  Status of commissioning, report also here plots are reports., Page 20 of 24  Not logged in ELOG logo
    Reply   Laser and FP cavities frequency adjustment, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics 
This afternoon, I did the 2nd half of the travel: dF @ 33MHz = 0Hz
=> the Smaract motor position is now at +1750µm
=> the FP cavity motor Mot.03 position stayed at -200 000 steps
    Reply   correct parameters for locking the FP-cavity, posted by Ronic Chiche at ThomX igloo about software Correct_lock_parameters.png
this morning, I finished the FP-cavity alignment with the new ring RF frequency.
I get back 50kW @ 33% amplifier ratio.

I'm also able to lock very smoothly on the 500MHz ring RF frequency.
Entry   FP-cavity lock survey during the Linac section changing operation, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
This morning with Daniele, we operated the FP-cavity to be sure there is no issue due to the Linac section changing operation :
- opening/closing the valves due to air pressure break down
- opening/closing the bunker roof
    Reply   FP-cavity lock survey during the Linac section changing operation, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
This morning, I locked again the FP-cavity at more than 50kW with 33% of laser amplifier ratio.

the temperature is measured today at 20.5°C despite the fact the air conditionning is still OFF.
the temperature, rising from 18°C, started monday at 11AM roughly.
Entry   New multiplication factor for the Fabry-Perot intra-cavity power, posted by Ronic Chiche at ThomX igloo about lasers and optics 
last week, we measured the transmission of a plan mirror from the same batch than the ThomX mirrors and we got ~ 1.75ppm instead of 3ppm which was the
calculated value by the LMA.

previously, we put 1/3ppm = 333 333 as multiplication factor.
    Reply   FP-cavity lock survey during the Linac section changing operation, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
from now on, the transmission factor for calculating the FP intra cavity power is 1/1.75ppm ~ 570 000 (changed in the Powermeter software)

this morning the temperature of the water cooling circuit is still very high said Sophie, and the laser amplifier temperature "Temp Amp1"
is at 29°C instead of ~23-25°C
    Reply   FP-cavity lock survey during the Linac section changing operation, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
this morning, I had to restart the chiller. Temp Amp 1 is at 27.5°C after having started the amplifier at 33% ratio.

I removed the 100kohms resistor on the Transmission channel, on the scope (now, it is 1Mohms), to get more sensitivity.

the air temperature is around 21°C and is stable during the last days.
    Reply   FP-cavity lock survey during the Linac section changing operation, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics Capture.JPG
this morning, the computer was restarted and I had to launch all the applications.
no problem except the powermeter for which I had to do a power switch OFF and ON remotely.

the chiller was in error and I had to restart it also.
    Reply   FP-cavity lock survey during the Linac section changing operation, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 


this morning, the chiller was in error and I had to restart it.

the air temperature is around 21°C.
    Reply   FP-cavity lock survey during the Linac section changing operation, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
Yesterday, the ThomX water circuit should have been repared,
and yesterday aftenoon, Daniele restarted the chiller and I checked it this morning without any error.
BUT the pump of the ThomX water circuit is again in default...
    Reply   FP-cavity lock survey during the Linac section changing operation, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics Capture.JPG
the air temperature is between 21°C and 22°C.

I tried to lock the cavity but it was very instable with only short time locks.
I had to increase the parameters of the PID:
    Reply   FP-cavity lock survey during the Linac section changing operation, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
today, I tried to restart the amplifier at 0% (without 3rd stage) but it didn't start... still the same error message.

but the PD_IN power and the PD_PULSE frequency seems correct.... I will try to power the amplifier OFF and ON later to see if one can reset this
error.
    Reply   FP-cavity lock survey during the Linac section changing operation, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
today with Daniele, we disconnected the EOM to increase the injected power of the amplifier, we were at 4.8mW but we still have the "bad sequence"
error => email to Guillaume
we tried also several time again, to stop and restart the amplifier, but it didn't help.
    Reply   Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics 
FYI : to access special menus on the Alphanov software,

login : "Administrator"
pwd : no password
Entry   New password for login on the ThomX computer, posted by Ronic Chiche at ThomX igloo about software 
the previous password has expired.

the new access from the computer :
login : .\$jehanno
    Reply   Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics 
the present situation is :

Guillaume asked me to disconnect the "Laser head" cable from the pump diode module, installed on the optical table.
on the pump diode module, the connector has several small pins and 3 larges pins : A1, A2, A3.
    Reply   Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics 
Guillaume and Julien Bour from Alphanov will come on wednesday 24/07 to have a first look and check the amplifier.

to prepare their intervention, I tested this morning the OneFive oscillator : it's still working at 33MHz.
and we have ~5mW in the LAL software without the EOM.
    Reply   Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics connecteur_laser_head_sur_module_pompes_ampli.jpgconnecteur_laser_head_sur_chassis_ampli.jpg
picture of the connectors used to carry signals between the amplifier pump module and the rack under the table.
DB13W3 standard has been used to carry high current on the 3 dedicated pins:

https://en.wikipedia.org/wiki/DB13W3
Entry   restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software Capture.JPGCapture2.JPG
temperature in the casemate ~ 19.5°C stable

this morning, I measured the power directly at the output of the fiber coupler (through the output fiber), after the strecher : ~5mW
then, I connected the EOM used for the PDH technic : ~2.5mW
    Reply   restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software Capture.JPG
I refilled the chiller and the stabilized temperature is @ 25°C

we started the 3rd stage of the Alphanov amplifier at 30% => PD_OUT is fluctuating around 1-1.4W => it's not related to the real output
power !