HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of commissioning, report also here plots are reports., Page 21 of 23  Not logged in ELOG logo
ID Date Author Status Type Category Location Title Text Attachments
  54   Tue Sep 3 18:04:03 2019 Ronic ChicheFixedreportlasers and opticsOptical roomFinesse measurement after mirror cleaning using the spin coaterFollowing finesse measurements (start @10700): 
Clean P1 with SC (water) + isoprop
(wipe) finesse @15000
  
  53   Tue Sep 3 17:51:04 2019 Ronic ChicheFixedissuemechanics | lasers and optics | vacuumOptical roomVessel cleanlinesslooking in the vessel of the FP cavity
using a UV lamp shows a lot of dust... more
dust than outside the cavity !!!
 IMG_20190903_161910.jpg 
  52   Fri Aug 30 17:52:41 2019 Ronic ChicheFixedissuemechanics | detectors and electronicsOptical roomMotor issueToday, Axis 9 (Z-axis of P1) has blocked
the software which drives all the motors.
impossible to bypass the problem.
  
  51   Fri Aug 30 17:46:15 2019 Ronic ChicheFixedreportlasers and opticsOptical roomFinesse measurement after mirror cleaning using the spin coatertoday I cleaned S3 with isopropanol and
then with pure water on spin coater.
Finesse is only 10 700.(coupling 50%
  
  50   Fri Aug 30 09:44:56 2019 Ronic ChicheFixedreportlasers and opticsOptical roomFinesse measurement after mirror cleaning using the spin coaterLast Finesse measurement in air : ~ 17
000 the 20th of may (see logbook)

28th and 29th of august, we cleanned,
  
  49   Mon Jul 29 17:15:35 2019 Loïc AmoudryFixedinfomechanics | lasers and opticsOptical roomSpin coater air supply removed and front panel changedSpin coater firstly needed vacuum and air
supply. The air supply being useless for
our experiments, it has been disabled.
 1.jpg2.jpg3.jpgfront_panel.png 
  48   Thu Jul 4 18:30:39 2019 Loïc AmoudryFixedreportlasers and opticsOptical room2nd stage output power validated Onefive output power : 28mW
Power before fiber injection :
7.8mW
 190704_2ndstage6A_spectrum.PNG 
  47   Thu Jul 4 18:28:55 2019 Loïc AmoudryFixedissuelasers and opticsOptical roomOnefive 33MHz unmodelockedOscillator randomly unmodelocked on 3rd
july afternoon (during oscillator power
measurement, maybe a reflection from the
  
  46   Thu Jul 4 10:17:46 2019 Ronic ChicheFixedinfodetectors and electronicsOptical roomNew design for PDH boxesA new design has been studied for the 5
PDH boxes to better match the low (33MHz)
repetition rate of the ThomX laser.
 2019-06-14_-_PDH_Maurice_modifié.pdf 
  43   Tue Jun 18 20:44:34 2019 Huan WangFixedinfolasers and opticsOptical roomtelescope for Koherastelescope of Koheras is removed, information
record here:

- distance between collimator edge
 2019.06.18_telescope_of_Koheras.jpg 
  42   Wed Jun 12 17:49:20 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomPolarizationPolariztion measured with Input vertically/horizontally polarized
(~100% DOLP)

- Transmission (P4) locked on cavity
 Polar_horiz_trans_P4.PNGPolar_vert_trans_P4.PNGPolar_vert_input.PNG 
  41   Wed Jun 12 12:07:11 2019 Loïc AmoudryFixedreportmechanics | lasers and opticsOtherAmplifier mission BordeauxM² mesuré à 10W.
M²x = 1.17
M²y = 1.14
 Ampli_ThomX.PNGM2_ThomX.png 
  40   Tue Jun 11 18:03:10 2019 Loïc AmoudryFixedreportmechanics | lasers and opticsOtherAmplifier mission BordeauxVoyage Bordeaux au CELIA avec Jérôme
LHERMITE (Loïc et Titoutan)

1er jour (34°) :
 1st_and_2nd_stage.jpg3rd_stage_pumps.jpg3rd_stage_signal.jpg 
  39   Thu May 23 17:30:03 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomTransmission of Sapphire mirrorSee image.  Sapphire_transmission.PNG 
  38   Thu May 23 10:10:56 2019 Ronic ChicheFixedreportlasers and opticsOptical roomFinesse measurement by decay time technique5 Files attached:

- Note on the technique and results
for the present cavity on 2019, May 21th
 2019-05-21_-_Finesse_measurement_by_decay_time_technique.docxtek0005CH1.isftek0006CH1.isfplotdata.mmyerror.m 
  37   Tue May 21 17:49:30 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomFinesse after cleaning (new suprasil mirror)15/05/19-20/05/19:

Cleaning of the mirrors:

Initial finesse 14000 @air
  
  36   Tue May 21 17:44:46 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomNew Suprasil mirror from LMA14/05/19:

New Suprasil mirror received. It
will replace the S-BOX suprasil mirror on
  
  35   Thu Apr 18 16:17:53 2019 Loïc AmoudryFixedissuelasers and opticsOptical room33MHz Onefive power overtime decreasePower of the 33MHz Onfive decreases over
time. Have to pay attention to that.
Note that air dryers have never been
 180410_power_33mhz_1jours.PNG180925_Power.JPG190416_power_ouput_Onefive.PNG 
  34   Thu Apr 18 16:07:23 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomInjection of 33MHz Onefive through fiberOutput power of the Onefive, and power
after injection and different components
have been measured.
 power_ouput_Onefive.PNGpower_after_injection_and_point9dB_blue_fiber.PNGpower_after_halfwaveplate_and_injection_and_point9dB_blue_fiber.PNGpower_after_halfwaveplate_and_injection_and_point9dB_blue_fiber_and_EOM_NIR-MPX-LN-0dot1.PNGpower_after_halfwaveplate_and_injection_and_point9dB_blue_fiber_and_EOM_NIR-MPX-LN-02.PNG 
  33   Wed Apr 10 13:11:46 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomMirror's cleaning and finesseSummary of what have been cleaned
the last week:

P1 with isopropanol, finesse 11000
  
ELOG V3.1.4-395e101