Status of commissioning, report also here plots are reports., Page 9 of 13
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
244 Entries
Goto page
Previous
1
,
2
,
3
...
8
, 9,
10
,
11
,
12
,
13
Next
All
ID
Date
Author
Status
Type
Category
Location
Title
Text
85
Mon May 9 19:27:35 2022
Manar Amer
Fixed
report
lasers and optics | utilities
Optical room
Spincoater - Mirrror cleaning
PowerPoint shows the detailed images of
all the mirrors before and after cleaning.
Images of SBox mirrors and M1 from
84
Mon May 9 19:05:35 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
SBox Alignment
Today; replaced the M1 SBox mirror with
M1 from gamma factory , following the previous
alignment.
83
Mon May 9 18:36:48 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
SBox Alignment
Last week In FP cavity we had all SBox
mirrors including the damaged M1 mirror.
The beating was observed with just
82
Wed Apr 27 22:30:14 2022
Manar Amer
Fixed
report
lasers and optics | utilities
Optical room
Spincoater - Mirrror cleaning
Images of the SBox mirrors cleaned at the
same time when the cavity was aligned.
Directly from the spincoater to
81
Wed Apr 27 22:13:37 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
SBox Alignment
Finished the alignment of the SBox with
M1 of SBox placed, to be changed to gamma
factory mirror later
80
Tue Apr 26 20:08:10 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
SBox Alignment
Adjust the placement of
the Irises (done at the start of the
9x
79
Mon Apr 25 18:02:09 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
SBox Alignment
Remember to update the position of the
reference Irises tomorrow !!!!
78
Mon Apr 25 17:58:01 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
SBox Alignment
After pointers and Advice from Aurélien,
improvement of the beam alignment
through M1 and M2 irises was done.
77
Mon Apr 25 17:28:29 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
SBox Alignment
SBox alignment, using CW laser Koheras
power 1 mW
6x
76
Wed Apr 20 19:05:37 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
KBox Alignment
Starting with the alignment of the KBox
using CW Koheras.
The size of the CW output from
7x
75
Wed Apr 13 18:42:50 2022
Manar Amer
Fixed
report
lasers and optics | utilities
Optical room
Spincoater - Mirrror cleaning
Used the spincoater and pure water to clean
dielectric mirrors which will be installed
inside the SBox for directing the reflection
74
Fri Apr 8 19:27:12 2022
Manar Amer
Fixed
issue
detectors and electronics | utilities
Optical room
Clean Airflow Dust measurements
Dust measurement done today on top
of the SBox average 10min
73
Mon Apr 4 13:58:23 2022
Manar Amer
Fixed
issue
detectors and electronics | utilities
Optical room
Clean Airflow Dust measurements
The dust meter cap was cleaned using Alcohol,
and using the filter white cap the dust count
was (0 Av. 10 min)
72
Thu Mar 31 13:29:01 2022
Manar Amer
Fixed
report
mechanics | lasers and optics | utilities
Optical room
Dust Cleaning of SBox
After an overnight where the cavity box
was left open, a measurement of the Dust
meter was taken:
71
Wed Mar 30 18:53:01 2022
Manar Amer
Fixed
report
mechanics | lasers and optics | utilities
Optical room
Dust Cleaning of SBox
The inside of the cavity was cleaned today.
It was very dirty and had big dust particles
and fibers inside.
6x
70
Tue Mar 29 16:27:34 2022
Manar Amer
Fixed
report
utilities
Optical room
Spincoater - Mirrror cleaning
In preparation for cleaning the mirrors.
The spincoater has been moved with
its bump into the sas of the SBox.
69
Tue Mar 29 16:23:00 2022
Manar Amer
Fixed
report
lasers and optics | cabling
Optical room
Mightylaser Amplifier
Migthylaser amplifier has been moved from
the SBox table to the PLIC table.
68
Wed Mar 23 18:17:45 2022
Manar Amer
Fixed
report
utilities
Optical room
Dust Cleaning of SBox
The cleaning was done twice with half an
hour interval between the two times
reading on the dust meter was taken
67
Wed Mar 23 18:11:22 2022
Manar Amer
Fixed
report
utilities
Optical room
Dust Cleaning of SBox
An Initial cleaning of the KBoX outside
was done, All the optics and mechanics placed
that were on the table were removed.
66
Mon Jul 5 14:46:44 2021
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
OEwaves CW Laser - Phase Noise
correction on unit 1030 nm