Chiche
Fixed
issue
mechanics
Optical room
First Lock with 2nd satge of amplifier : Motor issue ?
Global locking almost clean : tranmission
and reflection are quite noiseless except
the peaks at every 500ms.
74
Fri Oct 11 18:42:32 2019
Ronic Chiche
Fixed
issue
lasers and optics | detectors and electronics
Optical room
First Lock with 2nd satge of amplifier : Finesse issue ?
First of all, we used and optical spectrometer
to determine which proportion of pump and
signal is in the injected beam.
75
Fri Oct 11 18:49:00 2019
Ronic Chiche
Fixed
info
detectors and electronics
Optical room
New locking scheme
Before, the locking scheme was to produce
an error signal with the PDH box, send its
output to the electronic amplifier box and
76
Tue Oct 22 09:10:45 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
First mode degeneracy on ThomX
Yesterday, we've observed the first
degeneracy on ThomX cavity at ~115 kW stored.
The shape of the stored power on the oscilloscope
77
Wed Nov 6 16:11:12 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Spherical mirrors at closest position. FSR, finesse and beam size.
The spherical mirrors are at the closest
position to get a FSR ~=33.3435 MHz. Planar
mirrors are at the largest position.
78
Wed Nov 13 14:44:56 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Amplifier output power
The ouput power of the ThomX amplifier
has been measured as a function of the 3rd
stage pumps current (0A is 1st and 2nd stage
79
Wed Nov 13 15:05:18 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Amplifier output power
80
Thu Nov 21 11:37:13 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Onefive Origami 33MHz specs
Beam Size Onefive added
81
Fri Nov 22 17:56:56 2019
Ronic Chiche
Fixed
issue
lasers and optics | detectors and electronics
Optical room
30Hz noise issue
since some days, we observe the cavity
is difficult to lock and a strange 30Hz noise
has appeared on the PZT signal which normally
82
Tue Nov 26 16:11:52 2019
Ronic Chiche
Fixed
issue
mechanics
Optical room
First Lock with 2nd satge of amplifier : Motor issue ?
The 500 ms noise disapeared. We had to
disable the "power save" mode of
the smaract translation stage. AND turn OFF
83
Tue Nov 26 16:21:27 2019
Loïc Amoudry
Fixed
issue
vacuum
Optical room
Pneumatic valves
The pneumatic valves are now plugged on
the university air network.
The air valve is fully openned for
84
Tue Nov 26 16:35:39 2019
Ronic Chiche
Fixed
issue
lasers and optics | detectors and electronics
Optical room
30Hz noise issue
The 30 Hz noise issue has been solved !
It came from translation stage
of P1 and/or P4.
85
Wed Nov 27 13:53:57 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Onefive output power
The pump voltage has been increased few
days ago when looking for a modlock of the
laser.
86
Thu Nov 28 10:40:29 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
CVBG reference and Eric Cormier calculation
The Stretcher is the "D 24-02-II",
it must be used in double path before the
amplifier injection.
87
Tue Feb 4 14:39:56 2020
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Onefive output power
Onefive output power measured today. 3.52
mW with OD1 filter ==> ~35mW.