205
|
Fri Apr 7 00:26:11 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | CW FP Cavit lock | Yesterday morning we locked the cavity
on a strange mode in the cavity (we call
it mode, but not sure what it is ??) |
  |
|
204
|
Tue Apr 4 13:03:23 2023 |
Manar Amer | Fixed | report | lasers and optics | vacuum | detectors and electronics | ThomX igloo | Cavity Alighnment | Today, we prepared lenses for a telescope
for the CW laser injection into the cavity,
yet to be installed |
 |
|
203
|
Tue Mar 28 13:56:52 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | Cavity Alighnment | Last week, with Ronic and Victor we aligned
the cavity using CW laser (Koheras)
we have also installed |
9x |
|
202
|
Mon Mar 20 17:55:25 2023 |
Ronic Chiche | Fixed | report | lasers and optics | software | ThomX igloo | Alphanov amplifier beam profile measurement | due to several "case temperature"
issues, I change the "Max case temperature"
in the "general config" of the |
|
|
201
|
Mon Mar 20 17:39:28 2023 |
Ronic Chiche | Fixed | info | utilities | ThomX igloo | Power shut down on Saturday the 18th | Today, I restarted all the equipements
:
Chiller |
|
|
200
|
Mon Mar 20 17:23:09 2023 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | 33MHz laser SN2439 back to Orsay | As the general local network for the FP-cavity
devices is 192.168.xxx.xxx, I changed the
IP adress of the smaract laser motors (Frep |
 |
|
199
|
Mon Mar 20 09:33:54 2023 |
Ronic Chiche | Fixed | info | utilities | ThomX igloo | Power shut down on Saturday the 18th | All the equipments have been switched off
on Friday 17th due to a power shut down on
Saturday 18th : |
|
|
198
|
Fri Mar 17 18:54:19 2023 |
Manar Amer | Fixed | report | lasers and optics | Optical room | New Mirrors from LMA _ Images | Today we tested a mirror from one patch
image is for the front face of
the mirror |
   |
|
197
|
Wed Mar 15 21:14:51 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | Amplifier Beam Profile over time | Information about today's work is added
to logBook !!
|
|
|
196
|
Wed Mar 15 21:13:07 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | Amplifier Beam Profile over time | This morning we took data of the beam profile
at 4 different points to see the evolution
of |
10x |
|
195
|
Tue Mar 14 16:54:48 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | Amplifier Beam Profile over time | This morning, with Ronic, we opened the
compressor box to observe if there is any
misalignment of the mounts or the CVBG's |
|
|
194
|
Mon Mar 13 16:10:24 2023 |
Ronic Chiche | Fixed | report | lasers and optics | software | ThomX igloo | Alphanov amplifier beam profile measurement | We took reading of the beam profile of
the amplifier without a lens @ 30 cm from
the 2nd wedge for amplification percentages |
|
|
193
|
Mon Mar 13 14:02:59 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | CW laser installation and cleaning | This morning with Ronic , in preparation
for the mirror installation, we removed additional
mechanics and cables from the table. |
|
|
192
|
Wed Mar 8 15:11:49 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | CW laser installation and cleaning | This morning with Manar, in order to prepare
the installation of the news FP cavity mirrors,
- we installed the Koheras below |
|
|
191
|
Wed Mar 8 14:49:12 2023 |
Ronic Chiche | Fixed | report | lasers and optics | software | ThomX igloo | Alphanov amplifier beam profile measurement | this morning with Manar,
we checked the Alphanov amplifier
issue : "The laser has been stopped |
|
|
190
|
Mon Feb 27 18:23:13 2023 |
Ronic Chiche | Fixed | report | lasers and optics | software | ThomX igloo | Alphanov amplifier beam profile measurement | This morning with Victor we took a reading
of the beam profile using a 400 mm lens
at 70 % and 100 % amplification. |
|
|
189
|
Thu Feb 23 10:15:30 2023 |
Ronic Chiche | Fixed | report | lasers and optics | software | ThomX igloo | Alphanov amplifier beam profile measurement |
Yesterday,
Guillaume Machinet and Vincent Clet from
Alphanov came to fixe some issues with the |
|
|
188
|
Wed Feb 22 16:11:32 2023 |
Ronic Chiche | Fixed | report | lasers and optics | software | ThomX igloo | Alphanov amplifier beam profile measurement | On Monday 20th of February, Daniele and
Viktor took some beam profile measurement
data @ 50% of power amplification. |
|
|
187
|
Tue Feb 14 12:53:09 2023 |
Ronic Chiche | Fixed | report | lasers and optics | software | ThomX igloo | Alphanov amplifier beam profile measurement | This morning with Daniele, we did a second
measurement of the beam profile using a different
lens of focal 400 mm. |
|
|
186
|
Fri Feb 10 09:54:46 2023 |
Ronic Chiche | Fixed | report | lasers and optics | software | ThomX igloo | Alphanov amplifier beam profile measurement | This morning,
- with the "Alphanov"
software => Central panel => "system" |
|