  338   Thu Apr 25 09:09:49 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operation

this morning, the chiller was in
error and I had to restart it.
  
  339   Tue May 14 09:20:27 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationYesterday, the ThomX water circuit should
have been repared,
and yesterday aftenoon, Daniele restarted
  
  340   Tue May 14 10:37:41 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationthe air temperature is between 21°C
and 22°C.

I tried to lock the cavity but
 Capture.JPG 
  341   Tue May 28 15:05:46 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationtoday, I tried to restart the amplifier
at 0% (without 3rd stage) but it didn't
start... still the same error message.
  
  342   Fri May 31 18:12:59 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationtoday with Daniele, we disconnected the
EOM to increase the injected power of the
amplifier, we were at 4.8mW but we still
  
  343   Thu Jun 6 09:17:02 2024 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier issueFYI : to access special menus on the Alphanov
software,

login : "Administrator"
  
  344   Wed Jun 19 09:07:56 2024 Ronic ChicheFixedinfosoftwareThomX iglooNew password for login on the ThomX computerthe previous password has expired.

the new access from the computer
:
  
  345   Wed Jun 19 09:14:14 2024 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier issuethe present situation is :

Guillaume asked me to disconnect
the "Laser head" cable from the
  
  346   Mon Jul 22 09:54:24 2024 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier issueGuillaume and Julien Bour from Alphanov
will come on wednesday 24/07 to have a first
look and check the amplifier.
  
  347   Tue Jul 23 09:37:24 2024 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier issuepicture of the connectors used to carry
signals between the amplifier pump module
and the rack under the table.
 connecteur_laser_head_sur_module_pompes_ampli.jpgconnecteur_laser_head_sur_chassis_ampli.jpg 
  348   Tue Aug 27 09:59:18 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issuetemperature in the casemate ~ 19.5°C
stable

this morning, I measured the power
 Capture.JPGCapture2.JPG 
  349   Tue Aug 27 10:19:08 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issueI refilled the chiller and the stabilized
temperature is @ 25°C

we started the 3rd stage of the
 Capture.JPG 
  350   Tue Aug 27 11:33:24 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issuewe had to move the laser cavity motor to
find the resonances and change a lot the
CEP.
 Sans_titre.png 
  351   Tue Aug 27 12:31:19 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issueafter doing some alignment (walking procedure
on the Y axis), and CEP optimization, I got
83kW for 33% on the laser amplifier with
 Capture.JPG 
  352   Fri Aug 30 10:50:45 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issuethis morning with Daniele, we are measuring
the amplifier power just before the FP-cavity.
Casemate temperature @19.5°C
  
  353   Fri Aug 30 12:05:38 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issueAfter the summer power shutdown, I restarted
all the equipements and got quickly ~80kW
for 33% amplifier ratio with CEP optimization
  
  354   Fri Aug 30 17:59:01 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issueamplifier power measurement before the
compressor CVBG.
we used a mirror in between the amplifier
  
  355   Thu Sep 5 09:51:22 2024 Ronic ChicheFixedissuelasers and optics | detectors and electronicsThomX igloofixing CVBG issuethe CVBG of the compressor module seems
to have an issue.

here is the plan of the work :
  
  356   Thu Sep 5 09:53:10 2024 Ronic ChicheFixedissuelasers and optics | detectors and electronicsThomX igloofixing CVBG issue1) this morning, I aligned to CFP to get
back 82kW in the cavity for 33% of amplifier
ratio.
 12x 
  357   Fri Sep 6 11:56:53 2024 Ronic ChicheFixedissuelasers and optics | detectors and electronicsThomX igloofixing CVBG issuethis morning with Daniele, we realigned
the amplifier beam axis on the iris position.
it was pretty fast an easy => we
 20240906_151100.jpg 