  106   Thu Nov 4 13:05:49 2021 Ronic ChicheFixedinfolasers and opticsThomX iglooFP cavity alignmentas the iris used to locate the FP-cavity
axis have been removed before moving the
table inside the Igloo, we have to find again
  
  107   Thu Nov 4 18:57:16 2021 Ronic ChicheFixedinfolasers and opticsThomX iglooFP cavity alignmentThis afternoon, we continued the alignment
of the red laser.
we did it using the 2 final injection
  
  108   Fri Nov 26 20:12:10 2021 Ronic ChicheFixedreportlasers and opticsThomX iglooFP cavity alignmentA continuation of the alignment process
was done, there was change in it due to variation
in temperature, 
  
  109   Thu Dec 2 21:31:21 2021 Manar AmerFixedreportlasers and opticsThomX iglooFP cavity alignment Note the direction of injection is  
  M1 - M2 - M3 - M4

                                                      
 2021_12_02_M2_Transmission.jpg2021_12_02_M3_transmission_90deg.PNG 
  110   Tue Jan 11 10:36:35 2022 Manar AmerFixedreportlasers and opticsThomX iglooFP cavity alignment The alignment is on hold until next week
17th - 18th  Jan

an Alignment attempt will be done
  
  112   Mon Jan 17 10:04:14 2022 Ronic ChicheFixedinfomechanicsThomX iglooDocumentation about mechanics on Atriumhttps://atrium.in2p3.fr/0dded51a-1cb0-43e6-ae0d-626cd5db7078

a lot of schematics regarding the
  
  113   Mon Jan 17 21:22:28 2022 Manar AmerFixedreportlasers and opticsThomX iglooFP cavity alignment ***** Continuation of the alignment ----
FP Cavity Open --- ****

The cavity was put under outer
 Interior_of_cavity_P1_S3_windowOpen.jpgInterior_of_cavity_P1_S3_windowOpen_irrisOnP1.jpgCavityAlignment_cavityOpen_S2_Output.jpgCavityAlignment_cavityOpen_S3_Output.jpeg 
  114   Wed Jan 19 09:36:53 2022 Manar AmerFixedreportlasers and opticsThomX iglooFP cavity alignment Yesterday, we did the alignment again using
Iris and beam profilers to obtain a more
precise result.
  
  115   Tue Feb 1 14:17:02 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooFP cavity alignment Installed and inputs: 


CW laser ; power = 101
mW
PDH ;

at output

Low
 ThomX_FP_setup_01-02-2022.pngtek0002.png 
  116   Tue Feb 1 16:40:06 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooFP cavity alignment This afternoon, I did some alignment of
the injection mirrors with a fast scan on
the LaseLock to get a regular transmission
  
  117   Wed Feb 2 11:22:51 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooFP cavity alignment This morning with Manar, we installed the
AOM+RF amplifier and the associated fast
feedback loop.
  
  118   Wed Feb 2 11:41:01 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooFP cavity alignment Adding Oscilloscope images


delocked + locked intervals
showing the 20% coupling
lock
 tek0003.pngtek0006.pngtek0007.png 
  119   Thu Feb 3 13:56:24 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooFP cavity alignment Ending alignment series !!




  
  120   Thu Feb 3 14:10:08 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooFP cavity alignment As it can be seen on the first plot, even
with a good locking (good reduction of "high"
frequencies noise: we had better locking
  
  121   Thu Feb 3 14:11:50 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooCavity Lock and Finess measurment This morning, me and Ronic managed to obtain
the FSR and image of the finesse which is
to be analyzed.
 6x 
  123   Thu Feb 3 18:40:04 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooFP cavity alignment The fluctuation problem has been solved.
It was simply the new scheme to inject
2 RF frequencies in a single EOM.
  
  125   Thu Feb 3 18:59:10 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooCavity Lock and Finess measurment

to measure the Finesse, instead
of having 2x EOM for the PDH and for the
  
  126   Thu Feb 3 19:01:04 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooCavity Lock and Finess measurment

After changing the way of injecting
modulation for PDH and modulation for FSR
 Finesse_Fit.png 
  127   Fri Feb 4 10:59:56 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooCavity Lock and Finess measurment one thing which could reduce the Finesse
is the L-shape metal piece if it is slightly
inserted in the FP-cavity mode path.
 apercu_03.jpgBras_manipulateur.jpg 
  128   Fri Mar 11 12:46:58 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooFP cavity mode axis change and Finesse measurementthis morning with Manar, we did a cavity
mode axis change.

we checked the cavity mode centroid
  