  205   Fri Apr 7 00:26:11 2023 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooCW FP Cavit lock Yesterday morning we locked the cavity
on a strange mode in the cavity (we call
it mode, but not sure what it is ??)
 20230406_setup.jpg20230406_transmission_S2-P4.jpg20230406_Cavity_Lock.jpg 
  204   Tue Apr 4 13:03:23 2023 Manar AmerFixedreportlasers and optics | vacuum | detectors and electronicsThomX iglooCavity Alighnment Today, we prepared lenses for a telescope
for the CW laser injection into the cavity,
yet to be installed
 20230404_P4_Transmission.jpg20230404_vacuum_level.jpg 
  203   Tue Mar 28 13:56:52 2023 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooCavity Alighnment Last week, with Ronic and Victor we aligned
the cavity using CW laser (Koheras)


we have also installed
 9x 
  202   Mon Mar 20 17:55:25 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementdue to several "case temperature"
issues, I change the "Max case temperature"
in the "general config" of the
  
  201   Mon Mar 20 17:39:28 2023 Ronic ChicheFixedinfoutilitiesThomX iglooPower shut down on Saturday the 18thToday, I restarted all the equipements
:

Chiller                                                
  
  200   Mon Mar 20 17:23:09 2023 Ronic ChicheFixedinfolasers and opticsOptical room33MHz laser SN2439 back to OrsayAs the general local network for the FP-cavity
devices is 192.168.xxx.xxx, I changed the
IP adress of the smaract laser motors (Frep
 MCS_Network_Interface_Configuration_Guide-1.pdf20230320_154643[1].jpg 
  199   Mon Mar 20 09:33:54 2023 Ronic ChicheFixedinfoutilitiesThomX iglooPower shut down on Saturday the 18thAll the equipments have been switched off
on Friday 17th due to a power shut down on
Saturday 18th :
  
  198   Fri Mar 17 18:54:19 2023 Manar AmerFixedreportlasers and opticsOptical roomNew Mirrors from LMA _ ImagesToday we tested a mirror from one patch

image is for the front face of
the mirror
 20230317_Images_of_New_Mirrors-compressed.pptxMirror_Tested.jpgWhatsApp_Image_2023-03-17_at_6.39.44_PM.jpgimage006.jpg 
  197   Wed Mar 15 21:14:51 2023 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooAmplifier Beam Profile over time Information about today's work is added
to logBook !!

  
  196   Wed Mar 15 21:13:07 2023 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooAmplifier Beam Profile over time This morning we took data of the beam profile
at 4 different points to see the evolution
of
 10x 
  195   Tue Mar 14 16:54:48 2023 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooAmplifier Beam Profile over time This morning, with Ronic, we opened the
compressor box to observe if there is any
misalignment of the mounts or the CVBG's
 comparision_Between_Beam_profile_over_time.jpg 
  194   Mon Mar 13 16:10:24 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementWe took reading of the beam profile of
the amplifier without a lens @ 30 cm from
the 2nd wedge for amplification percentages
 Beam_wavefront_30cm_no_Lens.jpg 
  193   Mon Mar 13 14:02:59 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooCW laser installation and cleaningThis morning with Ronic , in preparation
for the mirror installation, we removed additional
mechanics and cables from the table. 
  
  192   Wed Mar 8 15:11:49 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooCW laser installation and cleaningThis morning with Manar, in order to prepare
the installation of the news FP cavity mirrors,

- we installed the Koheras below
 20230308_121713.jpg 
  191   Wed Mar 8 14:49:12 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementthis morning with Manar,
we checked the Alphanov amplifier
issue : "The laser has been stopped
 20230308_124313.jpg 
  190   Mon Feb 27 18:23:13 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementThis morning with Victor we took a reading
of the beam profile using a 400 mm lens
at 70 % and 100 % amplification.
 WhatsApp_Image_2023-02-27_at_6.07.00_PM.jpeg 
  189   Thu Feb 23 10:15:30 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurement
Yesterday,
Guillaume Machinet and Vincent Clet from
Alphanov came to fixe some issues with the
  
  188   Wed Feb 22 16:11:32 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementOn Monday 20th of February, Daniele and
Viktor took some beam profile measurement
data @ 50% of power amplification.
 Analyse_DonnĂ©es_20_fevrier.pptx 
  187   Tue Feb 14 12:53:09 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementThis morning with Daniele, we did a second
measurement of the beam profile using a different
lens of focal 400 mm.
  
  186   Fri Feb 10 09:54:46 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementThis morning,

- with the "Alphanov"
software => Central panel => "system"
  
ELOG V3.1.4-395e101