  161   Mon Sep 12 18:50:57 2022 Manar AmerFixedissuelasers and opticsOptical roomDamage on mirror surface Tomorrow will try to shift the injection
mirror to avoid hitting the damaged spot.

 
  
  162   Tue Sep 13 19:26:27 2022 Manar AmerFixedreportlasers and opticsOptical roomDamage on mirror surface After discussing, we have decided against
shifting the mirror to avoid the time lost.

We changed the injection mirror
  
  166   Fri Sep 16 15:56:45 2022 Manar AmerFixedreportlasers and opticsOptical roomDamage on mirror surface a better image of the damaged spot, image
taken with the arrow for the reflective surface
facing the other direction (image shows position)
 M1_mirror_on_Microscope_stand0.jpgM1X_front_min_zoom.jpgM1X_front_max_zoom.jpgM1X_front_damaged_spot_max_zoom.jpg 
  167   Fri Sep 16 17:47:56 2022 Manar AmerFixedreportlasers and opticsOptical roomDamage on mirror surface ThomX injection mirror has been cleaned
and placed again inside the optical cavity.

This time to avoid the damaged
  
  156   Fri Sep 9 18:35:07 2022 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsOptical roomD-shape mirrors positionning statusThis afternoon we opened the cavity and
put the D-shape mirrors at their correct
place, close to the beam.
  
  157   Fri Sep 9 19:03:58 2022 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsOptical roomD-shape mirrors positionning statusThe cavity box is vacuum pumped at 6*10^-2
mbar.

  
  223   Wed Jun 19 10:38:00 2024 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsOptical roomD-shape mirrors positionning statussummary:

- the motors used to move the D-shape
are the Newport Picomotors 8303-V
  
  179   Wed Jan 10 18:35:46 2024 Xinyi LuFixedinfolasers and opticsOptical roomCoupling efficiency improvement- Recently we have focused on improving
the coupling efficiency. Without the telescope,
the original coupling efficiency was less
 Coupling_efficiency_0110.jpgdamaged_spot_on_M1.png 
  180   Mon Jan 15 19:19:00 2024 Xinyi LuFixedinfolasers and opticsOptical roomCoupling efficiency improvement- We got 30% coupling efficiency by installing
a set of telescopes, adjusting the polarization
and optimizing the alignment. The diameter
 coupling_efficiency.jpgcavity_locking.jpg 
  196   Thu Mar 7 18:55:42 2024 Xinyi LuFixedinfolasers and opticsOptical roomCoupling efficiency improvement- These days, Ronic, Fatematuj and I measured
the beam parameters of the output of the
third-stage amplifier.
 beam_after_lens.png 
  197   Fri Mar 8 18:04:43 2024 Xinyi LuFixedinfolasers and opticsOptical roomCoupling efficiency improvementToday, Ronic and I installed the new telescope
and locked the cavity.

- We locked at the amplifier
 Screenshot_2024-03-08_0_172245.png 
  198   Tue Mar 12 22:13:47 2024 Xinyi LuFixedinfolasers and opticsOptical roomCoupling efficiency improvement- Today, Ronic and I locked at the amplifier
current of 2 A and obtained ~60% coupling
after optimizing the CEP (see Figure
 Screenshot_2024-03-12_0_192348.png 
  186   Fri Jan 26 17:33:05 2024 Xinyi LuFixedinfolasers and opticsOptical roomCleaning of MirrorsToday Daniele, Ronic and I cleaned the
mirrors and locked the cavity. However, the
finesse was only 13,000 because of the not
  
  187   Mon Feb 12 17:17:04 2024 Xinyi LuFixedinfolasers and opticsOptical roomCleaning of Mirrors- Today we cleaned the environment and
put the spin coater and microscope inside
the airflow.
 optical_room.jpg 
  188   Tue Feb 13 17:33:28 2024 Xinyi LuFixedinfolasers and opticsOptical roomCleaning of MirrorsToday, Daniele and I cleaned mirrors one
by one using pure water, alcohol, and the
spin coater. Here are the measurements of
 2nd_measurement_F20606.png7th_measurement__F16563_bad_locking.png 
  189   Wed Feb 14 17:20:26 2024 Xinyi LuFixedinfolasers and opticsOptical roomCleaning of Mirrors- Today, Daniele and I cleaned the
cavity inside, recleaned the M2 and
M4 and their mounts, optimized the locking,
 F_25299.png 
  73   Mon Apr 4 13:58:23 2022 Manar AmerFixedissuedetectors and electronics | utilitiesOptical roomClean Airflow Dust measurementsThe dust meter cap was cleaned using Alcohol,
and using the filter white cap the dust count
was (0 Av. 10 min)
  
  74   Fri Apr 8 19:27:12 2022 Manar AmerFixedissuedetectors and electronics | utilitiesOptical roomClean Airflow Dust measurementsDust measurement done today on  top
of the SBox average 10min

 20220408_DustMeasurement.jpg 
  18   Wed Oct 31 13:51:17 2018 Loïc AmoudryFixedinfolasers and opticsOptical roomChange of the 3 ULE mirrors by 3 spare ULE mirrorsFirst finesse measurement 20 266, FSR 133.351
MHz under vacuum
 Miroirs_à_1031_nm-ThomX_-_décembre2017.pdfvacuum.isf 
  1   Wed Sep 26 18:12:44 2018 Loïc AmoudryFixedinfolasers and opticsOptical roomCavity polarization states (Koheras), Finesse of 2 polarization statesMeasurments of Finesse with the 2 polarization
states, let's call them H (higher) and
L (lower): 24500 for the H and 23500 for
 Finesse_higher.isfFinesse_lower.isfThe2polarizations_states_direct_trans.isfThe2polarizations_states_direct_trans.png 