HOME
SBOX
THOMX
MINICAV
Utilities
SBOX orders
SBOX installation
SBOX commissioning
SBOX control command
Status of commissioning, report also here plots are reports., Page 7 of 13
Not logged in
Find
|
Login
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
244 Entries
Goto page
Previous
1
,
2
,
3
...
6
, 7,
8
...
11
,
12
,
13
Next
All
ID
Date
Author
Status
Type
Category
Location
Title
Text
125
Thu Aug 11 12:11:48 2022
Ronic Chiche
Fixed
report
lasers and optics
Optical room
"ThomX" CELIA Amplifier commissionning
Beam size at the amplifier output:
to make this measurement, I switched
ON only 1st and 2nd stage.
124
Wed Aug 10 12:51:16 2022
Ronic Chiche
Fixed
report
lasers and optics
Optical room
"ThomX" CELIA Amplifier commissionning
The "ThomX" CELIA amplifier is
installed on the optical table.
I added all the rubber pieces available
123
Mon Aug 8 17:58:32 2022
Ronic Chiche
Fixed
info
lasers and optics
Optical room
Pulse duration measurement before and after CVBG (as a strecher)
I recorded the pulse shape of the MENHIR
216MHz in its fiber injection setup.
the fiber is then connected to the
122
Mon Aug 8 11:11:28 2022
Aurélien Martens
Fixed
report
utilities
Optical room
chiller for CELIA amplifier
today, temperature of the chiller has been
set to 23°C.
measured temperature in the chiller
121
Thu Jul 28 13:52:23 2022
Aurélien Martens
Fixed
report
utilities
Optical room
chiller for CELIA amplifier
The chiller of CELIA amplifier has been
moved from the corridor to the changing room
in front of PLIC.
120
Fri Jul 22 18:25:31 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CELIA amplifier installation + chiller
The software to control the CELIA amplifier
is on the laptop that was placed in ThomX
bunker.
119
Fri Jul 22 18:19:13 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CVBG stretching / Fiber Injection
Before injecting into the amplifier, the
pulse needs to be stretched using a CVBG,
type attached.
7x
118
Fri Jul 22 18:00:21 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
Alignment / Table setup
The current setup of the optical table
attached.
The cavity is aligned and the lock
117
Fri Jul 22 17:10:06 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
Installation of D-shaped mirror / Alignment
The D-shaped mirrors are installed properly
and not cutting the path of the beam.
The cavity has been aligned again
116
Fri Jul 22 17:07:32 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CELIA amplifier installation + chiller
Amplifier placed next to the pulsed laser
on the table under the airflow
The output is in free space with
115
Tue Jul 12 19:07:50 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CELIA amplifier installation
The amplifier was installed on the optical
table next to SBox table.
The CVBG that will be used for
114
Tue Jul 12 18:53:55 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
Installation of D-shaped mirror / Alignment
To prepare for the amplifier. I installed
the D-shapped mirrors after cleaning (using
aceton and ethanol) between the cavity 2
113
Tue Jul 12 14:41:55 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
FSR change & Finesse Measurements
a Finesse of 30k with the present mirrors
:
T1=120 ppm ;A1=(2.6+1) ppm;
112
Tue Jul 12 10:19:30 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
FSR change & Finesse Measurements
Yesterday evening the cavity was Vacuum
pumped up to pressure of 5.5*10^-2 and locked
changed FSR to be 216.662 MHz and
111
Tue Jul 12 10:07:05 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
FSR change & Finesse Measurements
The FSR of the 2 mirror (plan-spherical)
Cavity was adjusted from 210 MHz to reach
216.643 MHz
110
Fri Jul 8 19:37:24 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
2 Mirror Setup @ 216.6 MHz
Update for Finesse measurement, The cavity
was put under vacuum ~ 1.1*10^-1 mbar
and the alignment and coupling
109
Fri Jul 8 17:48:48 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
2 Mirror Setup @ 216.6 MHz
The cavity was realigned using irises instead
of pinholes, gave a better alignment.
The inside of the box, the spherical
108
Fri Jul 8 17:10:44 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Images of ThomX mirrors
Mirror images in the previous log showing
the metal deposit of the coating of the spherical
mirrors
107
Fri Jul 8 17:09:26 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Images of ThomX mirrors
Under the microscope,
the spherical mirrors show the
deposit of metal dots on the reflecting surface
106
Wed Jul 6 19:57:17 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
2 Mirror Setup @ 216.6 MHz
The SBox cavity setup was changed to have
only 2 mirrors M1 plane and M2 spherical,
both from ThomX
Goto page
Previous
1
,
2
,
3
...
6
, 7,
8
...
11
,
12
,
13
Next
All
ELOG V3.1.4-395e101