113
Tue Jul 12 14:41:55 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
FSR change & Finesse Measurements
a Finesse of 30k with the present mirrors
:
T1=120 ppm ;A1=(2.6+1) ppm;
32
Tue Dec 10 09:36:56 2019
Ronic Chiche
Fixed
info
lasers and optics
Optical room
FSR and Finesse measurement
Yesterday the cavity has been aligned and
locked with the CW Koheras laser.
the FSR has been measured by modulation
181
Tue Jan 16 18:42:42 2024
Xinyi Lu
Fixed
info
lasers and optics
Optical room
FSR and Finesse measurement
- Today, Ronic and I measured the finesse
and FSR after optimizing the locking. FSR
was adjusted to 160.27 MHz to match the pulsed
67
Wed Mar 23 18:11:22 2022
Manar Amer
Fixed
report
utilities
Optical room
Dust Cleaning of SBox
An Initial cleaning of the KBoX outside
was done, All the optics and mechanics placed
that were on the table were removed.
68
Wed Mar 23 18:17:45 2022
Manar Amer
Fixed
report
utilities
Optical room
Dust Cleaning of SBox
The cleaning was done twice with half an
hour interval between the two times
reading on the dust meter was taken
71
Wed Mar 30 18:53:01 2022
Manar Amer
Fixed
report
mechanics | lasers and optics | utilities
Optical room
Dust Cleaning of SBox
The inside of the cavity was cleaned today.
It was very dirty and had big dust particles
and fibers inside.
6x
72
Thu Mar 31 13:29:01 2022
Manar Amer
Fixed
report
mechanics | lasers and optics | utilities
Optical room
Dust Cleaning of SBox
After an overnight where the cavity box
was left open, a measurement of the Dust
meter was taken:
103
Wed Jul 6 18:37:02 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Divergence of the CW beam after collimator
Closing the series of the telescope for
the beam @ 133.33 MHz
212
Mon Apr 8 08:34:54 2024
Xinyi Lu
Fixed
info
lasers and optics
Optical room
Different cavity modes & Pulse width
- Last week, we obtained three curves of
the variation of different cavity modes with
power (Fig. 1). By comparing the gain for
213
Tue Apr 9 08:57:22 2024
Xinyi Lu
Fixed
info
lasers and optics
Optical room
Different cavity modes & Pulse width
Additional information:
The pulse duration has been performed
in RF on a UPD-70-IR2-P photodiode from Alphalas
25
Thu Jan 24 17:44:21 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Deposit on S-box mirrors after return from LMA
Cleaning on dirty surface shows something
is deposited on the surface. Cleaning displaces
and removes part of the deposit.
237
Fri Jun 13 20:10:00 2025
Alice Renaux
Fixed
report
lasers and optics
Optical room
Damaged mirrors test
Today with Dorian we tested three mirrors
with which we previously haven't been
able to obtain any resonance or optical beating
160
Mon Sep 12 18:49:42 2022
Manar Amer
Fixed
issue
lasers and optics
Optical room
Damage on mirror surface
Following the storage of ~ 50 kW inside
the cavity and a sudden drop in transmitted
power from the cavity
161
Mon Sep 12 18:50:57 2022
Manar Amer
Fixed
issue
lasers and optics
Optical room
Damage on mirror surface
Tomorrow will try to shift the injection
mirror to avoid hitting the damaged spot.
162
Tue Sep 13 19:26:27 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Damage on mirror surface
After discussing, we have decided against
shifting the mirror to avoid the time lost.
We changed the injection mirror
166
Fri Sep 16 15:56:45 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Damage on mirror surface
a better image of the damaged spot, image
taken with the arrow for the reflective surface
facing the other direction (image shows position)
167
Fri Sep 16 17:47:56 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Damage on mirror surface
ThomX injection mirror has been cleaned
and placed again inside the optical cavity.
This time to avoid the damaged
156
Fri Sep 9 18:35:07 2022
Ronic Chiche
Fixed
info
mechanics | lasers and optics | detectors and electronics
Optical room
D-shape mirrors positionning status
This afternoon we opened the cavity and
put the D-shape mirrors at their correct
place, close to the beam.
157
Fri Sep 9 19:03:58 2022
Ronic Chiche
Fixed
info
mechanics | lasers and optics | detectors and electronics
Optical room
D-shape mirrors positionning status
The cavity box is vacuum pumped at 6*10^-2
mbar.
223
Wed Jun 19 10:38:00 2024
Ronic Chiche
Fixed
info
mechanics | lasers and optics | detectors and electronics
Optical room
D-shape mirrors positionning status
summary:
- the motors used to move the D-shape
are the Newport Picomotors 8303-V