  85   Mon May 9 19:27:35 2022 Manar AmerFixedreportlasers and optics | utilitiesOptical roomSpincoater - Mirrror cleaning PowerPoint shows the detailed images of
all the mirrors before and after cleaning.

Images of SBox mirrors and M1 from
 20220509_Images_SBox_Mirrors.pptxM1GFA.jpgM2FA.jpgM3FA.jpgM4FA.jpg 
  84   Mon May 9 19:05:35 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment Today; replaced the M1 SBox mirror with
M1 from gamma factory , following the previous
alignment.
 M2_alignment_M3_pinhole.jpgM3_alignment_M4_pinhole.jpgM4_alignment_M1_pinhole.jpgBeating_TM00_CW_piezo_drive.jpg 
  83   Mon May 9 18:36:48 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment Last week In FP cavity we had all SBox
mirrors including the damaged M1 mirror.

The beating was observed with just
 Beating_TM00_SBox_damaged_M1.jpgBeating_HigherOrder_SBox_damaged_M1.jpg 
  82   Wed Apr 27 22:30:14 2022 Manar AmerFixedreportlasers and optics | utilitiesOptical roomSpincoater - Mirrror cleaning Images of the SBox mirrors cleaned at the
same time when the cavity was aligned.

Directly from the spincoater to
 Images_SBox_Mirrors.pptx 
  81   Wed Apr 27 22:13:37 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment Finished the alignment of the SBox with
M1 of SBox placed, to be changed to gamma
factory mirror later
 all_mirrorsplaced_after_m2_window.jpg20222704_SBox_alignment.pptx 
  80   Tue Apr 26 20:08:10 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment
Adjust the placement of
the Irises  (done at the start of the
 9x 
  79   Mon Apr 25 18:02:09 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment Remember to update the position of the
reference Irises tomorrow !!!!

  
  78   Mon Apr 25 17:58:01 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment After pointers and Advice from Aurélien,

improvement of the beam alignment
through M1 and M2 irises was done.
 Ma1_Ma2_Horizontal_Position_Optimized.pngMa1_Ma2_Vertical_Position_Optimized.pngAfter_M1_diaphram_1m_Saturated_Beam_Optimized.jpgAfter_M2_M1_diaphram_Saturated_Beam_Optimized.jpgAfter_M2_M1_diaphram_Beam_Optimized.jpg 
  77   Mon Apr 25 17:28:29 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment SBox alignment, using CW laser Koheras
power 1 mW


 6x 
  76   Wed Apr 20 19:05:37 2022 Manar AmerFixedreportlasers and opticsOptical roomKBox Alignment Starting with the alignment of the KBox
using CW Koheras.

The size of the CW output from
 7x 
  75   Wed Apr 13 18:42:50 2022 Manar AmerFixedreportlasers and optics | utilitiesOptical roomSpincoater - Mirrror cleaning Used the spincoater and pure water to clean
dielectric mirrors which will be installed
inside the SBox for directing the reflection
 Reflection_one_front_after_cleaning.jpgreflection_two_front_before_cleaning.jpgReflection_two_front_after_cleaning.jpg 
  74   Fri Apr 8 19:27:12 2022 Manar AmerFixedissuedetectors and electronics | utilitiesOptical roomClean Airflow Dust measurementsDust measurement done today on  top
of the SBox average 10min

 20220408_DustMeasurement.jpg 
  73   Mon Apr 4 13:58:23 2022 Manar AmerFixedissuedetectors and electronics | utilitiesOptical roomClean Airflow Dust measurementsThe dust meter cap was cleaned using Alcohol,
and using the filter white cap the dust count
was (0 Av. 10 min)
  
  72   Thu Mar 31 13:29:01 2022 Manar AmerFixedreportmechanics | lasers and optics | utilitiesOptical roomDust Cleaning of SBoxAfter an overnight where the cavity box
was left open, a measurement of the Dust
meter was taken:
 20220331_Dust_Meter_Outside_cavity_Av10min.jpg20220331_Dust_Meter_Inside_cavity_Av10min.jpg 
  71   Wed Mar 30 18:53:01 2022 Manar AmerFixedreportmechanics | lasers and optics | utilitiesOptical roomDust Cleaning of SBoxThe inside of the cavity was cleaned today.
It was very dirty and had big dust particles
and fibers inside.
 6x 
  70   Tue Mar 29 16:27:34 2022 Manar AmerFixedreportutilitiesOptical roomSpincoater - Mirrror cleaning In preparation for cleaning the mirrors.

The spincoater has been moved with
its bump into the sas of the SBox.
  
  69   Tue Mar 29 16:23:00 2022 Manar AmerFixedreportlasers and optics | cablingOptical roomMightylaser Amplifier Migthylaser amplifier has been moved from
the SBox table to the PLIC table.

 
  
  68   Wed Mar 23 18:17:45 2022 Manar AmerFixedreportutilitiesOptical roomDust Cleaning of SBoxThe cleaning was done twice with half an
hour interval between the two times
reading on the dust meter was taken
  
  67   Wed Mar 23 18:11:22 2022 Manar AmerFixedreportutilitiesOptical roomDust Cleaning of SBoxAn Initial cleaning of the KBoX outside
was done, All the optics and mechanics placed
that were on the table were removed.
 Log_Top_window.jpgLog_Reflection_window.jpgLog_Injection_Side_window.jpgLog_Injection_side_window2.jpg 
  66   Mon Jul 5 14:46:44 2021 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical roomOEwaves CW Laser - Phase Noise correction on unit 1030 nm




  